X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585272309000

Well Details

Well ID: 0585272309000
Loading map...
Location: 00/09-23-058-27W5/0
Location Alias: 00/09-23-58-27 W5M
Location Alias 2: 00/09-23-058-27 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 27
Section: 23
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ LELAND 9-23-58-27
Operator Name: Tourmaline Oil Corp.
License Number: 0484916
License Date: 2017-08-08
License Status: Issued
Spud Date: 2019-01-02
Final Drill Date: 2019-02-14
Well Total Depth: 4435.00 m
Surface Hole Latitude: 54.030709
Surface Hole Longitude: -117.916550

For data sources see[1][2]

Well History

Date Event
2017-08-08 Obtained License
2019-01-03 Surface Casing Operation Performed
2019-01-07 Intermediate Casing Operation Performed
2019-02-09 Direction Drilling Operation Performed - Deviate
2019-02-11 Direction Drilling Operation Performed - Horizontal
2019-02-12 Well Log Performed
2019-02-14 Finished Drilling
2019-02-14 Well Log Performed
2019-02-14 Well Mode changed to Drilled and Cased
2019-02-15 Well Log Performed
2019-02-16 Production Casing Operation Performed
2019-02-16 Rig Released
2019-02-28 Well Log Performed
2019-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-09 Well Began Production
2019-03-09 Well Fluid changed to Gas
2019-03-09 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-02 Trinidad Drilling Ltd. 39 N/A Set Surface
2019-02-08 Trinidad Drilling Ltd. 39 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-02-09 2781.70 Deviate (5 - 79 degrees)
2019-02-11 3179.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-07 Multi-Stage Fracture 4380.20 4380.30 0
2019-03-08 Multi-Stage Fracture 3914.40 3914.50 0
2019-03-08 Multi-Stage Fracture 3861.40 3861.50 0
2019-03-08 Multi-Stage Fracture 3808.40 3808.50 0
2019-03-08 Multi-Stage Fracture 3755.50 3755.60 0
2019-03-08 Multi-Stage Fracture 3702.50 3702.60 0
2019-03-08 Multi-Stage Fracture 3649.50 3649.60 0
2019-03-08 Multi-Stage Fracture 3596.50 3596.60 0
2019-03-08 Multi-Stage Fracture 3543.50 3543.60 0
2019-03-08 Multi-Stage Fracture 3490.50 3490.60 0
2019-03-08 Multi-Stage Fracture 3437.50 3437.60 0
2019-03-08 Multi-Stage Fracture 4338.30 4338.40 0
2019-03-08 Multi-Stage Fracture 3384.50 3384.60 0
2019-03-09 Multi-Stage Fracture 3331.60 3331.70 0
2019-03-09 Multi-Stage Fracture 3278.60 3278.70 0
2019-03-09 Multi-Stage Fracture 3225.60 3225.70 0
2019-03-09 Multi-Stage Fracture 3160.10 3160.20 0
2019-03-08 Multi-Stage Fracture 4285.30 4285.40 0
2019-03-08 Multi-Stage Fracture 4232.30 4232.40 0
2019-03-08 Multi-Stage Fracture 4179.30 4179.40 0
2019-03-08 Multi-Stage Fracture 4126.30 4126.40 0
2019-03-08 Multi-Stage Fracture 4073.30 4073.40 0
2019-03-08 Multi-Stage Fracture 4020.30 4020.40 0
2019-03-08 Multi-Stage Fracture 3967.30 3967.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-07 2019-03-09 3,082 5,795 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.6537 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.4193 N/A
silica crystalline 14808-60-7 100 3.4193 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.997 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.7389 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0107 N/A
dibromoacetonitrile 3252-43-5 100 0.0107 N/A
non-hazardous ingredients Not Available 100 0.0107 N/A
polyethylene glycol 25322-68-3 100 0.0107 N/A
sodium bromide 7647-15-6 100 0.0107 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0888 N/A
water Not Available 100 0.0888 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0503 N/A
non-hazardous ingredients Not Available 100 0.0503 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0408 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0408 N/A
methanol 67-56-1 100 0.0408 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0408 N/A
non-hazardous ingredients Not Available 100 0.0408 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-03-02 2019-03-10 Recycled Fracturing Water (treated at well site) 2774
2019-03-02 2019-03-10 Recycled Fracturing Water (treated at well site) 2282
2019-03-02 2019-03-10 Recycled Fracturing Water (treated at independent stand-alone facility) 739

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 6979 0.0 0.0 0.0
2020 1450 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-14 No Incident Encountered 0.00 0.00
2019-03-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References