If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0586013408000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.055876,"lon":-118.05432,"icon":""}]} |
Location: 00/08-34-058-01W6/0 | |
Location Alias: 00/08-34-58-01 W6M | |
Location Alias 2: 00/08-34-058-01 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 6 | |
Range: 01 | |
Section: 34 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: MOBIL ET AL BOLTON 8-34-58-1 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0074252 | |
License Date: 1979-01-31 | |
License Status: RecCertified | |
Spud Date: 1979-03-01 | |
Final Drill Date: 1979-07-21 | |
Well Total Depth: 4940.00 m | |
Surface Hole Latitude: 54.055876 | |
Surface Hole Longitude: -118.054320 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-01-31 | Obtained License |
1979-07-21 | Finished Drilling |
1979-08-03 | Drill Stem Test Performed |
1979-08-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-08-10 | Perforation Treatment Performed - Jet Perforation |
1979-08-11 | Drill Stem Test Performed |
1979-08-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-08-12 | Perforation Treatment Performed - Jet Perforation |
1979-08-13 | Drill Stem Test Performed |
1979-08-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-08-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-08-15 | Kick Occurred |
1979-08-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-08-15 | Perforation Treatment Performed - Jet Perforation |
1979-08-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-08-19 | Perforation Treatment Performed - Jet Perforation |
1979-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-08-21 | Perforation Treatment Performed - Cement Squeeze |
1979-08-21 | Perforation Treatment Performed - Jet Perforation |
1979-08-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-08-23 | Drill Stem Test Performed |
1979-08-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-08-26 | Perforation Treatment Performed - Jet Perforation |
1979-08-27 | Drill Stem Test Performed |
1979-08-28 | Perforation Treatment Performed - Cement Plug |
1979-08-29 | Perforation Treatment Performed - Cement Squeeze |
1979-08-29 | Perforation Treatment Performed - Jet Perforation |
1979-08-30 | Perforation Treatment Performed - Jet Perforation |
1979-09-04 | Perforation Treatment Performed - Cement Plug |
1979-09-06 | Well Abandoned |
1979-09-06 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-08-10 | Perforation | 3386.00 | 3400.00 | 13 |
1979-08-15 | Acid Treatment | 2911.00 | 2927.00 | 0 |
1979-08-19 | Packing Device Capped w/Cement | 2790.00 | 2790.00 | 0 |
1979-08-19 | Perforation | 2425.00 | 2426.00 | 13 |
1979-08-21 | Perforation | 2299.00 | 2300.00 | 13 |
1979-08-21 | Cement Squeeze | 2425.00 | 2426.00 | 0 |
1979-08-21 | Packing Device Capped w/Cement | 2420.00 | 2420.00 | 0 |
1979-08-21 | Perforation | 2383.00 | 2386.00 | 13 |
1979-08-22 | Acid Treatment | 2383.00 | 2386.00 | 0 |
1979-08-26 | Perforation | 2351.00 | 2354.00 | 13 |
1979-08-26 | Acid Treatment | 2351.00 | 2354.00 | 0 |
1979-08-10 | Acid Treatment | 3386.00 | 3400.00 | 0 |
1979-08-28 | Cement Plug | 2275.00 | 2375.00 | 0 |
1979-08-29 | Perforation | 2299.00 | 2300.00 | 13 |
1979-08-29 | Cement Squeeze | 2299.00 | 2300.00 | 0 |
1979-08-30 | Perforation | 554.00 | 555.00 | 13 |
1979-09-04 | Cement Plug | 555.00 | 605.00 | 0 |
1979-08-12 | Packing Device Capped w/Cement | 3095.00 | 3095.00 | 0 |
1979-08-12 | Perforation | 2975.50 | 2989.00 | 13 |
1979-08-13 | Acid Treatment | 2975.50 | 2989.00 | 0 |
1979-08-14 | Packing Device Capped w/Cement | 2950.00 | 2950.00 | 0 |
1979-08-15 | Perforation | 2927.00 | 2932.00 | 13 |
1979-08-15 | Perforation | 2916.00 | 2918.00 | 13 |
1979-08-15 | Perforation | 2908.00 | 2911.00 | 13 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1979-08-15 | Kick | 4940.00 | 4940.00 |
For data sources see[5]