X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0586023409002

Well Details

Well ID: 0586023409002
Loading map...
Location: 00/09-34-058-02W6/2
Location Alias: 00/09-34-58-02 W6M
Location Alias 2: 00/09-34-058-02 W6/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 6
Range: 02
Section: 34
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ SMOKY 9-34-58-2
Operator Name: Jupiter Resources Inc.
License Number: 0477758
License Date: 2015-11-19
License Status: Amended
Spud Date: 2016-12-01
Final Drill Date: 2018-03-04
Well Total Depth: 5956.00 m
Surface Hole Latitude: 54.083403
Surface Hole Longitude: -118.202696

For data sources see[1][2]

Well History

Date Event
2015-11-19 Obtained License
2016-12-03 Surface Casing Operation Performed
2016-12-09 Intermediate Casing Operation Performed
2018-02-12 Direction Drilling Operation Performed - Deviate
2018-02-16 Direction Drilling Operation Performed - Horizontal
2018-03-04 Finished Drilling
2018-03-04 Well Log Performed
2018-03-04 Well Mode changed to Drilled and Cased
2018-03-08 Liner Casing Operation Performed
2018-03-09 Rig Released
2018-10-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-05 Well Fluid changed to Gas
2018-12-05 Well Mode changed to Testing
2018-12-17 Well Began Production
2018-12-17 Well Fluid changed to Gas
2018-12-17 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-09 Horizon Drilling Inc. 40 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-12 2997.30 Deviate (5 - 79 degrees)
2018-02-16 3386.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-10-14 Multi-Stage Fracture 5920.00 5920.10 0
2018-10-15 Multi-Stage Fracture 5132.20 5132.30 0
2018-10-15 Multi-Stage Fracture 5044.30 5044.40 0
2018-10-15 Multi-Stage Fracture 4957.10 4957.20 0
2018-10-15 Multi-Stage Fracture 4869.50 4869.60 0
2018-10-15 Multi-Stage Fracture 4781.70 4781.80 0
2018-10-15 Multi-Stage Fracture 4693.20 4693.30 0
2018-10-15 Multi-Stage Fracture 4621.70 4621.80 0
2018-10-15 Multi-Stage Fracture 4519.40 4519.50 0
2018-10-16 Multi-Stage Fracture 4431.70 4431.80 0
2018-10-16 Multi-Stage Fracture 4343.60 4343.70 0
2018-10-14 Multi-Stage Fracture 5830.30 5830.40 0
2018-10-16 Multi-Stage Fracture 4255.20 4255.30 0
2018-10-16 Multi-Stage Fracture 4168.40 4168.50 0
2018-10-16 Multi-Stage Fracture 4080.80 4080.90 0
2018-10-16 Multi-Stage Fracture 3993.40 3993.50 0
2018-10-16 Multi-Stage Fracture 3905.60 3905.70 0
2018-10-16 Multi-Stage Fracture 3803.80 3803.90 0
2018-10-16 Multi-Stage Fracture 3703.40 3703.50 0
2018-10-16 Multi-Stage Fracture 3601.60 3601.70 0
2018-10-16 Multi-Stage Fracture 3514.30 3514.40 0
2018-10-16 Multi-Stage Fracture 3471.20 3471.30 0
2018-10-14 Multi-Stage Fracture 5743.40 5743.50 0
2018-10-14 Multi-Stage Fracture 5656.00 5656.10 0
2018-10-14 Multi-Stage Fracture 5569.30 5569.40 0
2018-10-14 Multi-Stage Fracture 5495.80 5495.90 0
2018-10-14 Multi-Stage Fracture 5394.20 5394.30 0
2018-10-15 Multi-Stage Fracture 5307.30 5307.40 0
2018-10-15 Multi-Stage Fracture 5219.50 5219.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-14 2018-10-16 3,306 16,237 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.2042 N/A
40/70 Prime Plus Calfrac Quartz 14808-60-7 100 2.58 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.5344 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 1.0623 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0106 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0106 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0106 N/A
Polyethylene glycol 25322-68-3 100 0.0106 N/A
Sodium bromide 7647-15-6 100 0.0106 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0451 N/A
DynaRate 6000 Calfrac Friction Reducer Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0896 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0896 N/A
Proprietary polymer Trade Secret 100 0.0896 N/A
Proprietary surfactant blend Trade Secret 100 0.0896 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-10-13 2018-10-16 Surface Water - Runoff 18076
2018-10-13 2018-10-16 Recycled Fracturing Water (treated at well site) 371
2018-10-13 2018-10-16 Recycled Fracturing Water (treated at well site) 371

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 696 0.0 0.0 0.0
2019 7817 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-16 No Incident Encountered 0.00 0.00
2018-10-29 No Incident Encountered 0.00 0.00

For data sources see[10]

References