If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595220113000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.065078,"lon":-117.160567,"icon":""}]} |
Location: 00/13-01-059-22W5/0 | |
Location Alias: 00/13-01-59-22 W5M | |
Location Alias 2: 00/13-01-059-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 22 | |
Section: 01 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TALISMAN ET AL HZ FIR 13-1-59-22 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0437967 | |
License Date: 2011-10-25 | |
License Status: Suspension | |
Spud Date: 2011-11-13 | |
Final Drill Date: 2011-12-13 | |
Well Total Depth: 3702.00 m | |
Surface Hole Latitude: 54.065078 | |
Surface Hole Longitude: -117.160567 |
Date | Event |
---|---|
2011-10-25 | Obtained License |
2011-11-16 | Surface Casing Operation Performed |
2011-11-18 | Well Log Performed |
2011-11-20 | Direction Drilling Operation Performed - Horizontal |
2011-11-22 | Well Log Performed |
2011-11-28 | Intermediate Casing Operation Performed |
2011-12-13 | Finished Drilling |
2011-12-13 | Perforation Treatment Performed - Open-Hole Completion |
2011-12-13 | Well Log Performed |
2011-12-13 | Well Mode changed to Drilled and Cased |
2011-12-16 | Production Casing Operation Performed |
2011-12-18 | Rig Released |
2012-07-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-19 | Well Began Production |
2012-09-19 | Well Fluid changed to Crude Oil |
2012-09-19 | Well Mode changed to Flowing |
2016-02-01 | Well Fluid changed to Crude Oil |
2016-02-01 | Well Mode changed to Suspended |
2018-02-28 | Well Fluid changed to Crude Oil |
2018-02-28 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-20 | 1644.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-12-13 | Open Hole/Barefoot Completion | 3697.00 | 3702.00 | 0 |
2012-07-15 | Multi-Stage Fracture | 3069.60 | 3069.70 | 0 |
2012-07-15 | Multi-Stage Fracture | 2999.10 | 2999.20 | 0 |
2012-07-15 | Multi-Stage Fracture | 2903.40 | 2903.50 | 0 |
2012-07-15 | Multi-Stage Fracture | 2796.00 | 2796.10 | 0 |
2012-07-15 | Multi-Stage Fracture | 2678.30 | 2678.40 | 0 |
2012-07-15 | Multi-Stage Fracture | 2582.90 | 2583.00 | 0 |
2012-07-16 | Multi-Stage Fracture | 2485.70 | 2485.80 | 0 |
2012-07-16 | Multi-Stage Fracture | 2374.70 | 2374.80 | 0 |
2012-07-16 | Multi-Stage Fracture | 2268.70 | 2268.80 | 0 |
2012-07-16 | Multi-Stage Fracture | 2164.70 | 2164.80 | 0 |
2012-07-14 | Multi-Stage Fracture | 3675.10 | 3675.20 | 0 |
2012-07-14 | Multi-Stage Fracture | 3587.20 | 3587.30 | 0 |
2012-07-15 | Multi-Stage Fracture | 3530.70 | 3530.80 | 0 |
2012-07-15 | Multi-Stage Fracture | 3461.70 | 3461.80 | 0 |
2012-07-15 | Multi-Stage Fracture | 3392.90 | 3393.00 | 0 |
2012-07-15 | Multi-Stage Fracture | 3298.80 | 3298.90 | 0 |
2012-07-15 | Multi-Stage Fracture | 3219.90 | 3220.00 | 0 |
2012-07-15 | Multi-Stage Fracture | 3139.30 | 3139.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2470 | 0.0 | 0.0 | 0.0 |
2013 | 8451 | 0.0 | 0.0 | 0.0 |
2014 | 6496 | 0.0 | 0.0 | 0.0 |
2018 | 3446 | 0.0 | 0.0 | 0.0 |
2019 | 5951 | 0.0 | 0.0 | 0.0 |
2020 | 1440 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]