X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595220115000

Well Details

Well ID: 0595220115000
Loading map...
Location: 00/15-01-059-22W5/0
Location Alias: 00/15-01-59-22 W5M
Location Alias 2: 00/15-01-059-22 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 22
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN ET AL HZ FIR 15-1-59-22
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0437969
License Date: 2011-10-25
License Status: Issued
Spud Date: 2012-01-28
Final Drill Date: 2012-02-22
Well Total Depth: 3420.00 m
Surface Hole Latitude: 54.065078
Surface Hole Longitude: -117.160108

For data sources see[1][2]

Well History

Date Event
2011-10-25 Obtained License
2012-01-31 Surface Casing Operation Performed
2012-02-04 Direction Drilling Operation Performed - Horizontal
2012-02-04 Well Log Performed
2012-02-07 Well Log Performed
2012-02-09 Intermediate Casing Operation Performed
2012-02-22 Finished Drilling
2012-02-22 Perforation Treatment Performed - Open-Hole Completion
2012-02-22 Well Log Performed
2012-02-22 Well Mode changed to Drilled and Cased
2012-02-24 Well Log Performed
2012-02-27 Production Casing Operation Performed
2012-02-27 Rig Released
2012-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-17 Well Began Production
2012-04-17 Well Fluid changed to Crude Oil
2012-04-17 Well Mode changed to Flowing
2017-07-01 Well Fluid changed to Crude Oil
2017-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-28 Ensign Drilling Inc. 52 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-04 1597.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-22 Open Hole/Barefoot Completion 3408.00 3420.00 0
2012-03-14 Multi-Stage Fracture 2785.00 2785.10 0
2012-03-14 Multi-Stage Fracture 2705.00 2705.10 0
2012-03-14 Multi-Stage Fracture 2640.00 2640.10 0
2012-03-14 Multi-Stage Fracture 2575.00 2575.10 0
2012-03-15 Multi-Stage Fracture 2495.00 2495.10 0
2012-03-15 Multi-Stage Fracture 2425.00 2425.10 0
2012-03-15 Multi-Stage Fracture 2181.00 2181.10 0
2012-03-12 Multi-Stage Fracture 3380.00 3380.10 0
2012-03-12 Multi-Stage Fracture 3307.00 3307.10 0
2012-03-12 Multi-Stage Fracture 3230.00 3230.10 0
2012-03-12 Multi-Stage Fracture 3160.00 3160.10 0
2012-03-13 Multi-Stage Fracture 3080.00 3080.10 0
2012-03-13 Multi-Stage Fracture 3010.00 3010.10 0
2012-03-14 Multi-Stage Fracture 2940.00 2940.10 0
2012-03-14 Multi-Stage Fracture 2860.00 2860.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4652 0.0 0.0 0.0
2013 7419 0.0 0.0 0.0
2014 7195 0.0 0.0 0.0
2015 8217 0.0 0.0 0.0
2016 6712 0.0 0.0 0.0
2017 3095 0.0 0.0 0.0
2018 6974 0.0 0.0 0.0
2019 3570 0.0 0.0 0.0
2020 1668 0.0 0.0 0.0

For data sources see[7]

References