X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595210113000

Well Details

Well ID: 0595210113000
Loading map...
Location: 00/13-01-059-21W5/0
Location Alias: 00/13-01-59-21 W5M
Location Alias 2: 00/13-01-059-21 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 21
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL FIR 13-1-59-21
Operator Name: Paramount Resources Ltd.
License Number: 0434094
License Date: 2011-06-06
License Status: Amended
Spud Date: 2011-11-08
Final Drill Date: 2011-11-28
Well Total Depth: 3530.00 m
Surface Hole Latitude: 54.069365
Surface Hole Longitude: -117.020678

For data sources see[1][2]

Well History

Date Event
2011-06-06 Obtained License
2011-10-12 Well Log Performed
2011-11-09 Direction Drilling Operation Performed - Deviate
2011-11-11 Surface Casing Operation Performed
2011-11-12 Well Log Performed
2011-11-20 Well Log Performed
2011-11-23 Intermediate Casing Operation Performed
2011-11-24 Direction Drilling Operation Performed - Horizontal
2011-11-28 Finished Drilling
2011-11-28 Well Log Performed
2011-11-28 Well Mode changed to Drilled and Cased
2011-11-30 Liner Casing Operation Performed
2011-12-05 Rig Released
2011-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-21 Well Began Production
2011-12-21 Well Fluid changed to Gas
2011-12-21 Well Mode changed to Flowing
2012-07-21 Well Log Performed
2014-12-09 Well Fluid changed to Gas
2014-12-09 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-09 302.00 Deviate (5 - 79 degrees)
2011-11-24 2763.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-19 Multi-Stage Fracture 2787.00 2787.10 0
2011-12-19 Multi-Stage Fracture 2888.90 2889.00 0
2011-12-19 Multi-Stage Fracture 2992.90 2993.00 0
2011-12-19 Multi-Stage Fracture 3081.30 3081.40 0
2011-12-19 Multi-Stage Fracture 3184.00 3184.10 0
2011-12-19 Multi-Stage Fracture 3287.10 3287.20 0
2011-12-19 Multi-Stage Fracture 3374.20 3374.30 0
2011-12-19 Multi-Stage Fracture 3480.00 3480.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 21 0.0 0.0 0.0
2012 6841 0.0 0.0 0.0
2013 8483 0.0 0.0 0.0
2014 7167 0.0 0.0 0.0
2015 8302 0.0 0.0 0.0
2016 8313 0.0 0.0 0.0
2017 6656 0.0 0.0 0.0
2018 7799 0.0 0.0 0.0
2019 168 0.0 0.0 0.0
2020 383 0.0 0.0 0.0

For data sources see[6]

References