If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0595221411002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.104442,"lon":-117.193467,"icon":""}]} |
| Location: 00/11-14-059-22W5/2 | |
| Location Alias: 00/11-14-59-22 W5M | |
| Location Alias 2: 00/11-14-059-22 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 059 | |
| Meridian: 5 | |
| Range: 22 | |
| Section: 14 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TALISMAN FIR 11-14-59-22 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0042721 | |
| License Date: 1972-06-09 | |
| License Status: Suspension | |
| Spud Date: 1972-06-18 | |
| Final Drill Date: 1972-07-12 | |
| Well Total Depth: 2869.70 m | |
| Surface Hole Latitude: 54.104442 | |
| Surface Hole Longitude: -117.193467 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1972-06-09 | Obtained License |
| 1972-07-12 | Finished Drilling |
| 1972-07-18 | Drill Stem Test Performed |
| 1972-07-20 | Production Casing Operation Performed |
| 1972-12-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1972-12-16 | Perforation Treatment Performed - Jet Perforation |
| 1973-01-01 | Perforation Treatment Performed - Jet Perforation |
| 1973-01-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1973-01-06 | Perforation Treatment Performed - Fractured |
| 1973-01-30 | Well Mode changed to Drilled and Cased |
| 1977-03-17 | Perforation Treatment Performed - Cement Squeeze |
| 1977-03-17 | Well Mode changed to Abandoned Zone |
| 1977-03-30 | Perforation Treatment Performed - Cement Squeeze |
| 1977-09-09 | Perforation Treatment Performed - Condensate Squeeze |
| 1979-04-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1994-07-11 | Well Log Performed |
| 1994-07-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-07-13 | Plug Back Performed |
| 1997-07-13 | Perforation Treatment Performed - Jet Perforation |
| 1997-07-15 | Perforation Treatment Performed - Fractured |
| 1997-12-01 | Well Began Production |
| 1997-12-01 | Well Fluid changed to Gas |
| 1997-12-01 | Well Mode changed to Flowing |
| 2000-10-18 | Well Log Performed |
| 2000-10-19 | Well Log Performed |
| 2000-10-22 | Perforation Treatment Performed - Jet Perforation |
| 2000-10-22 | Well Log Performed |
| 2000-10-26 | Perforation Treatment Performed - Fractured |
| 2004-09-04 | Well Fluid changed to Gas |
| 2004-09-04 | Well Mode changed to Flowing |
| 2004-09-14 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-01 | Well Fluid changed to Gas |
| 2011-02-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1972-12-16 | Perforation | 2787.70 | 2790.40 | 7 |
| 1979-04-10 | Acid Treatment | 2787.70 | 2790.40 | 0 |
| 1994-07-13 | Packing Device Capped w/Cement | 2748.40 | 2756.20 | 0 |
| 1997-07-13 | Perforation | 2656.20 | 2662.70 | 13 |
| 1997-07-13 | Perforation | 2664.60 | 2668.20 | 13 |
| 1997-07-15 | Fracture | 2656.20 | 2668.20 | 0 |
| 2000-10-22 | Perforation | 2329.00 | 2330.50 | 13 |
| 2000-10-26 | Fracture | 2329.00 | 2330.50 | 0 |
| 2004-09-14 | Perforation | 2629.90 | 2630.70 | 12 |
| 1972-12-16 | Acid Treatment | 2787.70 | 2790.40 | 0 |
| 1973-01-01 | Perforation | 2657.20 | 2662.70 | 7 |
| 1973-01-01 | Perforation | 2664.60 | 2666.70 | 7 |
| 1973-01-03 | Acid Treatment | 2657.20 | 2666.70 | 0 |
| 1973-01-06 | Fracture | 2657.20 | 2666.70 | 0 |
| 1977-03-17 | Cement Squeeze | 2657.20 | 2666.70 | 0 |
| 1977-03-30 | Cement Squeeze | 2657.20 | 2666.70 | 0 |
| 1977-09-09 | Condensate Squeeze | 2787.70 | 2790.40 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1997 | 504 | 0.0 | 0.0 | 0.0 |
| 1998 | 3064 | 0.0 | 0.0 | 0.0 |
| 1999 | 3011 | 0.0 | 0.0 | 0.0 |
| 2000 | 384 | 0.0 | 0.0 | 0.0 |
| 2004 | 2762 | 0.0 | 0.0 | 0.0 |
| 2005 | 5471 | 0.0 | 0.0 | 0.0 |
| 2006 | 2208 | 0.0 | 0.0 | 0.0 |
| 2007 | 1680 | 0.0 | 0.0 | 0.0 |
| 2008 | 7200 | 0.0 | 0.0 | 0.0 |
| 2009 | 144 | 0.0 | 0.0 | 0.0 |
For data sources see[5]