X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595173515000

Well Details

Well ID: 0595173515000
Loading map...
Location: 00/15-35-059-17W5/0
Location Alias: 00/15-35-59-17 W5M
Location Alias 2: 00/15-35-059-17 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 17
Section: 35
County/Municipality: Woodlands County
Well Name: TANGLE CREEK HZ KAYBOBS 15-35-59-17
Operator Name: Tangle Creek Energy Ltd.
License Number: 0438069
License Date: 2011-10-27
License Status: Amended
Spud Date: 2011-12-18
Final Drill Date: 2012-01-12
Well Total Depth: 2900.00 m
Surface Hole Latitude: 54.149303
Surface Hole Longitude: -116.455653

For data sources see[1][2]

Well History

Date Event
2011-10-27 Obtained License
2011-12-21 Surface Casing Operation Performed
2012-01-05 Direction Drilling Operation Performed - Horizontal
2012-01-08 Intermediate Casing Operation Performed
2012-01-12 Finished Drilling
2012-01-12 Well Mode changed to Drilled and Cased
2012-01-14 Liner Casing Operation Performed
2012-01-15 Well Began Production
2012-01-15 Well Fluid changed to Crude Oil
2012-01-15 Well Mode changed to Flowing
2012-01-16 Rig Released
2012-01-17 Perforation Treatment Performed - Open-Hole Completion
2012-01-17 Well Log Performed
2012-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-15 Well Fluid changed to Crude Oil
2012-02-15 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-05 1322.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-17 Open Hole/Barefoot Completion 2813.00 2900.00 0
2012-01-24 Multi-Stage Fracture 2241.90 2242.00 0
2012-01-24 Multi-Stage Fracture 2169.30 2169.40 0
2012-01-24 Multi-Stage Fracture 2107.70 2107.80 0
2012-01-24 Multi-Stage Fracture 2035.50 2035.60 0
2012-01-24 Multi-Stage Fracture 1960.80 1960.90 0
2012-01-24 Multi-Stage Fracture 1900.00 1900.10 0
2012-01-23 Multi-Stage Fracture 2803.70 2803.80 0
2012-01-23 Multi-Stage Fracture 2734.80 2734.90 0
2012-01-24 Multi-Stage Fracture 2660.20 2660.30 0
2012-01-24 Multi-Stage Fracture 2598.60 2598.70 0
2012-01-24 Multi-Stage Fracture 2524.90 2525.00 0
2012-01-24 Multi-Stage Fracture 2451.70 2451.80 0
2012-01-24 Multi-Stage Fracture 2389.70 2389.80 0
2012-01-24 Multi-Stage Fracture 2317.00 2317.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7320 0.0 0.0 0.0
2013 7972 0.0 0.0 0.0
2014 8079 0.0 0.0 0.0
2015 5688 0.0 0.0 0.0
2016 7439 0.0 0.0 0.0
2017 8064 0.0 0.0 0.0
2018 2640 0.0 0.0 0.0

For data sources see[6]

References