X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0586031001007

Well Details

Well ID: 0586031001007
Loading map...
Location: 00/01-10-058-03W6/7
Location Alias: 00/01-10-58-03 W6M
Location Alias 2: 00/01-10-058-03 W6/07
Country: Canada
Province: Alberta
Township: 058
Meridian: 6
Range: 03
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA PCR SMOKY 1-10-58-3
Operator Name: Jupiter Resources Inc.
License Number: 0263929
License Date: 2001-12-13
License Status: Abandoned
Spud Date: 2002-01-02
Final Drill Date: 2002-06-30
Well Total Depth: 5292.00 m
Surface Hole Latitude: 53.991686
Surface Hole Longitude: -118.349086

For data sources see[1][2]

Well History

Date Event
2001-12-13 Obtained License
2002-01-10 Surface Casing Operation Performed
2002-02-12 Intermediate Casing Operation Performed
2002-03-12 Direction Drilling Operation Performed - Sidetrack Fish
2002-05-30 Well Log Performed
2002-06-04 Production Casing Operation Performed
2002-06-05 Well Log Performed
2002-06-20 Lost Circulation Occurred
2002-06-30 Finished Drilling
2002-06-30 Well Mode changed to Drilled and Cased
2002-07-02 Well Log Performed
2002-07-03 Well Log Performed
2002-07-08 Well Log Performed
2002-07-09 Liner Casing Operation Performed
2002-07-14 Rig Released
2002-09-22 Well Log Performed
2002-09-25 Perforation Treatment Performed - Jet Perforation
2002-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-02 Plug Back Performed
2002-10-04 Well Log Performed
2002-10-05 Perforation Treatment Performed - Jet Perforation
2002-10-06 Well Log Performed
2002-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-13 Perforation Treatment Performed - Jet Perforation
2002-10-13 Plug Back Performed
2002-10-14 Perforation Treatment Performed - Jet Perforation
2002-10-14 Well Log Performed
2002-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-04 Well Log Performed
2002-11-05 Well Log Performed
2002-11-07 Well Log Performed
2002-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-04 Plug Back Performed
2002-12-07 Perforation Treatment Performed - Jet Perforation
2002-12-10 Perforation Treatment Performed - Fractured
2002-12-16 Well Log Performed
2002-12-17 Perforation Treatment Performed - Cement Plug
2002-12-17 Plug Back Performed
2002-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-18 Plug Back Performed
2002-12-18 Well Log Performed
2002-12-20 Perforation Treatment Performed - Jet Perforation
2002-12-21 Perforation Treatment Performed - Fractured
2003-01-09 Perforation Treatment Performed - Jet Perforation
2003-01-09 Well Log Performed
2003-01-18 Perforation Treatment Performed - Fractured
2009-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-13 Plug Back Performed
2009-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-14 Plug Back Performed
2009-03-14 Well Mode changed to Abandoned Zone
2009-03-18 Well Abandoned
2009-03-18 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-03-12 1325.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-09-25 Perforation 5157.00 5185.00 13
2002-12-04 Packing Device Capped w/Cement 4877.00 4885.00 0
2002-12-07 Perforation 3660.00 3666.00 17
2002-12-10 Fracture 3660.00 3666.00 0
2002-12-17 Cement Plug 3636.00 3640.00 0
2002-12-18 Packing Device Capped w/Cement 3629.00 3637.00 0
2002-12-20 Perforation 3080.50 3081.50 17
2002-12-21 Fracture 3080.50 3081.50 0
2003-01-09 Perforation 3017.50 3020.50 17
2003-01-18 Fracture 3017.50 3020.50 0
2009-03-13 Packing Device Capped w/Cement 3036.00 3044.00 0
2002-09-28 Acid Treatment 5157.00 5185.00 0
2009-03-14 Packing Device Capped w/Cement 3002.00 3010.00 0
2002-10-02 Packing Device Capped w/Cement 5134.50 5142.50 0
2002-10-05 Perforation 5003.00 5015.00 13
2002-10-09 Acid Treatment 5003.00 5015.00 0
2002-10-13 Packing Device Capped w/Cement 4986.00 4994.00 0
2002-10-13 Perforation 4912.00 4918.00 13
2002-10-14 Perforation 4906.00 4912.00 14
2002-10-16 Acid Treatment 4906.00 4918.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2002-06-20 Lost Circulation 4867.00 4867.00

For data sources see[6]

References