X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0586023514000

Well Details

Well ID: 0586023514000
Loading map...
Location: 00/14-35-058-02W6/0
Location Alias: 00/14-35-58-02 W6M
Location Alias 2: 00/14-35-058-02 W6/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 6
Range: 02
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: XTO HZ SMOKY 14-35-58-2
Operator Name: XTO Energy Canada ULC
License Number: 0466077
License Date: 2014-04-04
License Status: Issued
Spud Date: 2014-12-24
Final Drill Date: 2015-02-16
Well Total Depth: 6087.00 m
Surface Hole Latitude: 54.040155
Surface Hole Longitude: -118.186847

For data sources see[1][2]

Well History

Date Event
2014-04-04 Obtained License
2014-12-27 Surface Casing Operation Performed
2015-01-13 Direction Drilling Operation Performed - Deviate
2015-01-22 Direction Drilling Operation Performed - Horizontal
2015-01-24 Well Log Performed
2015-01-25 Intermediate Casing Operation Performed
2015-01-26 Well Log Performed
2015-02-16 Finished Drilling
2015-02-16 Well Log Performed
2015-02-16 Well Mode changed to Drilled and Cased
2015-02-17 Production Casing Operation Performed
2015-02-21 Rig Released
2015-02-27 Perforation Treatment Performed - Jet Perforation
2015-03-01 Well Fluid changed to Gas
2015-03-01 Well Mode changed to Testing
2015-03-03 Perforation Treatment Performed - Fractured
2015-03-03 Perforation Treatment Performed - Jet Perforation
2015-03-04 Perforation Treatment Performed - Fractured
2015-03-04 Perforation Treatment Performed - Jet Perforation
2015-03-05 Perforation Treatment Performed - Fractured
2015-03-05 Perforation Treatment Performed - Jet Perforation
2015-03-06 Perforation Treatment Performed - Fractured
2015-03-06 Perforation Treatment Performed - Jet Perforation
2015-03-07 Perforation Treatment Performed - Fractured
2015-03-07 Perforation Treatment Performed - Jet Perforation
2015-03-08 Perforation Treatment Performed - Fractured
2015-03-08 Perforation Treatment Performed - Jet Perforation
2015-05-31 Well Fluid changed to Gas
2015-05-31 Well Mode changed to Test Completed
2016-02-01 Well Began Production
2016-02-01 Well Fluid changed to Gas
2016-02-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-12-24 Jomax Drilling (1988) Limited 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-01-13 3417.40 Deviate (5 - 79 degrees)
2015-01-22 3795.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-02-27 Perforation 6059.00 6059.50 20
2015-03-03 Perforation 5895.00 5895.50 20
2015-03-07 Perforation 4352.00 4352.50 20
2015-03-07 Fracture 4352.00 4437.50 0
2015-03-07 Perforation 4330.50 4331.00 20
2015-03-07 Perforation 4309.50 4310.00 20
2015-03-07 Perforation 4287.50 4288.00 20
2015-03-07 Perforation 4267.50 4268.00 20
2015-03-07 Perforation 4246.50 4247.00 20
2015-03-07 Fracture 4246.50 4331.00 0
2015-03-08 Perforation 4225.00 4225.50 20
2015-03-08 Perforation 4204.00 4204.50 20
2015-03-03 Perforation 5874.50 5875.00 20
2015-03-08 Perforation 4182.00 4182.50 20
2015-03-08 Perforation 4162.00 4162.50 20
2015-03-08 Perforation 4141.00 4141.50 20
2015-03-08 Fracture 4141.00 4225.50 0
2015-03-08 Perforation 4119.50 4120.00 20
2015-03-08 Perforation 4098.50 4099.00 20
2015-03-08 Perforation 4077.50 4078.00 20
2015-03-08 Perforation 4056.50 4057.00 20
