X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585203004000

Well Details

Well ID: 0585203004000
Loading map...
Location: 00/04-30-058-20W5/0
Location Alias: 00/04-30-58-20 W5M
Location Alias 2: 00/04-30-058-20 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 20
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ FIR 4-30-58-20
Operator Name: Paramount Resources Ltd.
License Number: 0433956
License Date: 2011-06-02
License Status: Issued
Spud Date: 2011-07-29
Final Drill Date: 2011-09-07
Well Total Depth: 4193.00 m
Surface Hole Latitude: 54.053329
Surface Hole Longitude: -116.969017

For data sources see[1][2]

Well History

Date Event
2011-06-02 Obtained License
2011-07-29 Well Log Performed
2011-08-03 Surface Casing Operation Performed
2011-08-19 Intermediate Casing Operation Performed
2011-08-20 Direction Drilling Operation Performed - Horizontal
2011-09-07 Finished Drilling
2011-09-07 Well Mode changed to Drilled and Cased
2011-09-11 Liner Casing Operation Performed
2011-09-12 Rig Released
2011-09-16 Well Log Performed
2011-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-30 Perforation Treatment Performed - Open-Hole Completion
2011-10-08 Well Began Production
2011-10-08 Well Fluid changed to Gas
2011-10-08 Well Mode changed to Flowing
2011-12-03 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-20 2778.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-30 Open Hole/Barefoot Completion 4188.80 4193.00 0
2011-09-30 Multi-Stage Fracture 3607.40 3607.50 0
2011-09-30 Multi-Stage Fracture 3529.80 3529.90 0
2011-09-30 Multi-Stage Fracture 3451.10 3451.20 0
2011-09-30 Multi-Stage Fracture 3385.80 3385.90 0
2011-09-30 Multi-Stage Fracture 3306.60 3306.70 0
2011-09-30 Multi-Stage Fracture 3231.50 3231.60 0
2011-09-30 Multi-Stage Fracture 3156.40 3156.50 0
2011-09-30 Multi-Stage Fracture 3081.40 3081.50 0
2011-09-30 Multi-Stage Fracture 3006.60 3006.70 0
2011-09-30 Multi-Stage Fracture 2943.60 2943.70 0
2011-09-30 Multi-Stage Fracture 4167.80 4167.90 0
2011-09-30 Multi-Stage Fracture 2855.00 2855.10 0
2011-09-30 Multi-Stage Fracture 2776.40 2776.50 0
2011-09-30 Multi-Stage Fracture 4113.50 4113.60 0
2011-09-30 Multi-Stage Fracture 4039.30 4039.40 0
2011-09-30 Multi-Stage Fracture 3964.40 3964.50 0
2011-09-30 Multi-Stage Fracture 3889.50 3889.60 0
2011-09-30 Multi-Stage Fracture 3818.90 3819.00 0
2011-09-30 Multi-Stage Fracture 3743.20 3743.30 0
2011-09-30 Multi-Stage Fracture 3668.80 3668.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1438 0.0 0.0 0.0
2012 7920 0.0 0.0 0.0
2013 8304 0.0 0.0 0.0
2014 8183 0.0 0.0 0.0
2015 8495 0.0 0.0 0.0
2016 8615 0.0 0.0 0.0
2017 6191 0.0 0.0 0.0
2018 8183 0.0 0.0 0.0
2019 8367 0.0 0.0 0.0
2020 816 0.0 0.0 0.0

For data sources see[6]

References