X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585223007000

Well Details

Well ID: 0585223007000
Loading map...
Location: 00/07-30-058-22W5/0
Location Alias: 00/07-30-58-22 W5M
Location Alias 2: 00/07-30-058-22 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 22
Section: 30
County/Municipality: Yellowhead County
Well Name: MAPAN ENERGY FIR 7-30-58-22
Operator Name: Tourmaline Oil Corp.
License Number: 0332599
License Date: 2005-06-09
License Status: Issued
Spud Date: 2005-07-09
Final Drill Date: 2005-09-07
Well Total Depth: 3855.00 m
Surface Hole Latitude: 54.039881
Surface Hole Longitude: -117.263073

For data sources see[1][2]

Well History

Date Event
2005-06-09 Obtained License
2005-07-15 Surface Casing Operation Performed
2005-07-23 Direction Drilling Operation Performed - Deviate
2005-08-02 Well Log Performed
2005-08-04 Intermediate Casing Operation Performed
2005-08-25 Well Log Performed
2005-08-27 Intermediate Casing Operation Performed
2005-09-07 Finished Drilling
2005-09-07 Well Log Performed
2005-09-07 Well Mode changed to Drilled and Cased
2005-09-11 Liner Casing Operation Performed
2005-09-15 Drill Stem Test Performed
2005-09-16 Rig Released
2005-11-29 Perforation Treatment Performed - Jet Perforation
2006-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-01-20 Well Fluid changed to Gas
2006-01-20 Well Mode changed to Testing
2006-01-31 Well Fluid changed to Gas
2006-01-31 Well Mode changed to Test Completed
2008-07-05 Well Fluid changed to Gas
2008-07-05 Well Mode changed to Testing
2008-07-31 Well Fluid changed to Gas
2008-07-31 Well Mode changed to Test Completed
2008-08-01 Perforation Treatment Performed - Bridge Plug No Cement Required
2008-08-01 Well Fluid changed to Gas
2008-08-01 Well Mode changed to Testing
2008-08-06 Perforation Treatment Performed - Bridge Plug No Cement Required
2008-08-13 Perforation Treatment Performed - Bridge Plug No Cement Required
2008-08-26 Perforation Treatment Performed - Jet Perforation
2008-08-27 Perforation Treatment Performed - Fractured
2008-08-31 Well Fluid changed to Gas
2008-08-31 Well Mode changed to Test Completed
2008-09-05 Well Fluid changed to Gas
2008-09-05 Well Mode changed to Testing
2008-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-25 Perforation Treatment Performed - Jet Perforation
2008-09-28 Perforation Treatment Performed - Fractured
2008-09-29 Perforation Treatment Performed - Jet Perforation
2008-09-30 Well Fluid changed to Gas
2008-09-30 Well Mode changed to Test Completed
2008-10-01 Perforation Treatment Performed - Fractured
2009-07-22 Well Began Production
2009-07-22 Well Fluid changed to Gas
2009-07-22 Well Mode changed to Flowing
2011-04-04 Well Fluid changed to Gas
2011-04-04 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-07-23 1590.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-11-29 Perforation 3768.00 3779.00 17
2008-09-24 Packing Device Capped w/Cement 3309.00 3330.00 0
2008-09-24 Packing Device Capped w/Cement 2746.00 2755.00 0
2008-09-25 Perforation 2699.50 2700.50 19
2008-09-25 Perforation 2646.00 2647.00 10
2008-09-28 Fracture 2646.00 2700.50 0
2008-09-29 Perforation 2538.00 2539.00 4
2008-09-29 Perforation 2504.00 2505.00 4
2008-09-29 Perforation 2478.00 2479.00 4
2008-09-29 Perforation 2407.50 2408.50 4
2008-09-29 Perforation 2361.00 2362.00 4
2006-01-20 Acid Treatment 3768.00 3779.00 0
2008-09-29 Perforation 2353.00 2354.00 4
2008-09-29 Perforation 2169.00 2170.00 3
2008-09-29 Perforation 2159.00 2160.00 3
2008-09-29 Perforation 1841.00 1842.00 3
2008-10-01 Fracture 1841.00 2539.00 0
2008-08-01 Bridge Plug, No Cement 3760.00 3761.00 0
2008-08-06 Bridge Plug, No Cement 3759.00 3760.00 0
2008-08-13 Bridge Plug, No Cement 3753.20 3754.20 0
2008-08-26 Perforation 3747.50 3748.50 6
2008-08-26 Perforation 3731.00 3732.00 6
2008-08-27 Fracture 3731.00 3748.50 0
2008-09-21 Packing Device Capped w/Cement 3697.00 3717.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 56 0.0 0.0 0.0
2008 854 0.0 0.0 0.0
2009 3875 0.0 0.0 0.0
2010 8325 0.0 0.0 0.0
2011 8461 0.0 0.0 0.0
2012 8616 0.0 0.0 0.0
2013 8397 0.0 0.0 0.0
2014 8329 0.0 0.0 0.0
2015 8513 0.0 0.0 0.0
2016 8272 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8738 0.0 0.0 0.0
2019 8231 0.0 0.0 0.0
2020 2033 0.0 0.0 0.0

For data sources see[6]

References