X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595191816000

Well Details

Well ID: 0595191816000
Loading map...
Location: 00/16-18-059-19W5/0
Location Alias: 00/16-18-59-19 W5M
Location Alias 2: 00/16-18-059-19 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 19
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 16-18-59-19
Operator Name: Paramount Resources Ltd.
License Number: 0413051
License Date: 2009-10-13
License Status: Issued
Spud Date: 2009-10-14
Final Drill Date: 2009-11-08
Well Total Depth: 4329.00 m
Surface Hole Latitude: 54.110844
Surface Hole Longitude: -116.854557

For data sources see[1][2]

Well History

Date Event
2009-10-13 Obtained License
2009-10-15 Lost Circulation Occurred
2009-10-16 Lost Circulation Occurred
2009-10-17 Surface Casing Operation Performed
2009-10-22 Direction Drilling Operation Performed - Horizontal
2009-10-29 Well Log Performed
2009-10-30 Intermediate Casing Operation Performed
2009-11-08 Finished Drilling
2009-11-08 Well Mode changed to Drilled and Cased
2009-11-09 Well Log Performed
2009-11-12 Liner Casing Operation Performed
2009-11-13 Rig Released
2009-11-21 Perforation Treatment Performed - Multi-Stage Fracture
2009-11-21 Perforation Treatment Performed - Open-Hole Completion
2009-11-22 Well Began Production
2009-11-22 Well Fluid changed to Gas
2009-11-22 Well Mode changed to Flowing
2009-11-26 Well Log Performed
2014-03-12 Well Fluid changed to Gas
2014-03-12 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-10-22 2300.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-11-21 Open Hole/Barefoot Completion 4265.00 4329.00 0
2009-11-21 Multi-Stage Fracture 3483.70 3483.80 0
2009-11-21 Multi-Stage Fracture 3391.40 3391.50 0
2009-11-21 Multi-Stage Fracture 3286.60 3286.70 0
2009-11-21 Multi-Stage Fracture 3194.70 3194.80 0
2009-11-21 Multi-Stage Fracture 3093.80 3093.90 0
2009-11-21 Multi-Stage Fracture 4243.00 4243.10 0
2009-11-21 Multi-Stage Fracture 4173.60 4173.70 0
2009-11-21 Multi-Stage Fracture 4068.60 4068.70 0
2009-11-21 Multi-Stage Fracture 3963.70 3963.80 0
2009-11-21 Multi-Stage Fracture 3885.60 3885.70 0
2009-11-21 Multi-Stage Fracture 3781.80 3781.90 0
2009-11-21 Multi-Stage Fracture 3690.10 3690.20 0
2009-11-21 Multi-Stage Fracture 3587.30 3587.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 671 0.0 0.0 0.0
2010 8529 0.0 0.0 0.0
2011 8135 0.0 0.0 0.0
2012 8664 0.0 0.0 0.0
2013 4247 0.0 0.0 0.0
2014 7919 0.0 0.0 0.0
2015 7535 0.0 0.0 0.0
2016 2976 0.0 0.0 0.0
2017 5831 0.0 0.0 0.0
2018 7343 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 1944 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-10-15 Lost Circulation 48.00 48.00
2009-10-15 Lost Circulation 152.00 152.00
2009-10-16 Lost Circulation 603.00 603.00
2009-11-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References