X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595203601000

Well Details

Well ID: 0595203601000
Loading map...
Location: 00/01-36-059-20W5/0
Location Alias: 00/01-36-59-20 W5M
Location Alias 2: 00/01-36-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 1-36-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0429910
License Date: 2011-01-13
License Status: Issued
Spud Date: 2011-01-28
Final Drill Date: 2011-02-24
Well Total Depth: 4075.00 m
Surface Hole Latitude: 54.141059
Surface Hole Longitude: -116.878622

For data sources see[1][2]

Well History

Date Event
2011-01-13 Obtained License
2011-01-29 Lost Circulation Occurred
2011-01-31 Surface Casing Operation Performed
2011-02-11 Direction Drilling Operation Performed - Horizontal
2011-02-17 Intermediate Casing Operation Performed
2011-02-24 Finished Drilling
2011-02-24 Well Mode changed to Drilled and Cased
2011-02-25 Well Log Performed
2011-02-28 Liner Casing Operation Performed
2011-02-28 Rig Released
2011-03-05 Well Log Performed
2011-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-17 Perforation Treatment Performed - Open-Hole Completion
2011-03-19 Well Began Production
2011-03-19 Well Fluid changed to Gas
2011-03-19 Well Mode changed to Flowing
2014-03-10 Well Fluid changed to Gas
2014-03-10 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-11 2511.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-17 Open Hole/Barefoot Completion 4071.00 4075.00 0
2011-03-17 Multi-Stage Fracture 3445.00 3531.50 0
2011-03-17 Multi-Stage Fracture 3370.00 3444.90 0
2011-03-17 Multi-Stage Fracture 3296.70 3369.90 0
2011-03-17 Multi-Stage Fracture 3210.20 3296.60 0
2011-03-17 Multi-Stage Fracture 3135.20 3210.10 0
2011-03-17 Multi-Stage Fracture 3060.70 3135.10 0
2011-03-17 Multi-Stage Fracture 2985.90 3060.60 0
2011-03-17 Multi-Stage Fracture 2922.40 2985.80 0
2011-03-17 Multi-Stage Fracture 4050.10 4075.00 0
2011-03-17 Multi-Stage Fracture 3995.00 4050.00 0
2011-03-17 Multi-Stage Fracture 3919.30 3994.90 0
2011-03-17 Multi-Stage Fracture 3842.90 3919.20 0
2011-03-17 Multi-Stage Fracture 3756.60 3842.80 0
2011-03-17 Multi-Stage Fracture 3681.70 3756.50 0
2011-03-17 Multi-Stage Fracture 3606.70 3681.60 0
2011-03-17 Multi-Stage Fracture 3531.60 3606.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5256 0.0 0.0 0.0
2012 8184 0.0 0.0 0.0
2013 7871 0.0 0.0 0.0
2014 7656 0.0 0.0 0.0
2015 2064 0.0 0.0 0.0
2016 6935 0.0 0.0 0.0
2017 8640 0.0 0.0 0.0
2018 7967 0.0 0.0 0.0
2019 8591 0.0 0.0 0.0
2020 1967 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-01-29 Lost Circulation 33.00 584.00

For data sources see[7]

References