If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595192501002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.134853,"lon":-116.723817,"icon":""}]} |
Location: 00/01-25-059-19W5/2 | |
Location Alias: 00/01-25-59-19 W5M | |
Location Alias 2: 00/01-25-059-19 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 19 | |
Section: 25 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CELTIC RE-EN HZ KAYBOBS 1-25-59-19 | |
Operator Name: XTO Energy Canada ULC | |
License Number: 0422605 | |
License Date: 2010-08-12 | |
License Status: Amended | |
Spud Date: 2012-06-07 | |
Final Drill Date: 2012-06-17 | |
Well Total Depth: 4921.00 m | |
Surface Hole Latitude: 54.134853 | |
Surface Hole Longitude: -116.723817 |
Date | Event |
---|---|
2010-08-12 | Obtained License |
2012-06-07 | Direction Drilling Operation Performed - Deviate |
2012-06-07 | Well Log Performed |
2012-06-09 | Direction Drilling Operation Performed - Horizontal |
2012-06-12 | Well Log Performed |
2012-06-17 | Finished Drilling |
2012-06-17 | Well Mode changed to Drilled and Cased |
2012-06-18 | Well Log Performed |
2012-06-22 | Liner Casing Operation Performed |
2012-06-22 | Perforation Treatment Performed - Open-Hole Completion |
2012-06-24 | Rig Released |
2012-09-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-01 | Well Began Production |
2012-09-01 | Well Fluid changed to Shale Gas Only |
2012-09-01 | Well Mode changed to Flowing |
2012-09-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-08-23 | Well Fluid changed to Shale Gas Only |
2015-08-23 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-06-07 | Chinook Drilling Inc. | 5 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-06-07 | 3068.50 | Deviate (5 - 79 degrees) |
2012-06-09 | 3291.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-06-22 | Open Hole/Barefoot Completion | 4917.80 | 4921.00 | 0 |
2012-09-03 | Multi-Stage Fracture | 4594.90 | 4595.20 | 0 |
2012-09-03 | Multi-Stage Fracture | 4526.80 | 4527.10 | 0 |
2012-09-03 | Multi-Stage Fracture | 4513.80 | 4514.10 | 0 |
2012-09-04 | Multi-Stage Fracture | 4464.60 | 4464.90 | 0 |
2012-09-04 | Multi-Stage Fracture | 4451.60 | 4452.00 | 0 |
2012-09-04 | Multi-Stage Fracture | 4396.20 | 4396.50 | 0 |
2012-09-04 | Multi-Stage Fracture | 4383.20 | 4383.50 | 0 |
2012-09-04 | Multi-Stage Fracture | 4321.30 | 4321.70 | 0 |
2012-09-04 | Multi-Stage Fracture | 4308.40 | 4308.70 | 0 |
2012-09-04 | Multi-Stage Fracture | 4265.60 | 4265.90 | 0 |
2012-09-01 | Multi-Stage Fracture | 4908.10 | 4909.40 | 0 |
2012-09-04 | Multi-Stage Fracture | 4252.60 | 4252.90 | 0 |
2012-09-05 | Multi-Stage Fracture | 4178.00 | 4178.30 | 0 |
2012-09-05 | Multi-Stage Fracture | 4190.60 | 4190.90 | 0 |
2012-09-05 | Multi-Stage Fracture | 4122.20 | 4122.50 | 0 |
2012-09-05 | Multi-Stage Fracture | 4109.20 | 4109.50 | 0 |
2012-09-05 | Multi-Stage Fracture | 4053.70 | 4054.00 | 0 |
2012-09-05 | Multi-Stage Fracture | 4040.70 | 4041.10 | 0 |
2012-09-05 | Multi-Stage Fracture | 3991.50 | 3991.80 | 0 |
2012-09-05 | Multi-Stage Fracture | 3978.50 | 3978.90 | 0 |
2012-09-05 | Multi-Stage Fracture | 3923.10 | 3923.40 | 0 |
2012-09-02 | Multi-Stage Fracture | 4856.40 | 4858.10 | 0 |
2012-09-05 | Multi-Stage Fracture | 3910.10 | 3910.40 | 0 |
2012-09-05 | Multi-Stage Fracture | 3842.00 | 3842.30 | 0 |
2012-09-05 | Multi-Stage Fracture | 3829.30 | 3829.60 | 0 |
2012-09-06 | Multi-Stage Fracture | 3780.10 | 3780.40 | 0 |
2012-09-06 | Multi-Stage Fracture | 3767.10 | 3767.50 | 0 |
2012-09-06 | Multi-Stage Fracture | 3711.70 | 3712.00 | 0 |
2012-09-06 | Multi-Stage Fracture | 3698.70 | 3699.00 | 0 |
2012-09-06 | Multi-Stage Fracture | 3643.30 | 3643.60 | 0 |
2012-09-06 | Multi-Stage Fracture | 3630.30 | 3630.60 | 0 |
2012-09-07 | Multi-Stage Fracture | 3568.80 | 3570.50 | 0 |
2012-09-02 | Multi-Stage Fracture | 4785.10 | 4786.60 | 0 |
2012-09-07 | Multi-Stage Fracture | 3496.60 | 3498.30 | 0 |
2012-09-07 | Multi-Stage Fracture | 3437.10 | 3438.80 | 0 |
2012-09-07 | Multi-Stage Fracture | 3365.10 | 3366.80 | 0 |
2012-09-08 | Multi-Stage Fracture | 3305.60 | 3307.20 | 0 |
2012-09-08 | Multi-Stage Fracture | 3233.40 | 3235.10 | 0 |
2012-09-03 | Multi-Stage Fracture | 4738.40 | 4738.70 | 0 |
2012-09-03 | Multi-Stage Fracture | 4725.50 | 4725.80 | 0 |
2012-09-03 | Multi-Stage Fracture | 4670.00 | 4670.30 | 0 |
2012-09-03 | Multi-Stage Fracture | 4657.10 | 4657.40 | 0 |
2012-09-03 | Multi-Stage Fracture | 4607.90 | 4608.20 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 949 | 0.0 | 0.0 | 0.0 |
2013 | 7353 | 0.0 | 0.0 | 0.0 |
2014 | 8351 | 0.0 | 0.0 | 0.0 |
2015 | 7542 | 0.0 | 0.0 | 0.0 |
2016 | 6882 | 0.0 | 0.0 | 0.0 |
2017 | 7602 | 0.0 | 0.0 | 0.0 |
2018 | 7173 | 0.0 | 0.0 | 0.0 |
2019 | 6771 | 0.0 | 0.0 | 0.0 |
2020 | 1814 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-06-22 | No Incident Encountered | 0.00 | 0.00 |
2012-09-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]