X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585201511002

Well Details

Well ID: 0585201511002
Loading map...
Location: 00/11-15-058-20W5/2
Location Alias: 00/11-15-58-20 W5M
Location Alias 2: 00/11-15-058-20 W5/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 20
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL PINE CK 11-15-58-20
Operator Name: Paramount Resources Ltd.
License Number: 0024859
License Date: 1963-09-30
License Status: Issued
Spud Date: 1963-10-12
Final Drill Date: 1963-12-23
Well Total Depth: 3302.50 m
Surface Hole Latitude: 54.015720
Surface Hole Longitude: -116.890493

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-09-30 Obtained License
1963-12-16 Drill Stem Test Performed
1963-12-19 Drill Stem Test Performed
1963-12-21 Drill Stem Test Performed
1963-12-23 Finished Drilling
1963-12-24 Production Casing Operation Performed
1966-08-12 Perforation Treatment Performed - Jet Perforation
1966-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-05-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-03-12 Perforation Treatment Performed - Jet Perforation
1976-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-03-24 Perforation Treatment Performed - Jet Perforation
1976-03-26 Perforation Treatment Performed - Jet Perforation
1976-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-01 Well Mode changed to Drilled and Cased
1976-05-12 Perforation Treatment Performed - Jet Perforation
1976-05-13 Perforation Treatment Performed - Cement Squeeze
1976-05-13 Perforation Treatment Performed - Jet Perforation
1976-05-14 Perforation Treatment Performed - Cement Squeeze
1976-05-14 Perforation Treatment Performed - Jet Perforation
1976-05-17 Perforation Treatment Performed - Jet Perforation
1976-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-19 Perforation Treatment Performed - Jet Perforation
1976-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-05-20 Perforation Treatment Performed - Jet Perforation
1976-05-22 Perforation Treatment Performed - Cement Squeeze
1976-05-25 Perforation Treatment Performed - Jet Perforation
1976-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-08 Perforation Treatment Performed - Cement Squeeze
1978-06-14 Perforation Treatment Performed - Cement Squeeze
1978-06-19 Perforation Treatment Performed - Jet Perforation
1978-06-21 Perforation Treatment Performed - Cement Squeeze
1978-07-01 Perforation Treatment Performed - Jet Perforation
1978-07-19 Perforation Treatment Performed - Fractured
1985-06-01 Well Began Production
1985-06-01 Well Fluid changed to Gas
1985-06-01 Well Mode changed to Flowing
2013-07-04 Well Fluid changed to Gas
2013-07-04 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-08-12 Perforation 3235.80 3240.00 7
1976-03-24 Perforation 2540.80 2541.40 7
1976-03-24 Perforation 2542.90 2545.70 7
1976-03-24 Perforation 2546.60 2549.00 7
1976-03-24 Packing Device Capped w/Cement 2507.00 2514.60 0
1976-03-26 Perforation 2457.30 2457.90 13
1976-03-26 Perforation 2459.70 2461.60 13
1976-03-27 Acid Treatment 2457.30 2461.60 0
1976-05-12 Perforation 2375.90 2379.00 3
1976-05-13 Cement Squeeze 2375.90 2379.00 0
1976-05-13 Perforation 1892.80 1895.90 3
1966-08-12 Perforation 3242.80 3245.80 7
1976-05-14 Cement Squeeze 1892.80 1895.90 0
1976-05-14 Perforation 1810.50 1813.60 3
1976-05-14 Cement Squeeze 1810.50 1813.60 0
1976-05-17 Perforation 1853.20 1856.20 7
1976-05-18 Acid Treatment 1853.20 1856.20 0
1976-05-19 Perforation 1856.20 1868.40 7
1976-05-20 Acid Treatment 1853.20 1868.40 0
1976-05-20 Packing Device Capped w/Cement 1792.20 1801.40 0
1976-05-20 Perforation 1606.30 1609.30 3
1976-05-22 Cement Squeeze 1606.30 1609.30 0
1966-08-13 Acid Treatment 3235.80 3245.80 0
1976-05-25 Perforation 1649.00 1653.20 7
1976-05-26 Acid Treatment 1649.00 1653.20 0
1978-06-08 Cement Squeeze 1649.00 1653.20 0
1978-06-14 Cement Squeeze 1606.30 1609.30 0
1978-06-19 Perforation 1853.20 1868.40 7
1978-06-21 Cement Squeeze 1853.20 1868.40 0
1978-07-01 Perforation 2457.30 2457.90 13
1978-07-01 Perforation 2459.70 2461.60 13
1978-07-19 Fracture 2457.30 2461.60 0
1974-05-20 Packing Device Capped w/Cement 3185.80 3185.80 0
1976-03-12 Perforation 2956.30 2958.10 13
1976-03-15 Acid Treatment 2956.30 2958.10 0
1976-03-20 Acid Treatment 2956.30 2958.10 0
1976-03-21 Acid Treatment 2956.30 2958.10 0
1976-03-21 Packing Device Capped w/Cement 2871.20 2926.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1435 0.0 0.0 0.0
1986 4197 0.0 0.0 0.0
1987 3164 0.0 0.0 0.0
1988 6338 0.0 0.0 0.0
1989 3425 0.0 0.0 0.0
1990 3751 0.0 0.0 0.0
1991 5725 0.0 0.0 0.0
1992 5081 0.0 0.0 0.0
1993 4886 0.0 0.0 0.0
1994 7951 0.0 0.0 0.0
1995 7677 0.0 0.0 0.0
1996 8531 0.0 0.0 0.0
1997 8421 0.0 0.0 0.0
1998 7362 0.0 0.0 0.0
1999 4581 0.0 0.0 0.0
2000 8383 0.0 0.0 0.0
2001 7905 0.0 0.0 0.0
2002 8573 0.0 0.0 0.0
2003 8522 0.0 0.0 0.0
2004 7711 0.0 0.0 0.0
2005 8706 0.0 0.0 0.0
2006 8447 0.0 0.0 0.0
2007 8728 0.0 0.0 0.0
2008 8518 0.0 0.0 0.0
2009 8240 0.0 0.0 0.0
2010 7874 0.0 0.0 0.0
2011 7165 0.0 0.0 0.0
2012 7156 0.0 0.0 0.0
2013 7291 0.0 0.0 0.0
2014 7008 0.0 0.0 0.0
2015 7844 0.0 0.0 0.0
2016 7356 0.0 0.0 0.0
2017 6799 0.0 0.0 0.0

For data sources see[5]

References