If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595220909000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.089122,"lon":-117.231989,"icon":""}]} |
Location: 00/09-09-059-22W5/0 | |
Location Alias: 00/09-09-59-22 W5M | |
Location Alias 2: 00/09-09-059-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 22 | |
Section: 09 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TALISMAN FIR 9-9-59-22 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0201761 | |
License Date: 1997-05-27 | |
License Status: Issued | |
Spud Date: 1997-08-26 | |
Final Drill Date: 1997-09-12 | |
Well Total Depth: 2917.00 m | |
Surface Hole Latitude: 54.089122 | |
Surface Hole Longitude: -117.231989 |
Date | Event |
---|---|
1997-05-27 | Obtained License |
1997-08-28 | Surface Casing Operation Performed |
1997-09-01 | Lost Circulation Occurred |
1997-09-12 | Finished Drilling |
1997-09-12 | Well Log Performed |
1997-09-13 | Well Log Performed |
1997-09-16 | Drill Stem Test Performed |
1997-09-17 | Drill Stem Test Performed |
1997-09-24 | Production Casing Operation Performed |
1997-09-25 | Rig Released |
1997-09-25 | Well Mode changed to Drilled and Cased |
1997-10-28 | Well Log Performed |
1997-10-29 | Well Log Performed |
1997-11-01 | Perforation Treatment Performed - Jet Perforation |
1997-11-01 | Well Log Performed |
1997-11-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-11-07 | Perforation Treatment Performed - Fractured |
1997-11-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-11-13 | Plug Back Performed |
1997-11-13 | Well Log Performed |
1997-11-15 | Perforation Treatment Performed - Jet Perforation |
1997-11-15 | Well Log Performed |
1997-11-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-11-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-11-21 | Plug Back Performed |
1997-11-24 | Perforation Treatment Performed - Jet Perforation |
1997-11-24 | Well Log Performed |
1997-11-25 | Perforation Treatment Performed - Fractured |
2005-08-09 | Well Log Performed |
2005-08-12 | Perforation Treatment Performed - Fractured |
2005-08-24 | Perforation Treatment Performed - Jet Perforation |
2005-08-24 | Well Log Performed |
2005-08-26 | Perforation Treatment Performed - Jet Perforation |
2005-08-26 | Well Log Performed |
2005-08-27 | Perforation Treatment Performed - Fractured |
2008-02-01 | Well Began Production |
2008-02-01 | Well Fluid changed to Gas |
2008-02-01 | Well Mode changed to Flowing |
2017-07-01 | Well Fluid changed to Gas |
2017-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-11-01 | Perforation | 2873.50 | 2878.00 | 17 |
1997-11-24 | Perforation | 2754.00 | 2759.00 | 13 |
1997-11-24 | Perforation | 2743.50 | 2746.50 | 13 |
1997-11-25 | Fracture | 2743.50 | 2759.00 | 0 |
2005-08-12 | Fracture | 2743.50 | 2764.00 | 0 |
2005-08-24 | Perforation | 2339.00 | 2342.00 | 20 |
2005-08-26 | Perforation | 2239.00 | 2242.00 | 20 |
2005-08-27 | Fracture | 2239.00 | 2242.00 | 0 |
1997-11-05 | Acid Treatment | 2878.00 | 2879.50 | 0 |
1997-11-07 | Fracture | 2878.00 | 2879.50 | 0 |
1997-11-13 | Packing Device Capped w/Cement | 2850.00 | 2858.00 | 0 |
1997-11-15 | Perforation | 2754.00 | 2764.00 | 16 |
1997-11-15 | Perforation | 2743.50 | 2746.50 | 16 |
1997-11-17 | Acid Treatment | 2743.50 | 2764.00 | 0 |
1997-11-21 | Packing Device Capped w/Cement | 2743.50 | 2764.00 | 0 |
1997-11-24 | Perforation | 2759.00 | 2764.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 7276 | 0.0 | 0.0 | 0.0 |
2009 | 4848 | 0.0 | 0.0 | 0.0 |
2010 | 8131 | 0.0 | 0.0 | 0.0 |
2011 | 4986 | 0.0 | 0.0 | 0.0 |
2012 | 8007 | 0.0 | 0.0 | 0.0 |
2013 | 8499 | 0.0 | 0.0 | 0.0 |
2014 | 8448 | 0.0 | 0.0 | 0.0 |
2015 | 8687 | 0.0 | 0.0 | 0.0 |
2016 | 8340 | 0.0 | 0.0 | 0.0 |
2017 | 8339 | 0.0 | 0.0 | 0.0 |
2018 | 8298 | 0.0 | 0.0 | 0.0 |
2019 | 7848 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1997-09-01 | Lost Circulation | 1565.00 | 1985.00 |
For data sources see[6]