X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585171613002

Well Details

Well ID: 0585171613002
Loading map...
Location: 00/13-16-058-17W5/2
Location Alias: 00/13-16-58-17 W5M
Location Alias 2: 00/13-16-058-17 W5/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 17
Section: 16
County/Municipality: Woodlands County
Well Name: BIRCHILL GULF KAYBOBS 13-16-58-17
Operator Name: TAQA North Ltd.
License Number: 0140916
License Date: 1989-09-13
License Status: Abandoned
Spud Date: 2000-12-28
Final Drill Date: 2001-01-13
Well Total Depth: 3100.60 m
Surface Hole Latitude: 54.017931
Surface Hole Longitude: -116.472986

For data sources see[1][2]

Well History

Date Event
1989-09-13 Obtained License
2000-12-30 Direction Drilling Operation Performed - Horizontal
2001-01-05 Liner Casing Operation Performed
2001-01-12 Well Log Performed
2001-01-13 Finished Drilling
2001-01-13 Perforation Treatment Performed - Open-Hole Completion
2001-01-13 Rig Released
2001-01-13 Well Mode changed to Drilled and Cased
2001-02-20 Perforation Treatment Performed - Chemical Squeeze
2005-03-29 Well Began Production
2005-03-29 Well Fluid changed to Gas
2005-03-29 Well Mode changed to Flowing
2012-01-05 Well Fluid changed to Gas
2012-01-05 Well Mode changed to Suspended
2019-09-24 Perforation Treatment Performed - Jet Perforation
2019-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-27 Perforation Treatment Performed - Bridge Plug No Cement Required
2019-09-27 Perforation Treatment Performed - Jet Perforation
2019-09-27 Plug Back Performed
2019-09-27 Well Fluid changed to Gas
2019-09-27 Well Mode changed to Abandoned Zone
2019-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-02 Perforation Treatment Performed - Cement Plug
2019-10-02 Plug Back Performed
2019-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-03 Plug Back Performed
2019-12-17 Well Abandoned
2019-12-17 Well Fluid changed to Gas
2019-12-17 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-12-30 2734.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-13 Open Hole/Barefoot Completion 2910.30 3100.60 0
2019-10-03 Packing Device Capped w/Cement 982.00 990.00 0
2001-02-20 Chemical Squeeze 3030.00 3075.00 0
2019-09-24 Perforation 2637.00 2640.00 17
2019-09-24 Perforation 2633.00 2636.00 17
2019-09-27 Perforation 1080.00 1082.00 17
2019-09-27 Packing Device Capped w/Cement 2420.00 2709.00 0
2019-09-27 Bridge Plug, No Cement 1085.00 1085.50 0
2019-10-02 Cement Plug 1068.50 1082.00 0
2019-10-02 Packing Device Capped w/Cement 1035.00 1068.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 4694 0.0 0.0 0.0
2006 8087 0.0 0.0 0.0
2007 5747 0.0 0.0 0.0
2008 7872 0.0 0.0 0.0
2009 6696 0.0 0.0 0.0
2010 2281 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-19 No Incident Encountered 0.00 0.00

For data sources see[7]

References