If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0595221115020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.07888,"lon":-117.176783,"icon":""}]} |
| Location: 02/15-11-059-22W5/0 | |
| Location Alias: 02/15-11-59-22 W5M | |
| Location Alias 2: 02/15-11-059-22 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 059 | |
| Meridian: 5 | |
| Range: 22 | |
| Section: 11 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TALISMAN ET AL 02 HZ FIR 15-11-59-22 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0437280 | |
| License Date: 2011-09-29 | |
| License Status: Issued | |
| Spud Date: 2011-10-10 | |
| Final Drill Date: 2011-11-02 | |
| Well Total Depth: 3349.00 m | |
| Surface Hole Latitude: 54.078880 | |
| Surface Hole Longitude: -117.176783 |
| Date | Event |
|---|---|
| 2011-09-29 | Obtained License |
| 2011-10-12 | Surface Casing Operation Performed |
| 2011-10-14 | Well Log Performed |
| 2011-10-16 | Direction Drilling Operation Performed - Horizontal |
| 2011-10-20 | Well Log Performed |
| 2011-10-22 | Intermediate Casing Operation Performed |
| 2011-11-02 | Finished Drilling |
| 2011-11-02 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-11-02 | Well Log Performed |
| 2011-11-02 | Well Mode changed to Drilled and Cased |
| 2011-11-06 | Production Casing Operation Performed |
| 2011-11-07 | Rig Released |
| 2011-11-16 | Well Log Performed |
| 2011-11-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-12-20 | Well Began Production |
| 2011-12-20 | Well Fluid changed to Crude Oil |
| 2011-12-20 | Well Mode changed to Flowing |
| 2012-02-14 | Well Fluid changed to Crude Oil |
| 2012-02-14 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-10-16 | 1617.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-11-02 | Open Hole/Barefoot Completion | 3346.00 | 3349.00 | 0 |
| 2011-11-26 | Multi-Stage Fracture | 2613.30 | 2613.40 | 0 |
| 2011-11-26 | Multi-Stage Fracture | 2550.50 | 2550.60 | 0 |
| 2011-11-26 | Multi-Stage Fracture | 2474.40 | 2474.50 | 0 |
| 2011-11-26 | Multi-Stage Fracture | 2345.50 | 2345.60 | 0 |
| 2011-11-26 | Multi-Stage Fracture | 2295.90 | 2296.00 | 0 |
| 2011-11-27 | Multi-Stage Fracture | 2246.40 | 2246.50 | 0 |
| 2011-11-27 | Multi-Stage Fracture | 2157.10 | 2157.20 | 0 |
| 2011-11-24 | Multi-Stage Fracture | 3328.10 | 3328.20 | 0 |
| 2011-11-25 | Multi-Stage Fracture | 3199.00 | 3199.10 | 0 |
| 2011-11-25 | Multi-Stage Fracture | 3109.70 | 3109.80 | 0 |
| 2011-11-26 | Multi-Stage Fracture | 3020.30 | 3020.40 | 0 |
| 2011-11-26 | Multi-Stage Fracture | 2944.20 | 2944.30 | 0 |
| 2011-11-26 | Multi-Stage Fracture | 2881.40 | 2881.50 | 0 |
| 2011-11-26 | Multi-Stage Fracture | 2778.80 | 2778.90 | 0 |
| 2011-11-26 | Multi-Stage Fracture | 2702.70 | 2702.80 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 288 | 0.0 | 0.0 | 0.0 |
| 2012 | 6914 | 0.0 | 0.0 | 0.0 |
| 2013 | 7397 | 0.0 | 0.0 | 0.0 |
| 2014 | 7809 | 0.0 | 0.0 | 0.0 |
| 2015 | 8333 | 0.0 | 0.0 | 0.0 |
| 2016 | 8260 | 0.0 | 0.0 | 0.0 |
| 2017 | 4532 | 0.0 | 0.0 | 0.0 |
| 2018 | 6971 | 0.0 | 0.0 | 0.0 |
| 2019 | 5491 | 0.0 | 0.0 | 0.0 |
| 2020 | 1487 | 0.0 | 0.0 | 0.0 |
For data sources see[6]