X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595182910000

Well Details

Well ID: 0595182910000
Loading map...
Location: 00/10-29-059-18W5/0
Location Alias: 00/10-29-59-18 W5M
Location Alias 2: 00/10-29-059-18 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 18
Section: 29
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOBS 10-29-59-18
Operator Name: Paramount Resources Ltd.
License Number: 0034880
License Date: 1968-09-27
License Status: Abandoned
Spud Date: 1968-10-05
Final Drill Date: 1968-11-20
Well Total Depth: 3235.50 m
Surface Hole Latitude: 54.132323
Surface Hole Longitude: -116.660813

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-09-27 Obtained License
1968-11-20 Finished Drilling
1968-11-23 Drill Stem Test Performed
1968-11-26 Production Casing Operation Performed
1968-11-26 Well Mode changed to Drilled and Cased
1970-08-20 Perforation Treatment Performed - Selective Jet Perforations
1970-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-02-06 Well Began Injection
1972-02-06 Well Fluid changed to Gas
1972-02-06 Well Type changed to Injection
1990-11-07 Well Began Production
1990-11-07 Well Fluid changed to Gas
1990-11-07 Well Mode changed to Flowing
2006-04-14 Well Log Performed
2006-04-19 Well Log Performed
2009-01-10 Well Log Performed
2009-01-12 Well Log Performed
2013-11-29 Well Log Performed
2013-12-01 Perforation Treatment Performed - Cement Squeeze
2013-12-01 Plug Back Performed
2013-12-01 Well Fluid changed to Gas
2013-12-01 Well Mode changed to Abandoned Zone
2013-12-02 Well Log Performed
2013-12-03 Well Log Performed
2013-12-05 Perforation Treatment Performed - Cement Plug
2013-12-05 Plug Back Performed
2013-12-07 Perforation Treatment Performed - Jet Perforation
2013-12-07 Well Log Performed
2013-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-12-09 Perforation Treatment Performed - Cement Squeeze
2013-12-09 Plug Back Performed
2013-12-10 Perforation Treatment Performed - Jet Perforation
2013-12-11 Perforation Treatment Performed - Jet Perforation
2013-12-11 Well Log Performed
2013-12-12 Perforation Treatment Performed - Jet Perforation
2013-12-12 Well Log Performed
2013-12-13 Perforation Treatment Performed - Cement Squeeze
2013-12-13 Plug Back Performed
2013-12-15 Perforation Treatment Performed - Jet Perforation
2013-12-15 Well Log Performed
2013-12-16 Perforation Treatment Performed - Cement Squeeze
2013-12-16 Plug Back Performed
2013-12-17 Perforation Treatment Performed - Jet Perforation
2013-12-17 Well Log Performed
2013-12-18 Perforation Treatment Performed - Cement Squeeze
2013-12-18 Plug Back Performed
2014-01-13 Well Abandoned
2014-01-13 Well Fluid changed to Gas
2014-01-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-08-20 Selective Jet Perforations 3167.50 3181.20 0
2013-12-08 Acid Treatment 1835.00 1836.00 0
2013-12-08 Acid Treatment 1825.00 1826.00 0
2013-12-09 Cement Squeeze 1835.00 1836.00 0
2013-12-09 Cement Squeeze 1825.00 1826.00 0
2013-12-10 Perforation 1415.00 1415.50 9
2013-12-11 Perforation 1415.50 1416.50 17
2013-12-11 Perforation 1405.00 1406.00 17
2013-12-12 Perforation 1310.00 1311.00 17
2013-12-12 Perforation 1125.00 1126.00 17
2013-12-13 Cement Squeeze 1415.00 1415.50 0
1970-08-20 Selective Jet Perforations 3185.20 3189.40 0
2013-12-13 Cement Squeeze 1415.50 1416.50 0
2013-12-13 Cement Squeeze 1405.00 1406.00 0
2013-12-13 Cement Squeeze 1310.00 1311.00 0
2013-12-13 Cement Squeeze 1125.00 1126.00 0
2013-12-15 Perforation 725.00 726.00 17
2013-12-16 Cement Squeeze 725.00 726.00 0
2013-12-17 Perforation 355.00 356.00 17
2013-12-18 Cement Squeeze 355.00 356.00 0
1970-08-31 Acid Treatment 3167.50 3189.40 0
1970-09-01 Acid Treatment 3167.50 3189.40 0
2013-12-01 Cement Squeeze 3185.20 3189.40 0
2013-12-01 Cement Squeeze 3167.50 3181.20 0
2013-12-05 Cement Plug 2626.10 2705.00 0
2013-12-07 Perforation 1835.00 1836.00 17
2013-12-07 Perforation 1825.00 1826.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 86 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 1300 0.0 0.0 0.0
1991 7879 0.0 0.0 0.0
1992 8359 0.0 0.0 0.0
1993 8569 0.0 0.0 0.0
1994 8402 0.0 0.0 0.0
1995 8399 0.0 0.0 0.0
1996 8706 0.0 0.0 0.0
1997 8359 0.0 0.0 0.0
1998 8727 0.0 0.0 0.0
1999 8313 0.0 0.0 0.0
2000 8009 0.0 0.0 0.0
2001 7992 0.0 0.0 0.0
2002 8379 0.0 0.0 0.0
2003 7193 0.0 0.0 0.0
2004 8581 0.0 0.0 0.0
2005 7927 0.0 0.0 0.0
2006 6209 0.0 0.0 0.0
2007 1522 0.0 0.0 0.0
2008 8149 0.0 0.0 0.0
2009 8297 0.0 0.0 0.0
2010 8732 0.0 0.0 0.0
2011 5426 0.0 0.0 0.0
2012 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-12-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References