X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585242012000

Well Details

Well ID: 0585242012000
Loading map...
Location: 00/12-20-058-24W5/0
Location Alias: 00/12-20-58-24 W5M
Location Alias 2: 00/12-20-058-24 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 24
Section: 20
County/Municipality: Yellowhead County
Well Name: TALISMAN COLT 12-20-58-24
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0145672
License Date: 1990-10-03
License Status: Suspension
Spud Date: 1990-10-21
Final Drill Date: 1990-12-29
Well Total Depth: 3881.00 m
Surface Hole Latitude: 54.029185
Surface Hole Longitude: -117.541141

For data sources see[1][2]

Well History

Date Event
1990-10-03 Obtained License
1990-10-23 Surface Casing Operation Performed
1990-11-26 Well Log Performed
1990-11-29 Intermediate Casing Operation Performed
1990-12-26 Lost Circulation Occurred
1990-12-29 Finished Drilling
1990-12-29 Well Log Performed
1991-01-01 Well Log Performed
1991-01-04 Lost Circulation Occurred
1991-01-06 Well Log Performed
1991-01-07 Perforation Treatment Performed - Jet Perforation
1991-01-08 Perforation Treatment Performed - Cement Squeeze
1991-01-08 Perforation Treatment Performed - Jet Perforation
1991-01-08 Well Log Performed
1991-01-09 Liner Casing Operation Performed
1991-01-09 Perforation Treatment Performed - Cement Squeeze
1991-01-09 Perforation Treatment Performed - Jet Perforation
1991-01-11 Perforation Treatment Performed - Cement Squeeze
1991-01-12 Well Log Performed
1991-01-14 Well Log Performed
1991-01-15 Liner Casing Operation Performed
1991-01-15 Well Log Performed
1991-01-18 Well Log Performed
1991-01-19 Rig Released
1991-03-11 Well Log Performed
1991-03-19 Perforation Treatment Performed - Jet Perforation
1991-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-01 Well Mode changed to Drilled and Cased
2002-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-21 Plug Back Performed
2002-12-21 Well Mode changed to Abandoned Zone
2003-01-14 Perforation Treatment Performed - Jet Perforation
2003-01-14 Well Log Performed
2003-01-16 Perforation Treatment Performed - Fractured
2004-10-13 Perforation Treatment Performed - Jet Perforation
2004-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-16 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-01-07 Perforation 3463.00 3465.00 14
2002-12-21 Packing Device Capped w/Cement 3789.30 3797.30 0
2003-01-14 Perforation 2916.00 2920.00 17
2003-01-16 Fracture 2916.00 2920.00 0
2004-10-13 Perforation 2899.00 2903.00 17
2004-10-16 Packing Device Capped w/Cement 2905.00 2913.00 0
2004-10-16 Packing Device Capped w/Cement 2884.00 2892.00 0
1991-01-08 Cement Squeeze 3463.00 3465.00 0
1991-01-08 Perforation 2738.00 2739.00 14
1991-01-08 Cement Squeeze 2738.00 2739.00 0
1991-01-09 Perforation 3359.00 3360.00 14
1991-01-09 Cement Squeeze 3359.00 3360.00 0
1991-01-11 Cement Squeeze 3463.00 3465.00 0
1991-03-19 Perforation 3825.00 3847.00 13
1991-03-23 Acid Treatment 3825.00 3847.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-12-26 Lost Circulation 3881.00 3881.00
1991-01-04 Lost Circulation 3881.00 3881.00

For data sources see[5]

References