X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595183101000

Well Details

Well ID: 0595183101000
Loading map...
Location: 00/01-31-059-18W5/0
Location Alias: 00/01-31-59-18 W5M
Location Alias 2: 00/01-31-059-18 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 18
Section: 31
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 1-31-59-18
Operator Name: XTO Energy Canada ULC
License Number: 0451207
License Date: 2012-11-30
License Status: Issued
Spud Date: 2012-12-13
Final Drill Date: 2013-01-15
Well Total Depth: 4987.40 m
Surface Hole Latitude: 54.150657
Surface Hole Longitude: -116.700965

For data sources see[1][2]

Well History

Date Event
2012-11-30 Obtained License
2012-12-15 Surface Casing Operation Performed
2012-12-31 Direction Drilling Operation Performed - Deviate
2013-01-02 Well Log Performed
2013-01-03 Production Casing Operation Performed
2013-01-06 Direction Drilling Operation Performed - Horizontal
2013-01-15 Finished Drilling
2013-01-15 Perforation Treatment Performed - Open-Hole Completion
2013-01-15 Well Log Performed
2013-01-15 Well Mode changed to Drilled and Cased
2013-01-18 Liner Casing Operation Performed
2013-01-20 Rig Released
2013-02-16 Well Log Performed
2013-02-17 Well Log Performed
2013-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-01 Well Began Production
2013-03-01 Well Fluid changed to Shale Gas Only
2013-03-01 Well Mode changed to Flowing
2014-04-01 Well Fluid changed to Shale Gas Only
2014-04-01 Well Mode changed to Suspended
2014-06-01 Well Fluid changed to Shale Gas Only
2014-06-01 Well Mode changed to Flowing
2018-07-30 Well Fluid changed to Shale Gas Only
2018-07-30 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-12-13 Precision Drilling Corporation 234 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-12-31 2987.50 Deviate (5 - 79 degrees)
2013-01-06 3268.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-01-15 Open Hole/Barefoot Completion 4982.40 4987.40 0
2013-02-23 Multi-Stage Fracture 4579.70 4580.00 0
2013-02-23 Multi-Stage Fracture 4566.70 4567.00 0
2013-02-24 Multi-Stage Fracture 4505.40 4505.70 0
2013-02-24 Multi-Stage Fracture 4492.40 4492.70 0
2013-02-24 Multi-Stage Fracture 4437.10 4437.50 0
2013-02-24 Multi-Stage Fracture 4424.20 4424.50 0
2013-02-25 Multi-Stage Fracture 4362.80 4363.20 0
2013-02-25 Multi-Stage Fracture 4350.10 4350.40 0
2013-02-25 Multi-Stage Fracture 4294.80 4295.10 0
2013-02-25 Multi-Stage Fracture 4281.80 4282.10 0
2013-02-22 Multi-Stage Fracture 4972.80 4974.20 0
2013-02-25 Multi-Stage Fracture 4233.20 4233.50 0
2013-02-25 Multi-Stage Fracture 4220.20 4220.50 0
2013-02-25 Multi-Stage Fracture 4152.30 4152.60 0
2013-02-25 Multi-Stage Fracture 4139.30 4139.60 0
2013-02-25 Multi-Stage Fracture 4084.60 4085.00 0
2013-02-25 Multi-Stage Fracture 4071.70 4072.00 0
2013-02-26 Multi-Stage Fracture 4023.00 4023.30 0
2013-02-26 Multi-Stage Fracture 4010.00 4010.30 0
2013-02-26 Multi-Stage Fracture 3942.40 3942.70 0
2013-02-26 Multi-Stage Fracture 3929.50 3929.80 0
2013-02-22 Multi-Stage Fracture 4908.70 4910.60 0
2013-02-26 Multi-Stage Fracture 3874.30 3874.60 0
2013-02-26 Multi-Stage Fracture 3861.30 3861.60 0
2013-02-26 Multi-Stage Fracture 3812.70 3813.00 0
2013-02-26 Multi-Stage Fracture 3799.70 3800.00 0
2013-02-26 Multi-Stage Fracture 3731.70 3732.10 0
2013-02-26 Multi-Stage Fracture 3718.80 3719.10 0
2013-02-26 Multi-Stage Fracture 3663.50 3663.80 0
2013-02-26 Multi-Stage Fracture 3650.50 3650.90 0
2013-02-27 Multi-Stage Fracture 3589.70 3591.30 0
2013-02-27 Multi-Stage Fracture 3517.90 3519.70 0
