X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595200501000

Well Details

Well ID: 0595200501000
Loading map...
Location: 00/01-05-059-20W5/0
Location Alias: 00/01-05-59-20 W5M
Location Alias 2: 00/01-05-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ FIR 1-5-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0420239
License Date: 2010-05-04
License Status: Issued
Spud Date: 2010-07-24
Final Drill Date: 2010-08-25
Well Total Depth: 4337.00 m
Surface Hole Latitude: 54.066912
Surface Hole Longitude: -116.980019

For data sources see[1][2]

Well History

Date Event
2010-05-04 Obtained License
2010-07-27 Surface Casing Operation Performed
2010-07-30 Well Log Performed
2010-08-01 Direction Drilling Operation Performed - Horizontal
2010-08-10 Production Casing Operation Performed
2010-08-25 Finished Drilling
2010-08-25 Well Mode changed to Drilled and Cased
2010-08-28 Liner Casing Operation Performed
2010-08-30 Rig Released
2010-10-12 Well Log Performed
2010-10-22 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-22 Perforation Treatment Performed - Open-Hole Completion
2010-10-30 Well Log Performed
2010-11-06 Well Began Production
2010-11-06 Well Fluid changed to Gas
2010-11-06 Well Mode changed to Flowing
2014-01-20 Well Fluid changed to Gas
2014-01-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-01 2353.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-22 Open Hole/Barefoot Completion 4333.00 4337.00 0
2010-10-22 Multi-Stage Fracture 3611.80 3611.90 0
2010-10-22 Multi-Stage Fracture 3522.60 3522.70 0
2010-10-22 Multi-Stage Fracture 3432.90 3433.00 0
2010-10-22 Multi-Stage Fracture 3342.80 3342.90 0
2010-10-22 Multi-Stage Fracture 3252.80 3252.90 0
2010-10-22 Multi-Stage Fracture 3162.90 3163.00 0
2010-10-22 Multi-Stage Fracture 3094.50 3094.60 0
2010-10-22 Multi-Stage Fracture 4311.40 4311.50 0
2010-10-22 Multi-Stage Fracture 4255.90 4256.00 0
2010-10-22 Multi-Stage Fracture 4165.60 4165.70 0
2010-10-22 Multi-Stage Fracture 4075.10 4075.20 0
2010-10-22 Multi-Stage Fracture 3974.70 3974.80 0
2010-10-22 Multi-Stage Fracture 3887.10 3887.20 0
2010-10-22 Multi-Stage Fracture 3800.00 3800.10 0
2010-10-22 Multi-Stage Fracture 3700.50 3700.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1223 0.0 0.0 0.0
2011 6887 0.0 0.0 0.0
2012 7944 0.0 0.0 0.0
2013 6192 0.0 0.0 0.0
2014 7104 0.0 0.0 0.0
2015 8135 0.0 0.0 0.0
2016 7440 0.0 0.0 0.0
2017 4776 0.0 0.0 0.0
2018 7991 0.0 0.0 0.0
2019 8100 0.0 0.0 0.0
2020 888 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-11-04 No Incident Encountered 0.00 0.00

For data sources see[7]

References