X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585261805000

Well Details

Well ID: 0585261805000
Loading map...
Location: 00/05-18-058-26W5/0
Location Alias: 00/05-18-58-26 W5M
Location Alias 2: 00/05-18-058-26 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 26
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: CVE ET AL 100 HZ LELAND 5-18-58-26
Operator Name: Cenovus Energy Inc.
License Number: 0484800
License Date: 2017-07-31
License Status: Issued
Spud Date: 2017-09-09
Final Drill Date: 2017-12-06
Well Total Depth: 4961.00 m
Surface Hole Latitude: 54.016025
Surface Hole Longitude: -117.832955

For data sources see[1][2]

Well History

Date Event
2017-07-31 Obtained License
2017-09-10 Lost Circulation Occurred
2017-09-11 Surface Casing Operation Performed
2017-11-23 Intermediate Casing Operation Performed
2017-11-25 Direction Drilling Operation Performed - Deviate
2017-11-28 Direction Drilling Operation Performed - Horizontal
2017-12-06 Finished Drilling
2017-12-06 Well Log Performed
2017-12-06 Well Mode changed to Drilled and Cased
2017-12-07 Perforation Treatment Performed - Open-Hole Completion
2017-12-07 Production Casing Operation Performed
2017-12-09 Rig Released
2017-12-09 Well Log Performed
2018-02-04 Well Fluid changed to Gas
2018-02-04 Well Mode changed to Testing
2018-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-13 Well Began Production
2018-02-13 Well Fluid changed to Gas
2018-02-13 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-09-09 Beaver Drilling Ltd. 15 N/A Drill To LD
2017-11-17 Beaver Drilling Ltd. 15 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-11-25 2671.30 Deviate (5 - 79 degrees)
2017-11-28 3253.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-07 Open Hole/Barefoot Completion 4949.40 4961.00 0
2018-02-08 Multi-Stage Fracture 4363.80 4364.30 0
2018-02-08 Multi-Stage Fracture 4289.80 4290.30 0
2018-02-08 Multi-Stage Fracture 4219.30 4219.80 0
2018-02-08 Multi-Stage Fracture 4147.20 4147.70 0
2018-02-08 Multi-Stage Fracture 4077.50 4078.00 0
2018-02-09 Multi-Stage Fracture 4003.70 4004.20 0
2018-02-09 Multi-Stage Fracture 3929.70 3930.20 0
2018-02-09 Multi-Stage Fracture 3857.10 3857.60 0
2018-02-09 Multi-Stage Fracture 3799.90 3800.40 0
2018-02-09 Multi-Stage Fracture 3726.90 3727.40 0
2018-02-08 Multi-Stage Fracture 4925.10 4925.60 0
2018-02-09 Multi-Stage Fracture 3655.60 3656.10 0
2018-02-09 Multi-Stage Fracture 3584.30 3584.80 0
2018-02-09 Multi-Stage Fracture 3513.20 3513.70 0
2018-02-09 Multi-Stage Fracture 3454.60 3455.10 0
2018-02-08 Multi-Stage Fracture 4851.50 4852.00 0
2018-02-08 Multi-Stage Fracture 4778.00 4778.50 0
2018-02-08 Multi-Stage Fracture 4718.90 4719.40 0
2018-02-08 Multi-Stage Fracture 4646.50 4647.00 0
2018-02-08 Multi-Stage Fracture 4576.70 4577.20 0
2018-02-08 Multi-Stage Fracture 4504.20 4504.70 0
2018-02-08 Multi-Stage Fracture 4433.80 4434.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-08 2018-02-09 3,035 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 87.1008 N/A
Slickwater Schlumberger Quartz. Crystalline silica 14808-60-7 100 4.4364 N/A
Slickwater Schlumberger Energizing Fluid 2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.136 N/A
2-Propenamid (impurity) 79-06-1 100 0 N/A
Acetic acid. potassium salt 127-08-2 100 0 N/A
Acrylamide. 2-acrylamido-2-methylpropanesulfonic
acid. sodiu
38193-60-1 100 0.0183 N/A
Alcohol. C11-14. ethoxylated 78330-21-9 100 0.0017 N/A
Alcohols. C9-11-iso-. C10-rich 68526-85-2 100 0.0008 N/A
Copper(II) sulfate 7758-98-7 100 0 N/A
Distillates. petroleum. hydrotreated light 64742-47-8 100 0.0163 N/A
Ethylene Glycol 107-21-1 100 0.006 N/A
Glutaraldehyde 111-30-8 100 0.0018 N/A
Methanol (impurity) 67-56-1 100 0 N/A
Sodium chloride 7647-14-5 100 0.0097 N/A
Sodium salt of Polymaleic Acid Copolymer 111560-38-4 100 0.0017 N/A
Sorbitan monooleate 1338-43-8 100 0.001 N/A
Sorbitan monooleate. ethoxylated 9005-65-6 100 0.0007 N/A
Tetrasodium ethylenediaminetetraacetate 64-02-8 100 0 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-04 2018-01-08 Surface Water - River 9192
2018-02-09 2018-02-09 Recycled Fracturing Water (treated at well site) 1000

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6295 0.0 0.0 0.0
2019 7591 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-10 Lost Circulation 619.00 619.00
2018-03-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References