X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595203314000

Well Details

Well ID: 0595203314000
Loading map...
Location: 00/14-33-059-20W5/0
Location Alias: 00/14-33-59-20 W5M
Location Alias 2: 00/14-33-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 33
County/Municipality: Municipal District of Greenview No. 16
Well Name: 2214896AB KAYBOBS 14-33-59-20
Operator Name: 2214896 Alberta Ltd.
License Number: 0435940
License Date: 2011-08-11
License Status: Issued
Spud Date: 2011-09-30
Final Drill Date: 2011-10-16
Well Total Depth: 3095.00 m
Surface Hole Latitude: 54.137008
Surface Hole Longitude: -116.942339

For data sources see[1][2]

Well History

Date Event
2011-08-11 Obtained License
2011-09-30 Lost Circulation Occurred
2011-10-03 Lost Circulation Occurred
2011-10-05 Surface Casing Operation Performed
2011-10-08 Direction Drilling Operation Performed - Horizontal
2011-10-10 Well Log Performed
2011-10-11 Intermediate Casing Operation Performed
2011-10-16 Finished Drilling
2011-10-16 Well Log Performed
2011-10-16 Well Mode changed to Drilled and Cased
2011-10-19 Liner Casing Operation Performed
2011-10-19 Perforation Treatment Performed - Open-Hole Completion
2011-10-20 Rig Released
2011-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-23 Well Began Production
2012-02-23 Well Fluid changed to Crude Oil
2012-02-23 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-08 1296.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-19 Open Hole/Barefoot Completion 3069.00 3095.00 0
2011-11-15 Multi-Stage Fracture 2470.40 2470.90 0
2011-11-15 Multi-Stage Fracture 2397.00 2397.80 0
2011-11-15 Multi-Stage Fracture 2309.50 2310.00 0
2011-11-15 Multi-Stage Fracture 2236.20 2236.70 0
2011-11-15 Multi-Stage Fracture 2148.60 2149.10 0
2011-11-15 Multi-Stage Fracture 2061.30 2061.80 0
2011-11-15 Multi-Stage Fracture 2002.50 2003.00 0
2011-11-15 Multi-Stage Fracture 1915.40 1915.90 0
2011-11-15 Multi-Stage Fracture 3068.30 3068.80 0
2011-11-15 Multi-Stage Fracture 3008.80 3009.30 0
2011-11-15 Multi-Stage Fracture 2937.20 2937.70 0
2011-11-15 Multi-Stage Fracture 2864.10 2864.60 0
2011-11-15 Multi-Stage Fracture 2762.30 2762.80 0
2011-11-15 Multi-Stage Fracture 2704.00 2704.50 0
2011-11-15 Multi-Stage Fracture 2630.90 2631.10 0
2011-11-15 Multi-Stage Fracture 2543.20 2543.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6458 0.0 0.0 0.0
2013 8485 0.0 0.0 0.0
2014 8136 0.0 0.0 0.0
2015 8101 0.0 0.0 0.0
2016 7515 0.0 0.0 0.0
2017 7599 0.0 0.0 0.0
2018 6811 0.0 0.0 0.0
2019 7206 0.0 0.0 0.0
2020 1782 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-09-30 Lost Circulation 28.00 83.00
2011-10-03 Lost Circulation 83.00 129.00

For data sources see[7]

References