X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595021906002

Well Details

Well ID: 0595021906002
Loading map...
Location: 00/06-19-059-02W5/2
Location Alias: 00/06-19-59-02 W5M
Location Alias 2: 00/06-19-059-02 W5/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 02
Section: 19
County/Municipality: County of Barrhead No. 11
Well Name: AXIOM MANOLA 6-19-59-2
Operator Name: Axiom Oil and Gas Inc.
License Number: 0109317
License Date: 1984-09-17
License Status: Suspension
Spud Date: 1984-09-20
Final Drill Date: 1984-09-23
Well Total Depth: 1173.50 m
Surface Hole Latitude: 54.112672
Surface Hole Longitude: -114.295171

For data sources see[1][2]

Well History

Date Event
1984-09-17 Obtained License
1984-09-23 Finished Drilling
1984-09-23 Perforation Treatment Performed - Bridge Plug No Cement Required
1984-09-23 Perforation Treatment Performed - Jet Perforation
1984-09-23 Well Mode changed to Drilled and Cased
1984-09-24 Well Log Performed
1984-09-25 Rig Released
1984-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-21 Well Began Production
1984-11-21 Well Fluid changed to Crude Oil
1984-11-21 Well Mode changed to Flowing
1988-09-07 Well Fluid changed to Crude Oil
1988-09-07 Well Mode changed to Pumping
2002-02-01 Well Fluid changed to Crude Oil
2002-02-01 Well Mode changed to Suspended
2012-10-22 Perforation Treatment Performed - Cement Squeeze
2012-10-22 Plug Back Performed
2012-10-22 Well Fluid changed to Crude Oil
2012-10-22 Well Mode changed to Abandoned Zone
2012-10-28 Perforation Treatment Performed - Cement Squeeze
2012-10-28 Perforation Treatment Performed - Jet Perforation
2012-10-28 Plug Back Performed
2012-10-31 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-09-23 Perforation 1092.40 1094.50 7
1984-09-23 Bridge Plug, No Cement 1087.50 1087.50 0
1984-09-23 Perforation 1079.00 1083.60 7
1984-10-03 Acid Treatment 1079.00 1083.60 0
2012-10-22 Cement Squeeze 1079.00 1083.60 0
2012-10-28 Perforation 1092.40 1094.50 20
2012-10-28 Cement Squeeze 1092.40 1094.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1038 0.0 0.0 0.0
1985 4410 0.0 0.0 0.0
1986 5610 0.0 0.0 0.0
1987 7308 0.0 0.0 0.0
1988 8478 0.0 0.0 0.0
1989 8502 0.0 0.0 0.0
1990 8487 0.0 0.0 0.0
1991 8628 0.0 0.0 0.0
1992 8698 0.0 0.0 0.0
1993 8723 0.0 0.0 0.0
1994 8437 0.0 0.0 0.0
1995 8722 0.0 0.0 0.0
1996 8687 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8703 0.0 0.0 0.0
1999 8630 0.0 0.0 0.0
2000 8708 0.0 0.0 0.0
2001 4751 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-01 No Incident Encountered 0.00 0.00

For data sources see[6]

References