X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595203104002

Well Details

Well ID: 0595203104002
Loading map...
Location: 00/04-31-059-20W5/2
Location Alias: 00/04-31-59-20 W5M
Location Alias 2: 00/04-31-059-20 W5/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 31
County/Municipality: Municipal District of Greenview No. 16
Well Name: 2214896AB KAYBOBS 4-31-59-20
Operator Name: 2214896 Alberta Ltd.
License Number: 0173096
License Date: 1994-11-28
License Status: Issued
Spud Date: 1994-11-30
Final Drill Date: 1994-12-18
Well Total Depth: 2583.00 m
Surface Hole Latitude: 54.140956
Surface Hole Longitude: -116.995662

For data sources see[1][2]

Well History

Date Event
1994-11-28 Obtained License
1994-12-01 Lost Circulation Occurred
1994-12-03 Surface Casing Operation Performed
1994-12-10 Lost Circulation Occurred
1994-12-18 Finished Drilling
1994-12-18 Well Mode changed to Drilled and Cased
1994-12-19 Well Log Performed
1994-12-22 Production Casing Operation Performed
1994-12-22 Rig Released
1995-01-28 Perforation Treatment Performed - Jet Perforation
1995-01-28 Well Log Performed
1995-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-31 Perforation Treatment Performed - Jet Perforation
1995-01-31 Plug Back Performed
1995-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-14 Perforation Treatment Performed - Fractured
1995-02-20 Perforation Treatment Performed - Jet Perforation
1995-02-21 Perforation Treatment Performed - Fractured
1995-05-26 Well Began Production
1995-05-26 Well Fluid changed to Gas
1995-05-26 Well Mode changed to Flowing
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-28 Perforation 2559.00 2560.00 13
1995-01-31 Packing Device Capped w/Cement 2547.00 2555.00 0
1995-01-31 Perforation 2491.00 2496.00 13
1995-02-03 Acid Treatment 2491.00 2496.00 0
1995-02-14 Fracture 2491.00 2496.00 0
1995-02-20 Perforation 2431.00 2438.00 13
1995-02-21 Fracture 2431.00 2438.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4465 0.0 0.0 0.0
1996 8165 0.0 0.0 0.0
1997 8182 0.0 0.0 0.0
1998 7783 0.0 0.0 0.0
1999 8056 0.0 0.0 0.0
2000 7604 0.0 0.0 0.0
2001 8490 0.0 0.0 0.0
2002 7483 0.0 0.0 0.0
2003 8470 0.0 0.0 0.0
2004 8543 0.0 0.0 0.0
2005 8565 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 5735 0.0 0.0 0.0
2008 8687 0.0 0.0 0.0
2009 8592 0.0 0.0 0.0
2010 8470 0.0 0.0 0.0
2011 7026 0.0 0.0 0.0
2012 7971 0.0 0.0 0.0
2013 6663 0.0 0.0 0.0
2014 6308 0.0 0.0 0.0
2015 6331 0.0 0.0 0.0
2016 7527 0.0 0.0 0.0
2017 5170 0.0 0.0 0.0
2018 6985 0.0 0.0 0.0
2019 8435 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-12-01 Lost Circulation 154.00 193.00
1994-12-10 Lost Circulation 1923.00 1934.00

For data sources see[6]

References