X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585113610000

Well Details

Well ID: 0585113610000
Loading map...
Location: 00/10-36-058-11W5/0
Location Alias: 00/10-36-58-11 W5M
Location Alias 2: 00/10-36-058-11 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 11
Section: 36
County/Municipality: Woodlands County
Well Name: Canlin BLUERDGE 10-36-58-11
Operator Name: Canlin Energy Corporation
License Number: 0041213
License Date: 1971-11-04
License Status: Abandoned
Spud Date: 1971-11-30
Final Drill Date: 1971-12-15
Well Total Depth: 1797.40 m
Surface Hole Latitude: 54.060482
Surface Hole Longitude: -115.496163

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-11-04 Obtained License
1971-12-12 Drill Stem Test Performed
1971-12-15 Finished Drilling
1971-12-17 Production Casing Operation Performed
1971-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-12-20 Perforation Treatment Performed - Fractured
1971-12-20 Perforation Treatment Performed - Jet Perforation
1972-01-05 Perforation Treatment Performed - Jet Perforation
1972-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-10-11 Well Mode changed to Drilled and Cased
1976-03-11 Well Began Production
1976-03-11 Well Fluid changed to Gas
1976-03-11 Well Mode changed to Flowing
1977-06-01 Well Fluid changed to Gas
1977-06-01 Well Mode changed to Suspended
1983-10-20 Well Log Performed
1995-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-03 Perforation Treatment Performed - Cement Squeeze
1995-06-03 Plug Back Performed
1995-06-03 Well Fluid changed to Gas
1995-06-03 Well Log Performed
1995-06-03 Well Mode changed to Abandoned
1995-06-05 Perforation Treatment Performed - Cement Plug
1995-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-06 Perforation Treatment Performed - Jet Perforation
1995-06-06 Perforation Treatment Performed - Remedial Casing
1995-06-06 Well Log Performed
1995-06-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-12-20 Perforation 1716.60 1719.10 7
1995-06-06 Remedial Casing Cementing 281.00 282.00 0
1995-06-06 Packing Device Capped w/Cement 277.00 279.00 0
1971-12-20 Acid Treatment 1716.60 1719.10 0
1971-12-20 Fracture 1716.60 1719.10 0
1972-01-05 Perforation 1706.90 1709.90 7
1972-01-08 Acid Treatment 1706.90 1709.90 0
1995-06-03 Cement Squeeze 1706.90 1719.10 0
1995-06-03 Packing Device Capped w/Cement 1680.20 1689.00 0
1995-06-05 Cement Plug 864.20 961.00 0
1995-06-06 Perforation 281.00 282.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 60 0.0 0.0 0.0
1974 336 0.0 0.0 0.0
1976 72 0.0 0.0 0.0
1982 24 0.0 0.0 0.0

For data sources see[5]

References