If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595150303002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.077455,"lon":-116.166683,"icon":""}]} |
Location: 00/03-03-059-15W5/2 | |
Location Alias: 00/03-03-59-15 W5M | |
Location Alias 2: 00/03-03-059-15 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 15 | |
Section: 03 | |
County/Municipality: Woodlands County | |
Well Name: SURGE ENERGY HZ WIND 3-3-59-15 | |
Operator Name: Clearview Resources Ltd. | |
License Number: 0434390 | |
License Date: 2011-06-16 | |
License Status: Suspension | |
Spud Date: 2011-08-14 | |
Final Drill Date: 2011-09-17 | |
Well Total Depth: 3119.00 m | |
Surface Hole Latitude: 54.077455 | |
Surface Hole Longitude: -116.166683 |
Date | Event |
---|---|
2011-06-16 | Obtained License |
2011-08-17 | Surface Casing Operation Performed |
2011-08-20 | Direction Drilling Operation Performed - Horizontal |
2011-08-29 | Intermediate Casing Operation Performed |
2011-09-09 | Direction Drilling Operation Performed - Sidetrack Fish |
2011-09-17 | Finished Drilling |
2011-09-17 | Well Mode changed to Drilled and Cased |
2011-09-22 | Liner Casing Operation Performed |
2011-09-22 | Perforation Treatment Performed - Open-Hole Completion |
2011-09-22 | Rig Released |
2011-10-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-03 | Well Began Production |
2011-10-03 | Well Fluid changed to Crude Oil |
2011-10-03 | Well Mode changed to Pumping |
2011-10-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-12-01 | Well Fluid changed to Crude Oil |
2016-12-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-20 | 1755.00 | Horizontal |
2011-09-09 | 2188.00 | Sidetrack fish |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-22 | Open Hole/Barefoot Completion | 3115.00 | 3119.00 | 0 |
2011-10-04 | Multi-Stage Fracture | 2263.30 | 2263.40 | 0 |
2011-10-03 | Multi-Stage Fracture | 3071.00 | 3071.10 | 0 |
2011-10-03 | Multi-Stage Fracture | 3002.10 | 3002.20 | 0 |
2011-10-03 | Multi-Stage Fracture | 2916.30 | 2916.40 | 0 |
2011-10-03 | Multi-Stage Fracture | 2843.40 | 2843.50 | 0 |
2011-10-03 | Multi-Stage Fracture | 2747.20 | 2747.30 | 0 |
2011-10-03 | Multi-Stage Fracture | 2553.30 | 2553.40 | 0 |
2011-10-03 | Multi-Stage Fracture | 2444.80 | 2444.90 | 0 |
2011-10-04 | Multi-Stage Fracture | 2347.70 | 2347.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 850 | 0.0 | 0.0 | 0.0 |
2012 | 3137 | 0.0 | 0.0 | 0.0 |
2013 | 7685 | 0.0 | 0.0 | 0.0 |
2014 | 4990 | 0.0 | 0.0 | 0.0 |
2015 | 120 | 0.0 | 0.0 | 0.0 |
For data sources see[6]