If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0595193506002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/06-35-059-19W5/2 | |
| Location Alias: 00/06-35-59-19 W5M | |
| Location Alias 2: 00/06-35-059-19 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 059 | |
| Meridian: 5 | |
| Range: 19 | |
| Section: 35 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ACL KAYBOBS 6-35-59-19 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0093998 | |
| License Date: 1981-12-17 | |
| License Status: Issued | |
| Spud Date: 1981-12-22 | |
| Final Drill Date: 1982-01-14 | |
| Well Total Depth: 2220.00 m | |
| Surface Hole Latitude: 54.144308 | |
| Surface Hole Longitude: -116.744099 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1981-12-17 | Obtained License |
| 1981-12-22 | Lost Circulation Occurred |
| 1982-01-14 | Finished Drilling |
| 1982-01-15 | Drill Stem Test Performed |
| 1982-01-19 | Production Casing Operation Performed |
| 1982-02-10 | Perforation Treatment Performed - Jet Perforation |
| 1982-02-12 | Perforation Treatment Performed - Fractured |
| 1982-02-16 | Perforation Treatment Performed - Jet Perforation |
| 1982-03-26 | Perforation Treatment Performed - Fractured |
| 1982-05-20 | Well Mode changed to Drilled and Cased |
| 1990-03-01 | Well Began Production |
| 1990-03-01 | Well Fluid changed to Gas |
| 1990-03-01 | Well Mode changed to Flowing |
| 1997-01-01 | Well Fluid changed to Gas |
| 1997-01-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1982-02-10 | Perforation | 2161.50 | 2163.00 | 7 |
| 1982-02-10 | Perforation | 2164.00 | 2165.50 | 7 |
| 1982-02-10 | Perforation | 2167.00 | 2168.00 | 7 |
| 1982-02-12 | Fracture | 2161.50 | 2168.00 | 0 |
| 1982-02-16 | Perforation | 2137.00 | 2138.50 | 7 |
| 1982-02-16 | Perforation | 2141.50 | 2144.50 | 7 |
| 1982-03-26 | Fracture | 2137.00 | 2144.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1990 | 2044 | 0.0 | 0.0 | 0.0 |
| 1991 | 34 | 0.0 | 0.0 | 0.0 |
| 1995 | 24 | 0.0 | 0.0 | 0.0 |
| 1996 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1981-12-22 | Lost Circulation | 32.00 | 65.00 |
For data sources see[6]