2015-03-08 Perforation 4035.50 4036.00 20
2015-03-08 Fracture 4035.50 4120.00 0
2015-03-03 Fracture 5874.50 5957.00 0
2015-03-08 Perforation 4014.50 4015.00 20
2015-03-08 Perforation 3993.00 3993.50 20
2015-03-08 Perforation 3972.00 3972.50 20
2015-03-08 Perforation 3951.00 3951.50 20
2015-03-08 Perforation 3930.50 3931.00 20
2015-03-08 Fracture 3930.50 4015.00 0
2015-03-08 Perforation 3908.50 3909.00 20
2015-03-08 Perforation 3887.50 3888.00 20
2015-03-08 Perforation 3866.50 3867.00 20
2015-03-08 Perforation 3845.50 3846.00 20
2015-03-04 Perforation 5854.00 5854.50 20
2015-03-08 Perforation 3824.50 3825.00 20
2015-03-08 Fracture 3824.50 3909.00 0
2015-03-04 Perforation 5833.50 5834.00 20
2015-03-04 Perforation 5813.00 5813.50 20
2015-03-04 Perforation 5792.50 5793.00 20
2015-03-04 Perforation 5772.00 5772.50 20
2015-03-04 Fracture 5772.00 5854.50 0
2015-03-04 Perforation 5751.50 5752.00 20
2015-02-27 Perforation 6057.70 6058.20 20
2015-03-04 Perforation 5731.00 5731.50 20
2015-03-04 Perforation 5710.50 5711.00 20
2015-03-04 Perforation 5690.00 5690.50 20
2015-03-04 Perforation 5669.50 5670.00 20
2015-03-04 Fracture 5669.50 5752.00 0
2015-03-04 Perforation 5649.00 5649.50 20
2015-03-04 Perforation 5628.50 5629.00 20
2015-03-04 Perforation 5608.00 5608.50 20
2015-03-04 Perforation 5587.50 5588.00 20
2015-03-04 Perforation 5567.00 5567.50 20
2015-02-27 Perforation 6037.20 6037.70 20
2015-03-04 Fracture 5567.00 5649.50 0
2015-03-05 Perforation 5546.50 5547.00 20
2015-03-05 Perforation 5526.00 5526.50 20
2015-03-05 Perforation 5505.50 5506.00 20
2015-03-05 Perforation 5485.00 5485.50 20
2015-03-05 Perforation 5484.50 5485.00 20
2015-03-05 Fracture 5484.50 5547.00 0
2015-03-05 Perforation 5444.00 5444.50 20
2015-03-05 Perforation 5423.50 5424.00 20
2015-03-05 Perforation 5403.00 5403.50 20
2015-02-27 Perforation 6016.70 6017.20 20
2015-03-05 Perforation 5382.50 5383.00 20
2015-03-05 Perforation 5362.00 5362.50 20
2015-03-05 Fracture 5362.00 5444.50 0
2015-03-05 Perforation 5341.50 5342.00 20
2015-03-05 Perforation 5321.00 5321.50 20
2015-03-05 Perforation 5300.50 5301.00 20
2015-03-05 Perforation 5280.00 5280.50 20
2015-03-05 Perforation 5259.50 5260.00 20
2015-03-05 Fracture 5259.50 5342.00 0
2015-03-05 Perforation 5239.00 5239.50 20
2015-02-27 Perforation 5996.20 5996.70 20
2015-03-05 Perforation 5218.50 5219.00 20
2015-03-05 Perforation 5198.00 5198.50 20
2015-03-05 Perforation 5177.50 5178.00 20
2015-03-05 Perforation 5157.00 5157.50 20
2015-03-05 Fracture 5157.00 5239.50 0
2015-03-06 Perforation 5136.50 5137.00 20
2015-03-06 Perforation 5116.00 5116.50 20
2015-03-06 Perforation 5095.50 5096.00 20
2015-03-06 Perforation 5075.00 5075.50 20
2015-03-06 Perforation 5054.50 5055.00 20
2015-03-03 Fracture 5996.20 6059.50 0
2015-03-06 Fracture 5054.50 5137.00 0
2015-03-06 Perforation 5034.00 5034.50 20
2015-03-06 Perforation 5013.50 5014.00 20
2015-03-06 Perforation 4993.00 4993.50 20
2015-03-06 Perforation 4972.50 4973.00 20
2015-03-06 Perforation 4952.00 4952.50 20
2015-03-06 Fracture 4952.00 5034.50 0
2015-03-06 Perforation 4931.50 4932.00 20
2015-03-06 Perforation 4911.00 4911.50 20
2015-03-06 Perforation 4890.50 4891.00 20
2015-03-03 Perforation 5956.50 5957.00 20
2015-03-06 Perforation 4870.00 4870.50 20
2015-03-06 Perforation 4849.50 4850.00 20
