X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585173405000

Well Details

Well ID: 0585173405000
Loading map...
Location: 00/05-34-058-17W5/0
Location Alias: 00/05-34-58-17 W5M
Location Alias 2: 00/05-34-058-17 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 17
Section: 34
County/Municipality: Woodlands County
Well Name: BIRCHILL GULF KAYBOBS 5-34-58-17
Operator Name: TAQA North Ltd.
License Number: 0147642
License Date: 1991-01-25
License Status: Abandoned
Spud Date: 1991-01-27
Final Drill Date: 1991-02-27
Well Total Depth: 2884.40 m
Surface Hole Latitude: 54.057256
Surface Hole Longitude: -116.449257

For data sources see[1][2]

Well History

Date Event
1990-03-01 Well Log Performed
1991-01-25 Obtained License
1991-01-30 Surface Casing Operation Performed
1991-02-09 Lost Circulation Occurred
1991-02-19 Well Log Performed
1991-02-21 Intermediate Casing Operation Performed
1991-02-27 Finished Drilling
1991-02-27 Well Mode changed to Drilled and Cased
1991-03-02 Liner Casing Operation Performed
1991-03-05 Rig Released
1991-03-21 Perforation Treatment Performed - Jet Perforation
1991-03-22 Perforation Treatment Performed - Jet Perforation
1991-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-08 Well Log Performed
1995-10-12 Well Began Production
1995-10-12 Well Fluid changed to Gas
1995-10-12 Well Mode changed to Flowing
2002-05-31 Well Fluid changed to Gas
2002-05-31 Well Mode changed to Suspended
2006-02-06 Perforation Treatment Performed - Jet Perforation
2006-02-07 Perforation Treatment Performed - Fractured
2011-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-25 Plug Back Performed
2011-11-25 Well Fluid changed to Gas
2011-11-25 Well Mode changed to Abandoned Zone
2011-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-27 Perforation Treatment Performed - Jet Perforation
2011-11-27 Plug Back Performed
2011-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-29 Perforation Treatment Performed - Cement Squeeze
2011-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-30 Perforation Treatment Performed - Jet Perforation
2011-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-02 Perforation Treatment Performed - Cement Squeeze
2011-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-09 Perforation Treatment Performed - Cement Squeeze
2011-12-09 Perforation Treatment Performed - Jet Perforation
2011-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-10 Perforation Treatment Performed - Jet Perforation
2011-12-14 Perforation Treatment Performed - Cement Plug
2011-12-14 Perforation Treatment Performed - Cement Squeeze
2012-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-02 Perforation Treatment Performed - Jet Perforation
2012-11-05 Perforation Treatment Performed - Cement Plug
2012-11-05 Perforation Treatment Performed - Cement Squeeze
2012-11-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-03-21 Perforation 2863.50 2864.20 20
2011-11-27 Perforation 1275.00 1276.00 17
2011-11-27 Packing Device Capped w/Cement 1276.00 1280.00 0
2011-11-29 Cement Squeeze 1275.00 1276.00 0
2011-11-29 Packing Device Capped w/Cement 1255.00 1271.00 0
2011-11-30 Perforation 1145.00 1146.00 17
2011-11-30 Packing Device Capped w/Cement 1146.00 1150.00 0
2011-12-02 Cement Squeeze 1145.00 1146.00 0
2011-12-02 Packing Device Capped w/Cement 1124.00 1139.00 0
2011-12-09 Cement Squeeze 925.00 926.00 0
2011-12-09 Packing Device Capped w/Cement 910.00 921.00 0
1991-03-21 Perforation 2869.40 2874.00 20
2011-12-09 Packing Device Capped w/Cement 926.00 928.00 0
2011-12-09 Perforation 925.00 926.00 17
2011-12-10 Packing Device Capped w/Cement 706.00 709.00 0
2011-12-10 Perforation 705.00 706.00 17
2011-12-10 Perforation 480.00 481.00 17
2011-12-14 Cement Squeeze 705.00 706.00 0
2011-12-14 Cement Plug 437.50 702.00 0
2012-02-02 Packing Device Capped w/Cement 340.60 343.00 0
2012-02-02 Perforation 340.00 340.60 4
2012-11-05 Cement Plug 25.00 340.00 0
1991-03-22 Perforation 2840.00 2842.00 20
2012-11-05 Cement Squeeze 340.00 340.60 0
1991-03-22 Perforation 2857.60 2863.50 20
1991-03-26 Acid Treatment 2840.00 2874.00 0
2006-02-06 Perforation 2178.00 2182.00 20
2006-02-07 Fracture 2178.00 2182.00 0
2011-11-25 Packing Device Capped w/Cement 2792.00 2801.00 0
2011-11-27 Packing Device Capped w/Cement 2690.00 2698.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1701 0.0 0.0 0.0
1996 8691 0.0 0.0 0.0
1997 7782 0.0 0.0 0.0
1998 832 0.0 0.0 0.0
1999 315 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1991-02-09 Lost Circulation 2285.00 2285.00
2012-11-08 No Incident Encountered 0.00 0.00
2011-11-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References