X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0586060507000

Well Details

Well ID: 0586060507000
Loading map...
Location: 00/07-05-058-06W6/0
Location Alias: 00/07-05-58-06 W6M
Location Alias 2: 00/07-05-058-06 W6/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 6
Range: 06
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: CNRL 0-0-0-0
Operator Name: Canadian Natural Resources Limited
License Number: 0091994
License Date: 1981-08-31
License Status: Suspension
Spud Date: 1981-09-28
Final Drill Date: 1982-04-07
Well Total Depth: 3380.00 m
Surface Hole Latitude: 53.979478
Surface Hole Longitude: -118.854787

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-08-31 Obtained License
1981-09-28 Direction Drilling Operation Performed - 98
1981-10-09 Lost Circulation Occurred
1981-10-16 Lost Circulation Occurred
1981-12-09 Lost Circulation Occurred
1981-12-31 Lost Circulation Occurred
1982-02-21 Well Log Performed
1982-03-24 Lost Circulation Occurred
1982-04-03 Lost Circulation Occurred
1982-04-07 Finished Drilling
1982-04-07 Lost Circulation Occurred
1982-04-11 Liner Casing Operation Performed
1982-04-13 Well Mode changed to Drilled and Cased
1982-06-13 Perforation Treatment Performed - Jet Perforation
1982-06-14 Drill Stem Test Performed
1982-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-15 Perforation Treatment Performed - Jet Perforation
1982-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-07 Perforation Treatment Performed - Jet Perforation
1982-07-07 Well Mode changed to Drilled and Cased
1982-07-10 Perforation Treatment Performed - Fractured
2002-07-24 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1981-09-28 1625.60 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-06-13 Perforation 3341.00 3343.00 13
1982-06-13 Perforation 3352.00 3356.00 13
1982-06-15 Packing Device Capped w/Cement 3324.00 3332.00 0
1982-06-15 Perforation 3122.00 3131.00 13
1982-06-22 Acid Treatment 3122.00 3131.00 0
1982-07-07 Perforation 2990.00 2998.00 13
1982-07-07 Perforation 3006.50 3012.50 13
1982-07-10 Fracture 2990.00 3012.50 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-10-09 Lost Circulation 422.00 422.00
1981-10-16 Lost Circulation 429.00 436.00
1981-12-09 Lost Circulation 1956.00 2011.00
1981-12-31 Lost Circulation 1957.00 2887.00
1982-03-24 Lost Circulation 3126.00 3205.00
1982-04-03 Lost Circulation 3289.00 3308.00
1982-04-07 Lost Circulation 3375.00 3380.00

For data sources see[6]

References