If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0586040106000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.982414,"lon":-118.45851,"icon":""}]} |
Location: 00/06-01-058-04W6/0 | |
Location Alias: 00/06-01-58-04 W6M | |
Location Alias 2: 00/06-01-058-04 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 6 | |
Range: 04 | |
Section: 01 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: AMOCO CANOXY BOLTON 6-1-58-4 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0073574 | |
License Date: 1978-12-19 | |
License Status: RecCertified | |
Spud Date: 1979-01-12 | |
Final Drill Date: 1979-09-30 | |
Well Total Depth: 5650.00 m | |
Surface Hole Latitude: 53.982414 | |
Surface Hole Longitude: -118.458510 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-12-19 | Obtained License |
1979-02-18 | Lost Circulation Occurred |
1979-03-03 | Lost Circulation Occurred |
1979-03-08 | Lost Circulation Occurred |
1979-05-15 | Lost Circulation Occurred |
1979-05-21 | Lost Circulation Occurred |
1979-06-05 | Kick Occurred |
1979-07-02 | Lost Circulation Occurred |
1979-07-03 | Production Casing Operation Performed |
1979-07-08 | Drill Stem Test Performed |
1979-07-10 | Drill Stem Test Performed |
1979-07-17 | Drill Stem Test Performed |
1979-08-27 | Lost Circulation Occurred |
1979-09-30 | Finished Drilling |
1979-12-05 | Well Mode changed to Drilled and Cased |
1979-12-22 | Perforation Treatment Performed - Jet Perforation |
1980-01-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-01-05 | Perforation Treatment Performed - Fractured |
1980-02-07 | Perforation Treatment Performed - Selective Jet Perforations |
1980-02-15 | Perforation Treatment Performed - Jet Perforation |
1980-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-02-20 | Perforation Treatment Performed - Cement Squeeze |
1980-03-07 | Perforation Treatment Performed - Jet Perforation |
1980-03-11 | Perforation Treatment Performed - Jet Perforation |
1980-03-12 | Perforation Treatment Performed - Jet Perforation |
1980-03-21 | Perforation Treatment Performed - Fractured |
1980-05-26 | Perforation Treatment Performed - Jet Perforation |
1980-06-10 | Perforation Treatment Performed - Cement Squeeze |
1980-06-25 | Perforation Treatment Performed - Jet Perforation |
1980-06-28 | Perforation Treatment Performed - Cement Squeeze |
1980-07-01 | Perforation Treatment Performed - Jet Perforation |
1980-07-05 | Perforation Treatment Performed - Fractured |
1980-07-16 | Perforation Treatment Performed - Cement Squeeze |
1982-02-24 | Well Abandoned |
1982-02-24 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-12-22 | Perforation | 4035.00 | 4038.00 | 13 |
1980-03-07 | Perforation | 3964.00 | 3968.00 | 13 |
1980-03-11 | Perforation | 2661.00 | 2665.00 | 13 |
1980-03-12 | Perforation | 2686.00 | 2689.00 | 13 |
1980-03-21 | Fracture | 2661.00 | 2689.00 | 13 |
1980-05-26 | Perforation | 2737.00 | 2743.00 | 13 |
1980-06-10 | Cement Squeeze | 2661.00 | 2743.00 | 13 |
1980-06-25 | Perforation | 3708.00 | 3717.00 | 13 |
1980-06-28 | Cement Squeeze | 3708.00 | 3717.00 | 13 |
1980-07-01 | Perforation | 3292.00 | 3317.00 | 13 |
1980-07-05 | Fracture | 3292.00 | 3317.00 | 0 |
1980-01-03 | Acid Treatment | 4035.00 | 4038.00 | 0 |
1980-07-16 | Cement Squeeze | 3292.00 | 3317.00 | 0 |
1980-01-05 | Fracture | 4035.00 | 4038.00 | 0 |
1980-02-07 | Selective Jet Perforations | 3993.50 | 3993.50 | 0 |
1980-02-15 | Perforation | 3950.00 | 3955.00 | 13 |
1980-02-15 | Perforation | 3964.00 | 3968.00 | 13 |
1980-02-20 | Cement Squeeze | 3950.00 | 3993.50 | 0 |
1980-02-20 | Packing Device Capped w/Cement | 3986.00 | 4008.00 | 13 |
1980-03-07 | Perforation | 3950.00 | 3955.00 | 13 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1979-02-18 | Lost Circulation | 1157.00 | 1280.00 |
1979-03-03 | Lost Circulation | 1573.00 | 1573.00 |
1979-03-08 | Lost Circulation | 1750.00 | 1750.00 |
1979-05-15 | Lost Circulation | 3286.00 | 3286.00 |
1979-05-21 | Lost Circulation | 3510.00 | 3510.00 |
1979-06-05 | Kick | 3876.00 | 3876.00 |
1979-07-02 | Lost Circulation | 4185.00 | 4185.00 |
1979-08-27 | Lost Circulation | 4874.00 | 4874.00 |
For data sources see[5]