X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0586023411002

Well Details

Well ID: 0586023411002
Loading map...
Location: 00/11-34-058-02W6/2
Location Alias: 00/11-34-58-02 W6M
Location Alias 2: 00/11-34-058-02 W6/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 6
Range: 02
Section: 34
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ SMOKY 11-34-58-2
Operator Name: Jupiter Resources Inc.
License Number: 0477624
License Date: 2015-11-10
License Status: Amended
Spud Date: 2016-12-20
Final Drill Date: 2019-01-18
Well Total Depth: 5827.00 m
Surface Hole Latitude: 54.081937
Surface Hole Longitude: -118.214063

For data sources see[1][2]

Well History

Date Event
2015-11-10 Obtained License
2016-12-22 Surface Casing Operation Performed
2017-01-08 Intermediate Casing Operation Performed
2019-01-06 Direction Drilling Operation Performed - Deviate
2019-01-08 Direction Drilling Operation Performed - Horizontal
2019-01-18 Finished Drilling
2019-01-18 Well Log Performed
2019-01-18 Well Mode changed to Drilled and Cased
2019-01-21 Liner Casing Operation Performed
2019-01-23 Rig Released
2019-03-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-04-30 Well Fluid changed to Gas
2019-04-30 Well Mode changed to Testing
2019-05-06 Well Began Production
2019-05-06 Well Fluid changed to Gas
2019-05-06 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-04 Horizon Drilling Inc. 38 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-06 3007.70 Deviate (5 - 79 degrees)
2019-01-08 3384.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-19 Multi-Stage Fracture 5784.40 5784.50 0
2019-03-20 Multi-Stage Fracture 5015.60 5015.70 0
2019-03-20 Multi-Stage Fracture 4928.60 4928.70 0
2019-03-20 Multi-Stage Fracture 4841.50 4841.60 0
2019-03-20 Multi-Stage Fracture 4754.30 4754.40 0
2019-03-20 Multi-Stage Fracture 4681.20 4681.30 0
2019-03-20 Multi-Stage Fracture 4580.60 4580.70 0
2019-03-20 Multi-Stage Fracture 4493.60 4493.70 0
2019-03-20 Multi-Stage Fracture 4406.80 4406.90 0
2019-03-21 Multi-Stage Fracture 4320.80 4320.90 0
2019-03-21 Multi-Stage Fracture 4249.70 4249.80 0
2019-03-19 Multi-Stage Fracture 5708.90 5709.00 0
2019-03-21 Multi-Stage Fracture 4177.90 4178.00 0
2019-03-21 Multi-Stage Fracture 4091.00 4091.10 0
2019-03-21 Multi-Stage Fracture 4005.20 4005.30 0
2019-03-21 Multi-Stage Fracture 3861.50 3861.60 0
2019-03-21 Multi-Stage Fracture 3760.70 3760.80 0
2019-03-21 Multi-Stage Fracture 3687.70 3687.80 0
2019-03-21 Multi-Stage Fracture 3615.40 3615.50 0
2019-03-21 Multi-Stage Fracture 3543.70 3543.80 0
2019-03-19 Multi-Stage Fracture 5624.10 5624.20 0
2019-03-20 Multi-Stage Fracture 5536.90 5537.00 0
2019-03-20 Multi-Stage Fracture 5449.50 5449.60 0
2019-03-20 Multi-Stage Fracture 5363.60 5363.70 0
2019-03-20 Multi-Stage Fracture 5276.70 5276.80 0
2019-03-20 Multi-Stage Fracture 5189.20 5189.30 0
2019-03-20 Multi-Stage Fracture 5102.00 5102.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-19 2019-03-21 3,308 13,362 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.8364 N/A
40/70 Prime Plus Calfrac Quartz 14808-60-7 100 2.8263 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 12.9831 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 1.1958 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0104 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0104 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0104 N/A
Polyethylene glycol 25322-68-3 100 0.0104 N/A
Sodium bromide 7647-15-6 100 0.0104 N/A
DWP-913. Clay Control Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0451 N/A
DynaRate 6000. Anionic Friction Reducer Calfrac Friction Reducer Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0877 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0877 N/A
Proprietary Trade Secret 100 0.0877 N/A
DAP-902. Scale Inhibitor Calfrac Scale Inhibitor Non-Hazardous Ingredients Trade Secret 100 0.0148 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-03-12 2019-03-12 Surface Water - Runoff 96
2019-03-19 2019-03-21 Central Water Distribution Facility 4035
2019-03-19 2019-03-21 Central Water Distribution Facility 10378

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5830 0.0 0.0 0.0
2020 2049 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-08 No Incident Encountered 0.00 0.00
2019-04-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References