X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595203608000

Well Details

Well ID: 0595203608000
Loading map...
Location: 00/08-36-059-20W5/0
Location Alias: 00/08-36-59-20 W5M
Location Alias 2: 00/08-36-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 8-36-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0415761
License Date: 2009-12-17
License Status: Amended
Spud Date: 2010-01-07
Final Drill Date: 2010-02-06
Well Total Depth: 4004.00 m
Surface Hole Latitude: 54.141928
Surface Hole Longitude: -116.878619

For data sources see[1][2]

Well History

Date Event
2009-12-17 Obtained License
2010-01-07 Lost Circulation Occurred
2010-01-08 Lost Circulation Occurred
2010-01-14 Surface Casing Operation Performed
2010-01-27 Intermediate Casing Operation Performed
2010-01-28 Direction Drilling Operation Performed - Horizontal
2010-02-06 Finished Drilling
2010-02-06 Well Mode changed to Drilled and Cased
2010-02-07 Well Log Performed
2010-02-11 Liner Casing Operation Performed
2010-02-12 Rig Released
2010-02-16 Well Log Performed
2010-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2010-02-21 Perforation Treatment Performed - Open-Hole Completion
2010-02-23 Well Began Production
2010-02-23 Well Fluid changed to Gas
2010-02-23 Well Mode changed to Flowing
2010-02-27 Well Log Performed
2013-12-17 Well Fluid changed to Gas
2013-12-17 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-28 2160.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-21 Open Hole/Barefoot Completion 3998.00 4004.00 0
2010-02-21 Multi-Stage Fracture 3220.70 3220.80 0
2010-02-21 Multi-Stage Fracture 3118.00 3118.10 0
2010-02-21 Multi-Stage Fracture 3025.50 3025.60 0
2010-02-21 Multi-Stage Fracture 2923.30 2923.40 0
2010-02-21 Multi-Stage Fracture 2830.10 2830.20 0
2010-02-21 Multi-Stage Fracture 2726.10 2726.20 0
2010-02-21 Multi-Stage Fracture 2658.60 2658.70 0
2010-02-21 Multi-Stage Fracture 3975.60 3975.70 0
2010-02-21 Multi-Stage Fracture 3917.00 3917.10 0
2010-02-21 Multi-Stage Fracture 3824.80 3824.90 0
2010-02-21 Multi-Stage Fracture 3695.00 3695.10 0
2010-02-21 Multi-Stage Fracture 3601.30 3601.40 0
2010-02-21 Multi-Stage Fracture 3509.80 3509.90 0
2010-02-21 Multi-Stage Fracture 3405.40 3405.50 0
2010-02-21 Multi-Stage Fracture 3312.20 3312.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6752 0.0 0.0 0.0
2011 8567 0.0 0.0 0.0
2012 8615 0.0 0.0 0.0
2013 8087 0.0 0.0 0.0
2014 8111 0.0 0.0 0.0
2015 6887 0.0 0.0 0.0
2016 6167 0.0 0.0 0.0
2017 6768 0.0 0.0 0.0
2018 8423 0.0 0.0 0.0
2019 8471 0.0 0.0 0.0
2020 1656 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-01-07 Lost Circulation 17.00 17.00
2010-01-08 Lost Circulation 139.00 139.00
2010-03-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References