2013-02-23 Multi-Stage Fracture 4849.80 4851.40 0
2013-02-27 Multi-Stage Fracture 3446.40 3448.10 0
2013-02-27 Multi-Stage Fracture 3374.70 3376.40 0
2013-02-27 Multi-Stage Fracture 3303.20 3304.80 0
2013-02-27 Multi-Stage Fracture 3231.50 3233.10 0
2013-02-23 Multi-Stage Fracture 4790.40 4790.80 0
2013-02-23 Multi-Stage Fracture 4709.50 4709.80 0
2013-02-23 Multi-Stage Fracture 4696.60 4696.90 0
2013-02-23 Multi-Stage Fracture 4635.30 4635.60 0
2013-02-23 Multi-Stage Fracture 4622.30 4622.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-22 2013-02-27 3,190 0 N/A
2 2013-02-23 2013-02-27 3,190 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 No specific ingredients Not Available 100 92.1892 N/A
Sand (40/70) Ottawa Canyon Aluminum Oxide 1344-28-1 100 5.23 N/A
Crystalline silica. quartz 14808-60-7 100 5.23 N/A
Iron Oxide 1309-37-1 100 5.23 N/A
Titanium Oxide 13463-67-7 100 5.2298 N/A
Sand (50/140) Canyon Aluminum Oxide 1344-28-1 100 0.4745 N/A
Crystalline silica. quartz 14808-60-7 100 0.4745 N/A
Iron Oxide 1309-37-1 100 0.4745 N/A
Titanium Oxide 13463-67-7 100 0.4747 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Non-hazardous base ingredient(s) Not Available 100 0.0137 N/A
Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0137 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Clay Control No hazardous ingredients Not Available 100 0.1763 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.095 N/A
Hydrotreated Kerosene 64742-47-8 100 0.095 N/A
Non-hazardous base ingredient(s) Not Available 100 0.095 N/A
CAN-2410 Demulsifier Canyon Surfactant Methyl Alcohol 67-56-1 100 0.0866 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0866 N/A
2 Prime Plus (30/50) Canyon No specific ingredients Not Available 100 1.7254 N/A
HCL 15% Canyon Acid Hydrogen Chloride 7647-01-0 100 0.2052 N/A
Non-hazardous base ingredient(s) Not Available 100 0.2052 N/A
CAN-2321 Breaker (Oxidizer Delayed HT) Canyon Breaker Ammonium Persulfate 7727-54-0 100 0.0136 N/A
Crystalline silica. quartz 14808-60-7 100 0.0136 N/A
CAN-2102 pH Buffer (HpH) Canyon Buffer Methyl Alcohol 67-56-1 100 0.043 N/A
Non-hazardous base ingredient(s) Not Available 100 0.043 N/A
Sodium Hydroxide 1310-73-2 100 0.043 N/A
CAN-1000 Corrosion Inhibitor Canyon Corrosion Inhibitor Refer to MSDS 8141 100 0.0018 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Crosslinker Boric Acid 10043-35-3 100 0.0621 N/A
Monoethanolamine 141-43-5 100 0.0621 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0621 N/A
CAN-1201 Non-Emulsifier Canyon Demulsifier Refer to MSDS 8252 100 0.0011 N/A
CAN-1203 Anti-Sludge Agent / Non-Emulsifier Canyon Demulsifier Refer to MSDS 8253 100 0.0006 N/A
CAN-2000 Gellant (Guar) Canyon Gelling Agent Polysacharide Suspension Not Available 100 0.0982 N/A
CAN-1101 Iron Control Reduction Canyon Iron Control 2-Mercaptoethanol 60-24-2 100 0.0006 N/A
Cupric Chloride 7447-39-4 100 0.0006 N/A
Monoethanolamine 141-43-5 100 0.0006 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-02-16 2013-03-08 Municipal Water 338
2013-02-19 2013-02-27 Surface Water - River 25622
2013-02-20 2013-03-07 Municipal Water 266
2013-02-23 2013-02-26 Recycled Fracturing Water (treated at well site) 33

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 124 0.0 0.0 0.0
2014 4503 0.0 0.0 0.0
2015 8121 0.0 0.0 0.0
2016 8161 0.0 0.0 0.0
2017 7851 0.0 0.0 0.0
2018 7760 0.0 0.0 0.0
2019 7666 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-20 No Incident Encountered 0.00 0.00
2013-03-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References