X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595210416002

Well Details

Well ID: 0595210416002
Loading map...
Location: 00/16-04-059-21W5/2
Location Alias: 00/16-04-59-21 W5M
Location Alias 2: 00/16-04-059-21 W5/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 21
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL 16-4-59-21 KAYBOBS 1-4-59-21
Operator Name: Paramount Resources Ltd.
License Number: 0410122
License Date: 2009-04-15
License Status: Amended
Spud Date: 2009-04-22
Final Drill Date: 2009-07-19
Well Total Depth: 4240.00 m
Surface Hole Latitude: 54.064609
Surface Hole Longitude: -117.073529

For data sources see[1][2]

Well History

Date Event
2009-04-15 Obtained License
2009-04-24 Surface Casing Operation Performed
2009-05-02 Direction Drilling Operation Performed - Horizontal
2009-06-17 Direction Drilling Operation Performed - Sidetrack Fish
2009-07-03 Well Log Performed
2009-07-05 Intermediate Casing Operation Performed
2009-07-19 Finished Drilling
2009-07-19 Well Log Performed
2009-07-19 Well Mode changed to Drilled and Cased
2009-07-21 Liner Casing Operation Performed
2009-07-25 Rig Released
2009-08-04 Perforation Treatment Performed - Multi-Stage Fracture
2009-08-05 Perforation Treatment Performed - Multi-Stage Fracture
2009-08-10 Perforation Treatment Performed - Multi-Stage Fracture
2009-10-28 Well Began Production
2009-10-28 Well Fluid changed to Gas
2009-10-28 Well Mode changed to Flowing
2011-10-16 Well Fluid changed to Gas
2011-10-16 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-05-02 2314.00 Horizontal
2009-06-17 2618.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-08-04 Multi-Stage Fracture 3452.20 3452.30 0
2009-08-10 Multi-Stage Fracture 3235.90 3236.00 0
2009-08-04 Multi-Stage Fracture 3567.90 3568.00 0
2009-08-04 Multi-Stage Fracture 3670.50 3670.60 0
2009-08-04 Multi-Stage Fracture 3785.10 3785.20 0
2009-08-05 Multi-Stage Fracture 4226.10 4226.20 0
2009-08-05 Multi-Stage Fracture 4115.80 4115.90 0
2009-08-05 Multi-Stage Fracture 4002.20 4002.30 0
2009-08-05 Multi-Stage Fracture 3899.60 3900.00 0
2009-08-10 Multi-Stage Fracture 3350.70 3350.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1459 0.0 0.0 0.0
2010 7803 0.0 0.0 0.0
2011 2891 0.0 0.0 0.0
2012 3717 0.0 0.0 0.0
2013 2836 0.0 0.0 0.0
2014 1491 0.0 0.0 0.0
2015 5999 0.0 0.0 0.0
2016 6956 0.0 0.0 0.0
2017 6718 0.0 0.0 0.0
2018 816 0.0 0.0 0.0
2019 24 0.0 0.0 0.0

For data sources see[6]

References