If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595223312003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.148358,"lon":-117.199717,"icon":""}]} |
Location: 00/12-33-059-22W5/3 | |
Location Alias: 00/12-33-59-22 W5M | |
Location Alias 2: 00/12-33-059-22 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 22 | |
Section: 33 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CELTIC HZ FIR 12-33-59-22 | |
Operator Name: XTO Energy Canada ULC | |
License Number: 0436059 | |
License Date: 2011-08-16 | |
License Status: Amended | |
Spud Date: 2011-11-02 | |
Final Drill Date: 2011-12-17 | |
Well Total Depth: 5802.00 m | |
Surface Hole Latitude: 54.148358 | |
Surface Hole Longitude: -117.199717 |
Date | Event |
---|---|
2011-08-16 | Obtained License |
2011-11-05 | Surface Casing Operation Performed |
2011-11-17 | Direction Drilling Operation Performed - Horizontal |
2011-11-26 | Production Casing Operation Performed |
2011-11-30 | Direction Drilling Operation Performed - Horizontal |
2011-12-17 | Finished Drilling |
2011-12-17 | Well Log Performed |
2011-12-17 | Well Mode changed to Drilled and Cased |
2011-12-21 | Liner Casing Operation Performed |
2011-12-21 | Perforation Treatment Performed - Open-Hole Completion |
2011-12-22 | Rig Released |
2012-01-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-12 | Well Began Production |
2012-01-12 | Well Fluid changed to Gas |
2012-01-12 | Well Mode changed to Flowing |
2014-02-01 | Well Fluid changed to Gas |
2014-02-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-17 | 2181.00 | Horizontal |
2011-11-30 | 2989.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-12-21 | Open Hole/Barefoot Completion | 5798.00 | 5802.00 | 0 |
2012-01-09 | Multi-Stage Fracture | 4574.10 | 4575.70 | 0 |
2012-01-09 | Multi-Stage Fracture | 4451.50 | 4452.50 | 0 |
2012-01-09 | Multi-Stage Fracture | 4333.70 | 4334.00 | 0 |
2012-01-09 | Multi-Stage Fracture | 4195.30 | 4195.60 | 0 |
2012-01-09 | Multi-Stage Fracture | 4061.00 | 4061.30 | 0 |
2012-01-09 | Multi-Stage Fracture | 3923.80 | 3924.10 | 0 |
2012-01-09 | Multi-Stage Fracture | 3813.10 | 3813.40 | 0 |
2012-01-10 | Multi-Stage Fracture | 3689.90 | 3691.50 | 0 |
2012-01-10 | Multi-Stage Fracture | 3574.80 | 3576.40 | 0 |
2012-01-10 | Multi-Stage Fracture | 3421.90 | 3423.50 | 0 |
2012-01-03 | Multi-Stage Fracture | 5763.40 | 5764.70 | 0 |
2012-01-10 | Multi-Stage Fracture | 3282.70 | 3284.30 | 0 |
2012-01-10 | Multi-Stage Fracture | 3154.80 | 3156.40 | 0 |
2012-01-10 | Multi-Stage Fracture | 3053.10 | 3054.70 | 0 |
2012-01-10 | Multi-Stage Fracture | 2938.30 | 2939.90 | 0 |
2012-01-10 | Multi-Stage Fracture | 2849.90 | 2851.50 | 0 |
2012-01-03 | Multi-Stage Fracture | 5549.30 | 5550.90 | 0 |
2012-01-09 | Multi-Stage Fracture | 5294.60 | 5296.20 | 0 |
2012-01-09 | Multi-Stage Fracture | 5183.70 | 5185.30 | 0 |
2012-01-09 | Multi-Stage Fracture | 5066.10 | 5067.70 | 0 |
2012-01-09 | Multi-Stage Fracture | 4955.40 | 4957.00 | 0 |
2012-01-09 | Multi-Stage Fracture | 4802.60 | 4804.20 | 0 |
2012-01-09 | Multi-Stage Fracture | 4688.40 | 4690.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7658 | 0.0 | 0.0 | 0.0 |
2013 | 7506 | 0.0 | 0.0 | 0.0 |
2014 | 6293 | 0.0 | 0.0 | 0.0 |
2015 | 6911 | 0.0 | 0.0 | 0.0 |
2016 | 6762 | 0.0 | 0.0 | 0.0 |
2017 | 6681 | 0.0 | 0.0 | 0.0 |
2018 | 7381 | 0.0 | 0.0 | 0.0 |
2019 | 7662 | 0.0 | 0.0 | 0.0 |
2020 | 2137 | 0.0 | 0.0 | 0.0 |
For data sources see[6]