X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585212709000

Well Details

Well ID: 0585212709000
Loading map...
Location: 00/09-27-058-21W5/0
Location Alias: 00/09-27-58-21 W5M
Location Alias 2: 00/09-27-058-21 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 21
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL HZ FIR 9-27-58-21
Operator Name: Paramount Resources Ltd.
License Number: 0435752
License Date: 2011-08-05
License Status: Amended
Spud Date: 2011-12-07
Final Drill Date: 2012-01-03
Well Total Depth: 3612.00 m
Surface Hole Latitude: 54.034989
Surface Hole Longitude: -117.026530

For data sources see[1][2]

Well History

Date Event
2011-08-05 Obtained License
2011-12-08 Well Log Performed
2011-12-09 Surface Casing Operation Performed
2011-12-13 Direction Drilling Operation Performed - Deviate
2011-12-17 Well Log Performed
2011-12-20 Intermediate Casing Operation Performed
2011-12-28 Direction Drilling Operation Performed - Horizontal
2012-01-03 Finished Drilling
2012-01-03 Well Log Performed
2012-01-03 Well Mode changed to Drilled and Cased
2012-01-05 Rig Released
2012-01-17 Liner Casing Operation Performed
2012-01-17 Perforation Treatment Performed - Open-Hole Completion
2012-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-06 Well Began Production
2012-04-06 Well Fluid changed to Gas
2012-04-06 Well Mode changed to Flowing
2015-08-15 Well Fluid changed to Gas
2015-08-15 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-13 2273.00 Deviate (5 - 79 degrees)
2011-12-28 2722.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-17 Open Hole/Barefoot Completion 3603.00 3612.00 0
2012-03-06 Multi-Stage Fracture 2735.30 2735.40 0
2012-03-06 Multi-Stage Fracture 2809.60 2809.70 0
2012-03-06 Multi-Stage Fracture 2884.00 2884.10 0
2012-03-06 Multi-Stage Fracture 2972.30 2972.40 0
2012-03-05 Multi-Stage Fracture 3047.60 3047.70 0
2012-03-05 Multi-Stage Fracture 3119.50 3119.60 0
2012-03-05 Multi-Stage Fracture 3195.10 3195.20 0
2012-03-05 Multi-Stage Fracture 3271.20 3271.30 0
2012-03-05 Multi-Stage Fracture 3347.70 3347.80 0
2012-03-05 Multi-Stage Fracture 3422.10 3422.20 0
2012-03-05 Multi-Stage Fracture 3497.10 3497.20 0
2012-03-05 Multi-Stage Fracture 3579.40 3579.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4807 0.0 0.0 0.0
2013 8509 0.0 0.0 0.0
2014 8313 0.0 0.0 0.0
2015 7274 0.0 0.0 0.0
2016 5431 0.0 0.0 0.0
2017 5498 0.0 0.0 0.0
2018 5484 0.0 0.0 0.0
2019 5953 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References