X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595191404000

Well Details

Well ID: 0595191404000
Loading map...
Location: 00/04-14-059-19W5/0
Location Alias: 00/04-14-59-19 W5M
Location Alias 2: 00/04-14-059-19 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 19
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 4-14-59-19
Operator Name: Paramount Resources Ltd.
License Number: 0420602
License Date: 2010-05-21
License Status: Suspension
Spud Date: 2010-06-15
Final Drill Date: 2010-07-07
Well Total Depth: 3571.00 m
Surface Hole Latitude: 54.107691
Surface Hole Longitude: -116.753986

For data sources see[1][2]

Well History

Date Event
2010-05-21 Obtained License
2010-06-15 Lost Circulation Occurred
2010-06-17 Surface Casing Operation Performed
2010-06-20 Well Log Performed
2010-06-21 Direction Drilling Operation Performed - Horizontal
2010-06-30 Production Casing Operation Performed
2010-07-07 Finished Drilling
2010-07-07 Well Mode changed to Drilled and Cased
2010-07-10 Liner Casing Operation Performed
2010-07-11 Rig Released
2010-07-26 Well Log Performed
2010-07-28 Well Began Production
2010-07-28 Well Fluid changed to Gas
2010-07-28 Well Mode changed to Flowing
2010-07-30 Perforation Treatment Performed - Multi-Stage Fracture
2010-07-30 Perforation Treatment Performed - Open-Hole Completion
2010-08-04 Well Log Performed
2013-04-29 Well Fluid changed to Gas
2013-04-29 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-06-21 1993.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-07-30 Open Hole/Barefoot Completion 3567.00 3571.00 0
2010-07-30 Multi-Stage Fracture 2944.40 2944.50 0
2010-07-30 Multi-Stage Fracture 2865.10 2865.20 0
2010-07-30 Multi-Stage Fracture 2786.60 2786.70 0
2010-07-30 Multi-Stage Fracture 2708.00 2708.10 0
2010-07-30 Multi-Stage Fracture 2631.20 2631.30 0
2010-07-30 Multi-Stage Fracture 2553.50 2553.60 0
2010-07-30 Multi-Stage Fracture 2474.90 2475.00 0
2010-07-30 Multi-Stage Fracture 2408.90 2409.00 0
2010-07-30 Multi-Stage Fracture 3546.10 3546.20 0
2010-07-30 Multi-Stage Fracture 3490.20 3490.30 0
2010-07-30 Multi-Stage Fracture 3411.70 3411.80 0
2010-07-30 Multi-Stage Fracture 3334.30 3334.40 0
2010-07-30 Multi-Stage Fracture 3256.30 3256.40 0
2010-07-30 Multi-Stage Fracture 3177.40 3177.50 0
2010-07-30 Multi-Stage Fracture 3099.30 3099.40 0
2010-07-30 Multi-Stage Fracture 3021.60 3021.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2405 0.0 0.0 0.0
2011 2016 0.0 0.0 0.0
2012 720 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-06-15 Lost Circulation 94.00 130.00
2010-08-22 No Incident Encountered 0.00 0.00

For data sources see[7]

References