X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595202514020

Well Details

Well ID: 0595202514020
Loading map...
Location: 02/14-25-059-20W5/0
Location Alias: 02/14-25-59-20 W5M
Location Alias 2: 02/14-25-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ 102 KAYBOBS 14-25-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0413984
License Date: 2009-11-16
License Status: Amended
Spud Date: 2009-11-17
Final Drill Date: 2009-12-11
Well Total Depth: 4462.00 m
Surface Hole Latitude: 54.121306
Surface Hole Longitude: -116.877433

For data sources see[1][2]

Well History

Date Event
2009-11-16 Obtained License
2009-11-19 Surface Casing Operation Performed
2009-11-23 Direction Drilling Operation Performed - Horizontal
2009-12-02 Well Log Performed
2009-12-03 Intermediate Casing Operation Performed
2009-12-11 Finished Drilling
2009-12-11 Well Log Performed
2009-12-11 Well Mode changed to Drilled and Cased
2009-12-15 Liner Casing Operation Performed
2009-12-16 Rig Released
2009-12-21 Perforation Treatment Performed - Multi-Stage Fracture
2009-12-21 Perforation Treatment Performed - Open-Hole Completion
2010-01-05 Well Log Performed
2010-01-13 Well Began Production
2010-01-13 Well Fluid changed to Gas
2010-01-13 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-11-23 1987.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-12-21 Open Hole/Barefoot Completion 4460.30 4462.00 0
2009-12-21 Multi-Stage Fracture 3631.50 3631.60 0
2009-12-21 Multi-Stage Fracture 3527.70 3527.80 0
2009-12-21 Multi-Stage Fracture 3422.50 3422.60 0
2009-12-21 Multi-Stage Fracture 3330.30 3330.40 0
2009-12-21 Multi-Stage Fracture 3222.90 3223.00 0
2009-12-21 Multi-Stage Fracture 3128.40 3128.50 0
2009-12-21 Multi-Stage Fracture 3022.00 3022.10 0
2009-12-21 Multi-Stage Fracture 2917.90 2918.00 0
2009-12-21 Multi-Stage Fracture 4438.50 4438.60 0
2009-12-21 Multi-Stage Fracture 4342.20 4342.30 0
2009-12-21 Multi-Stage Fracture 4237.00 4237.10 0
2009-12-21 Multi-Stage Fracture 4141.10 4141.20 0
2009-12-21 Multi-Stage Fracture 4034.30 4034.40 0
2009-12-21 Multi-Stage Fracture 3932.90 3933.00 0
2009-12-21 Multi-Stage Fracture 3828.50 3828.60 0
2009-12-21 Multi-Stage Fracture 3737.90 3738.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 8399 0.0 0.0 0.0
2011 8639 0.0 0.0 0.0
2012 8544 0.0 0.0 0.0
2013 5663 0.0 0.0 0.0
2014 4703 0.0 0.0 0.0
2015 4103 0.0 0.0 0.0
2016 2520 0.0 0.0 0.0
2017 72 0.0 0.0 0.0
2018 5519 0.0 0.0 0.0
2019 5640 0.0 0.0 0.0
2020 960 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-01-08 No Incident Encountered 0.00 0.00

For data sources see[7]

References