If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595220115000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.065078,"lon":-117.160108,"icon":""}]} |
Location: 00/15-01-059-22W5/0 | |
Location Alias: 00/15-01-59-22 W5M | |
Location Alias 2: 00/15-01-059-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 22 | |
Section: 01 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TALISMAN ET AL HZ FIR 15-1-59-22 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0437969 | |
License Date: 2011-10-25 | |
License Status: Issued | |
Spud Date: 2012-01-28 | |
Final Drill Date: 2012-02-22 | |
Well Total Depth: 3420.00 m | |
Surface Hole Latitude: 54.065078 | |
Surface Hole Longitude: -117.160108 |
Date | Event |
---|---|
2011-10-25 | Obtained License |
2012-01-31 | Surface Casing Operation Performed |
2012-02-04 | Direction Drilling Operation Performed - Horizontal |
2012-02-04 | Well Log Performed |
2012-02-07 | Well Log Performed |
2012-02-09 | Intermediate Casing Operation Performed |
2012-02-22 | Finished Drilling |
2012-02-22 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-22 | Well Log Performed |
2012-02-22 | Well Mode changed to Drilled and Cased |
2012-02-24 | Well Log Performed |
2012-02-27 | Production Casing Operation Performed |
2012-02-27 | Rig Released |
2012-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-04-17 | Well Began Production |
2012-04-17 | Well Fluid changed to Crude Oil |
2012-04-17 | Well Mode changed to Flowing |
2017-07-01 | Well Fluid changed to Crude Oil |
2017-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-28 | Ensign Drilling Inc. | 52 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-04 | 1597.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-22 | Open Hole/Barefoot Completion | 3408.00 | 3420.00 | 0 |
2012-03-14 | Multi-Stage Fracture | 2785.00 | 2785.10 | 0 |
2012-03-14 | Multi-Stage Fracture | 2705.00 | 2705.10 | 0 |
2012-03-14 | Multi-Stage Fracture | 2640.00 | 2640.10 | 0 |
2012-03-14 | Multi-Stage Fracture | 2575.00 | 2575.10 | 0 |
2012-03-15 | Multi-Stage Fracture | 2495.00 | 2495.10 | 0 |
2012-03-15 | Multi-Stage Fracture | 2425.00 | 2425.10 | 0 |
2012-03-15 | Multi-Stage Fracture | 2181.00 | 2181.10 | 0 |
2012-03-12 | Multi-Stage Fracture | 3380.00 | 3380.10 | 0 |
2012-03-12 | Multi-Stage Fracture | 3307.00 | 3307.10 | 0 |
2012-03-12 | Multi-Stage Fracture | 3230.00 | 3230.10 | 0 |
2012-03-12 | Multi-Stage Fracture | 3160.00 | 3160.10 | 0 |
2012-03-13 | Multi-Stage Fracture | 3080.00 | 3080.10 | 0 |
2012-03-13 | Multi-Stage Fracture | 3010.00 | 3010.10 | 0 |
2012-03-14 | Multi-Stage Fracture | 2940.00 | 2940.10 | 0 |
2012-03-14 | Multi-Stage Fracture | 2860.00 | 2860.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4652 | 0.0 | 0.0 | 0.0 |
2013 | 7419 | 0.0 | 0.0 | 0.0 |
2014 | 7195 | 0.0 | 0.0 | 0.0 |
2015 | 8217 | 0.0 | 0.0 | 0.0 |
2016 | 6712 | 0.0 | 0.0 | 0.0 |
2017 | 3095 | 0.0 | 0.0 | 0.0 |
2018 | 6974 | 0.0 | 0.0 | 0.0 |
2019 | 3570 | 0.0 | 0.0 | 0.0 |
2020 | 1668 | 0.0 | 0.0 | 0.0 |
For data sources see[7]