X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585202613020

Well Details

Well ID: 0585202613020
Loading map...
Location: 02/13-26-058-20W5/0
Location Alias: 02/13-26-58-20 W5M
Location Alias 2: 02/13-26-058-20 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 20
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC 102 ET AL PINE CK 13-26-58-20
Operator Name: XTO Energy Canada ULC
License Number: 0409002
License Date: 2009-02-05
License Status: Suspension
Spud Date: 2009-02-08
Final Drill Date: 2009-03-03
Well Total Depth: 3625.00 m
Surface Hole Latitude: 54.035386
Surface Hole Longitude: -116.871925

For data sources see[1][2]

Well History

Date Event
2009-02-03 Well Log Performed
2009-02-05 Obtained License
2009-02-09 Surface Casing Operation Performed
2009-02-13 Direction Drilling Operation Performed - Horizontal
2009-02-20 Production Casing Operation Performed
2009-03-03 Finished Drilling
2009-03-03 Well Log Performed
2009-03-03 Well Mode changed to Drilled and Cased
2009-03-05 Liner Casing Operation Performed
2009-03-05 Perforation Treatment Performed - Open-Hole Completion
2009-03-07 Rig Released
2009-03-16 Perforation Treatment Performed - Multi-Stage Fracture
2009-03-16 Well Fluid changed to Gas
2009-03-16 Well Mode changed to Testing
2009-04-01 Well Began Production
2009-04-01 Well Fluid changed to Gas
2009-04-01 Well Mode changed to Flowing
2011-09-17 Well Log Performed
2016-08-01 Well Fluid changed to Gas
2016-08-01 Well Mode changed to Pumping
2016-12-01 Well Fluid changed to Gas
2016-12-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-02-13 2071.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-03-05 Open Hole/Barefoot Completion 3603.30 3625.00 0
2009-03-16 Multi-Stage Fracture 3594.00 3595.20 0
2009-03-16 Multi-Stage Fracture 3517.90 3518.70 0
2009-03-16 Multi-Stage Fracture 3285.40 3286.20 0
2009-03-16 Multi-Stage Fracture 3122.00 3122.80 0
2009-03-16 Multi-Stage Fracture 2963.70 2964.40 0
2009-03-16 Multi-Stage Fracture 2795.80 2796.50 0
2009-03-16 Multi-Stage Fracture 2698.00 2698.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 2734 0.0 0.0 0.0
2010 6497 0.0 0.0 0.0
2011 4874 0.0 0.0 0.0
2012 5066 0.0 0.0 0.0
2013 3091 0.0 0.0 0.0
2014 4100 0.0 0.0 0.0
2015 3525 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-03-16 No Incident Encountered 0.00 0.00

For data sources see[7]

References