2015-03-06 Fracture 4849.50 4932.00 0
2015-03-06 Perforation 4828.00 4828.50 20
2015-03-06 Perforation 4808.50 4809.00 20
2015-03-06 Perforation 4788.00 4788.50 20
2015-03-06 Perforation 4767.50 4768.00 20
2015-03-06 Perforation 4747.00 4747.50 20
2015-03-06 Fracture 4747.00 4828.50 0
2015-03-06 Perforation 4725.50 4726.00 20
2015-03-03 Perforation 5936.00 5936.50 20
2015-03-06 Perforation 4706.00 4706.50 20
2015-03-06 Perforation 4685.50 4686.00 20
2015-03-06 Perforation 4665.00 4665.50 20
2015-03-06 Perforation 4644.50 4645.00 20
2015-03-07 Fracture 4644.50 4726.00 0
2015-03-07 Perforation 4624.00 4624.50 20
2015-03-07 Perforation 4603.50 4604.00 20
2015-03-07 Perforation 4583.00 4583.50 20
2015-03-07 Perforation 4562.50 4563.00 20
2015-03-07 Fracture 4562.50 4624.50 0
2015-03-03 Perforation 5915.50 5916.00 20
2015-03-07 Perforation 4541.50 4542.00 20
2015-03-07 Perforation 4520.50 4521.00 20
2015-03-07 Perforation 4499.50 4500.00 20
2015-03-07 Perforation 4478.50 4479.00 20
2015-03-07 Perforation 4457.50 4458.00 20
2015-03-07 Fracture 4457.50 4542.00 0
2015-03-07 Perforation 4437.00 4437.50 20
2015-03-07 Perforation 4415.00 4415.50 20
2015-03-07 Perforation 4393.50 4394.00 20
2015-03-07 Perforation 4373.00 4373.50 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-03 2015-03-08 3,692 22,292 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.3363 N/A
Atlas CRC-C (30/50) Canyon Crystalline silica. quartz 14808-60-7 100 1.2951 N/A
Hexamethylenetetramine 100-97-0 100 1.2951 N/A
Phenol formaldehyde resin 9003-35-4 100 1.2951 N/A
Sand (40/70) Ottawa Canyon Aluminum Oxide 1344-28-1 100 11.2247 N/A
Crystalline silica. quartz 14808-60-7 100 11.2247 N/A
Iron Oxide 1309-37-1 100 11.2247 N/A
Titanium Oxide 13463-67-7 100 11.2248 N/A
Sand (50/140) Canyon Aluminum Oxide 1344-28-1 100 0.4317 N/A
Crystalline silica. quartz 14808-60-7 100 0.4317 N/A
Iron Oxide 1309-37-1 100 0.4317 N/A
Titanium Oxide 13463-67-7 100 0.4317 N/A
HCL 15% Canyon Acid Hydrogen Chloride 7647-01-0 100 0.4891 N/A
Water 7732-18-5 100 0.4891 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0254 N/A
Water 7732-18-5 100 0.0254 N/A
CAN-1000 Corrosion Inhibitor Canyon Corrosion Inhibitor Refer to MSDS 8141 100 0.0039 N/A
CAN-1203 Anti-Sludge Agent / Non-Emulsifier Canyon Demulsifier Refer to MSDS 8253 100 0.0021 N/A
CAN-2057 Friction Reducer Canyon Gelling Agent No hazardous ingredients Not Available 100 0.1004 N/A
CAN-1101 Iron Control Reduction Canyon Iron Control 2-Mercaptoethanol 60-24-2 100 0.0038 N/A
Cupric Chloride 7447-39-4 100 0.0038 N/A
Monoethanolamine 141-43-5 100 0.0038 N/A
CAN-1202 Acid Wetting Agent Canyon Surfactant 1-Methoxy-2-Propanol 107-98-2 100 0.002 N/A
Water 7732-18-5 100 0.002 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.0849 N/A
Methanol 67-56-1 100 0.0849 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0849 N/A
Water 7732-18-5 100 0.0849 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-02-28 2015-03-08 Surface Water - River 25947

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1046 0.0 0.0 0.0
2016 6304 0.0 0.0 0.0
2017 7242 0.0 0.0 0.0
2018 5208 0.0 0.0 0.0
2019 11 0.0 0.0 0.0
2020 1179 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-21 No Incident Encountered 0.00 0.00
2015-03-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References