X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595113410000

Well Details

Well ID: 0595113410000
Loading map...
Location: 00/10-34-059-11W5/0
Location Alias: 00/10-34-59-11 W5M
Location Alias 2: 00/10-34-059-11 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 11
Section: 34
County/Municipality: Woodlands County
Well Name: PACIFIC AMOCO WHITECOURT 10-34-59-11
Operator Name: Suncor Energy Inc.
License Number: 0050721
License Date: 1974-08-02
License Status: Re-Entered
Spud Date: 1974-08-08
Final Drill Date: 1974-08-19
Well Total Depth: 1545.30 m
Surface Hole Latitude: 54.148372
Surface Hole Longitude: -115.563122

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-08-02 Obtained License
1974-08-19 Finished Drilling
1974-08-21 Drill Stem Test Performed
1974-08-22 Production Casing Operation Performed
1974-09-01 Well Mode changed to Drilled and Cased
1974-10-01 Well Fluid changed to Crude Oil
1974-10-01 Well Mode changed to Potential
1974-10-08 Perforation Treatment Performed - Jet Perforation
1974-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-09 Perforation Treatment Performed - Acid Wash - No Pressure
1976-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-10-16 Perforation Treatment Performed - Cement Squeeze
1976-10-16 Perforation Treatment Performed - Jet Perforation
1976-10-16 Well Fluid changed to Crude Oil
1976-10-16 Well Mode changed to Abandoned
1976-10-17 Well Abandoned
1976-10-17 Well Fluid changed to Crude Oil
1976-10-17 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-10-08 Perforation 1522.20 1525.20 7
1974-10-09 Acid Wash 1522.20 1525.20 0
1974-10-09 Acid Treatment 1522.20 1525.20 0
1976-10-16 Packing Device Capped w/Cement 1512.40 1512.40 0
1976-10-16 Perforation 156.10 156.40 7
1976-10-16 Cement Squeeze 156.10 156.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 24 0.0 0.0 0.0

For data sources see[5]

References