X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0594202606002

Well Details

Well ID: 0594202606002
Loading map...
Location: 00/06-26-059-20W4/2
Location Alias: 00/06-26-59-20 W4M
Location Alias 2: 00/06-26-059-20 W4/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 4
Range: 20
Section: 26
County/Municipality: Thorhild County
Well Name: PEOC RADWAY 6-26-59-20
Operator Name: Sequoia Resources Corp.
License Number: 0062780
License Date: 1977-02-15
License Status: Suspension
Spud Date: 1977-02-15
Final Drill Date: 1977-02-18
Well Total Depth: 788.20 m
Surface Hole Latitude: 54.126601
Surface Hole Longitude: -112.891609

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-02-15 Obtained License
1977-02-17 Drill Stem Test Performed
1977-02-18 Finished Drilling
1977-02-19 Drill Stem Test Performed
1977-02-19 Well Log Performed
1977-02-20 Drill Stem Test Performed
1977-02-21 Production Casing Operation Performed
1977-02-21 Well Mode changed to Drilled and Cased
1977-02-26 Perforation Treatment Performed - Jet Perforation
1977-02-27 Perforation Treatment Performed - Jet Perforation
1994-02-17 Perforation Treatment Performed - Cement Squeeze
1994-02-17 Plug Back Performed
2000-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-20 Plug Back Performed
2000-11-20 Well Log Performed
2000-11-21 Perforation Treatment Performed - Jet Perforation
2000-11-21 Well Log Performed
2004-03-12 Well Log Performed
2004-03-13 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-02-26 Perforation 728.50 729.70 7
1977-02-26 Perforation 732.40 733.30 7
1977-02-27 Perforation 660.50 661.40 7
1994-02-17 Cement Squeeze 660.50 661.40 0
2000-11-20 Packing Device Capped w/Cement 648.00 656.00 0
2000-11-21 Perforation 560.20 560.80 13
2004-03-13 Perforation 597.40 600.50 13

For data sources see[4]



References