X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585091703000

Well Details

Well ID: 0585091703000
Loading map...
Location: 00/03-17-058-09W5/0
Location Alias: 00/03-17-58-09 W5M
Location Alias 2: 00/03-17-058-09 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 09
Section: 17
County/Municipality: Lac Ste. Anne County
Well Name: BARR GREENCOURT 3-17-58-9
Operator Name: TAQA North Ltd.
License Number: 0177890
License Date: 1995-05-12
License Status: RecCertified
Spud Date: 1995-05-30
Final Drill Date: 1995-06-06
Well Total Depth: 1576.00 m
Surface Hole Latitude: 54.009585
Surface Hole Longitude: -115.308073

For data sources see[1][2]

Well History

Date Event
1995-05-12 Obtained License
1995-05-31 Surface Casing Operation Performed
1995-06-06 Finished Drilling
1995-06-06 Well Mode changed to Drilled and Cased
1995-06-07 Well Log Performed
1995-06-08 Production Casing Operation Performed
1995-06-08 Rig Released
1995-06-20 Perforation Treatment Performed - Jet Perforation
1995-06-20 Well Log Performed
1995-06-22 Perforation Treatment Performed - Jet Perforation
1995-06-22 Well Log Performed
1995-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-23 Perforation Treatment Performed - Jet Perforation
1995-06-23 Plug Back Performed
1995-06-23 Well Log Performed
1995-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-25 Perforation Treatment Performed - Jet Perforation
1995-06-25 Well Log Performed
1995-07-01 Well Began Production
1995-07-01 Well Fluid changed to Crude Oil
1995-07-01 Well Mode changed to Pumping
1995-07-20 Well Fluid changed to Crude Oil
1995-07-20 Well Mode changed to Suspended
2008-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-16 Perforation Treatment Performed - Cement Plug
2008-03-16 Perforation Treatment Performed - Jet Perforation
2008-03-16 Plug Back Performed
2008-03-16 Well Fluid changed to Crude Oil
2008-03-16 Well Mode changed to Abandoned Zone
2008-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-17 Perforation Treatment Performed - Remedial Casing
2008-03-18 Perforation Treatment Performed - Cement Plug
2008-03-18 Perforation Treatment Performed - Jet Perforation
2008-03-18 Plug Back Performed
2008-03-19 Perforation Treatment Performed - Cement Plug
2008-03-19 Perforation Treatment Performed - Jet Perforation
2008-03-19 Perforation Treatment Performed - Remedial Casing
2008-03-19 Plug Back Performed
2008-03-20 Well Abandoned
2008-03-20 Well Fluid changed to Crude Oil
2008-03-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-20 Perforation 1526.00 1532.00 13
2008-03-17 Remedial Casing Cementing 715.00 715.50 0
2008-03-17 Packing Device Capped w/Cement 701.00 710.00 0
2008-03-18 Perforation 640.00 641.00 17
2008-03-18 Cement Plug 632.00 644.00 0
2008-03-18 Perforation 590.00 591.00 17
2008-03-18 Perforation 423.00 424.00 17
2008-03-19 Perforation 256.00 257.00 17
2008-03-19 Cement Plug 257.00 595.00 0
2008-03-19 Remedial Casing Cementing 256.00 257.00 0
2008-03-19 Cement Plug 178.00 256.00 0
1995-06-22 Perforation 1523.00 1525.00 13
1995-06-23 Packing Device Capped w/Cement 1513.00 1521.00 0
1995-06-23 Perforation 1506.00 1511.00 13
1995-06-24 Acid Treatment 1506.00 1511.00 0
1995-06-25 Perforation 1499.00 1504.00 13
2008-03-16 Packing Device Capped w/Cement 1487.00 1495.00 0
2008-03-16 Perforation 715.00 715.50 17
2008-03-16 Cement Plug 715.60 720.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 471 0.0 0.0 0.0

For data sources see[5]

References