X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595201601000

Well Details

Well ID: 0595201601000
Loading map...
Location: 00/01-16-059-20W5/0
Location Alias: 00/01-16-59-20 W5M
Location Alias 2: 00/01-16-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY FIR 1-16-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0420673
License Date: 2010-05-26
License Status: Issued
Spud Date: 2010-07-03
Final Drill Date: 2010-07-24
Well Total Depth: 4021.00 m
Surface Hole Latitude: 54.110196
Surface Hole Longitude: -116.927337

For data sources see[1][2]

Well History

Date Event
2010-05-26 Obtained License
2010-07-05 Surface Casing Operation Performed
2010-07-10 Direction Drilling Operation Performed - Horizontal
2010-07-17 Intermediate Casing Operation Performed
2010-07-24 Finished Drilling
2010-07-24 Well Mode changed to Drilled and Cased
2010-07-28 Perforation Treatment Performed - Open-Hole Completion
2010-07-28 Rig Released
2010-08-18 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-08 Well Began Production
2010-10-08 Well Fluid changed to Gas
2010-10-08 Well Mode changed to Flowing
2013-12-07 Well Fluid changed to Gas
2013-12-07 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-10 2229.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-07-28 Open Hole/Barefoot Completion 2847.00 4021.00 0
2010-08-18 Multi-Stage Fracture 3668.80 3668.90 0
2010-08-18 Multi-Stage Fracture 3777.70 3777.80 0
2010-08-18 Multi-Stage Fracture 3874.50 3874.60 0
2010-08-18 Multi-Stage Fracture 3960.00 3960.10 0
2010-08-18 Multi-Stage Fracture 2938.20 2938.30 0
2010-08-18 Multi-Stage Fracture 3023.90 3024.00 0
2010-08-18 Multi-Stage Fracture 3097.60 3097.70 0
2010-08-18 Multi-Stage Fracture 3183.40 3183.50 0
2010-08-18 Multi-Stage Fracture 3280.60 3280.70 0
2010-08-18 Multi-Stage Fracture 3400.40 3400.50 0
2010-08-18 Multi-Stage Fracture 3509.00 3509.10 0
2010-08-18 Multi-Stage Fracture 3594.70 3594.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1939 0.0 0.0 0.0
2011 8003 0.0 0.0 0.0
2012 7629 0.0 0.0 0.0
2013 8375 0.0 0.0 0.0
2014 6672 0.0 0.0 0.0
2015 6552 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 7535 0.0 0.0 0.0
2018 8615 0.0 0.0 0.0
2019 6837 0.0 0.0 0.0
2020 1752 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-08-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References