X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585222105003

Well Details

Well ID: 0585222105003
Loading map...
Location: 00/05-21-058-22W5/3
Location Alias: 00/05-21-58-22 W5M
Location Alias 2: 00/05-21-058-22 W5/03
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 22
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL CECILIA 5-21-58-22
Operator Name: Paramount Resources Ltd.
License Number: 0361312
License Date: 2006-08-08
License Status: Issued
Spud Date: 2006-08-27
Final Drill Date: 2006-09-05
Well Total Depth: 2708.00 m
Surface Hole Latitude: 54.027354
Surface Hole Longitude: -117.216401

For data sources see[1][2]

Well History

Date Event
2006-08-08 Obtained License
2006-08-29 Surface Casing Operation Performed
2006-09-05 Finished Drilling
2006-09-05 Well Mode changed to Drilled and Cased
2006-09-07 Well Log Performed
2006-09-08 Production Casing Operation Performed
2006-09-08 Rig Released
2006-09-11 Well Log Performed
2006-09-12 Perforation Treatment Performed - Jet Perforation
2006-09-13 Perforation Treatment Performed - Fractured
2006-09-15 Well Log Performed
2006-09-17 Perforation Treatment Performed - Jet Perforation
2006-09-22 Perforation Treatment Performed - Fractured
2006-09-24 Well Log Performed
2006-09-25 Perforation Treatment Performed - Jet Perforation
2006-09-26 Perforation Treatment Performed - Fractured
2006-09-28 Well Log Performed
2006-09-29 Perforation Treatment Performed - Jet Perforation
2006-09-30 Perforation Treatment Performed - Fractured
2007-02-03 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-09-12 Perforation 2688.00 2690.00 20
2006-09-29 Perforation 2177.00 2179.00 20
2006-09-29 Perforation 2181.00 2182.00 20
2006-09-30 Fracture 2177.00 2182.00 0
2006-09-12 Perforation 2692.00 2692.50 20
2006-09-13 Fracture 2688.00 2692.50 0
2006-09-17 Perforation 2457.20 2458.90 2
2006-09-17 Perforation 2460.90 2530.30 2
2006-09-17 Perforation 2533.90 2534.00 2
2006-09-22 Fracture 2457.20 2534.00 0
2006-09-25 Perforation 2300.00 2301.00 20
2006-09-26 Fracture 2300.00 2301.00 0

For data sources see[4]



References