X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595221115020

Well Details

Well ID: 0595221115020
Loading map...
Location: 02/15-11-059-22W5/0
Location Alias: 02/15-11-59-22 W5M
Location Alias 2: 02/15-11-059-22 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 22
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN ET AL 02 HZ FIR 15-11-59-22
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0437280
License Date: 2011-09-29
License Status: Issued
Spud Date: 2011-10-10
Final Drill Date: 2011-11-02
Well Total Depth: 3349.00 m
Surface Hole Latitude: 54.078880
Surface Hole Longitude: -117.176783

For data sources see[1][2]

Well History

Date Event
2011-09-29 Obtained License
2011-10-12 Surface Casing Operation Performed
2011-10-14 Well Log Performed
2011-10-16 Direction Drilling Operation Performed - Horizontal
2011-10-20 Well Log Performed
2011-10-22 Intermediate Casing Operation Performed
2011-11-02 Finished Drilling
2011-11-02 Perforation Treatment Performed - Open-Hole Completion
2011-11-02 Well Log Performed
2011-11-02 Well Mode changed to Drilled and Cased
2011-11-06 Production Casing Operation Performed
2011-11-07 Rig Released
2011-11-16 Well Log Performed
2011-11-24 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-20 Well Began Production
2011-12-20 Well Fluid changed to Crude Oil
2011-12-20 Well Mode changed to Flowing
2012-02-14 Well Fluid changed to Crude Oil
2012-02-14 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-16 1617.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-02 Open Hole/Barefoot Completion 3346.00 3349.00 0
2011-11-26 Multi-Stage Fracture 2613.30 2613.40 0
2011-11-26 Multi-Stage Fracture 2550.50 2550.60 0
2011-11-26 Multi-Stage Fracture 2474.40 2474.50 0
2011-11-26 Multi-Stage Fracture 2345.50 2345.60 0
2011-11-26 Multi-Stage Fracture 2295.90 2296.00 0
2011-11-27 Multi-Stage Fracture 2246.40 2246.50 0
2011-11-27 Multi-Stage Fracture 2157.10 2157.20 0
2011-11-24 Multi-Stage Fracture 3328.10 3328.20 0
2011-11-25 Multi-Stage Fracture 3199.00 3199.10 0
2011-11-25 Multi-Stage Fracture 3109.70 3109.80 0
2011-11-26 Multi-Stage Fracture 3020.30 3020.40 0
2011-11-26 Multi-Stage Fracture 2944.20 2944.30 0
2011-11-26 Multi-Stage Fracture 2881.40 2881.50 0
2011-11-26 Multi-Stage Fracture 2778.80 2778.90 0
2011-11-26 Multi-Stage Fracture 2702.70 2702.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 288 0.0 0.0 0.0
2012 6914 0.0 0.0 0.0
2013 7397 0.0 0.0 0.0
2014 7809 0.0 0.0 0.0
2015 8333 0.0 0.0 0.0
2016 8260 0.0 0.0 0.0
2017 4532 0.0 0.0 0.0
2018 6971 0.0 0.0 0.0
2019 5491 0.0 0.0 0.0
2020 1487 0.0 0.0 0.0

For data sources see[6]

References