X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585052816000

Well Details

Well ID: 0585052816000
Loading map...
Location: 00/16-28-058-05W5/0
Location Alias: 00/16-28-58-05 W5M
Location Alias 2: 00/16-28-058-05 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 05
Section: 28
County/Municipality: County of Barrhead No. 11
Well Name: TQN BARRH 16-28-58-5
Operator Name: TAQA North Ltd.
License Number: 0284495
License Date: 2003-03-13
License Status: Suspension
Spud Date: 2003-03-21
Final Drill Date: 2003-03-22
Well Total Depth: 502.00 m
Surface Hole Latitude: 54.049360
Surface Hole Longitude: -114.676158

For data sources see[1][2]

Well History

Date Event
2003-03-13 Obtained License
2003-03-21 Surface Casing Operation Performed
2003-03-22 Finished Drilling
2003-03-22 Well Log Performed
2003-03-22 Well Mode changed to Drilled and Cased
2003-03-23 Production Casing Operation Performed
2003-03-24 Rig Released
2003-03-25 Perforation Treatment Performed - Jet Perforation
2003-05-31 Perforation Treatment Performed - Jet Perforation
2003-06-02 Perforation Treatment Performed - Jet Perforation
2003-06-15 Perforation Treatment Performed - Fractured
2003-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-05 Plug Back Performed
2003-07-05 Well Mode changed to Abandoned Zone
2003-07-06 Perforation Treatment Performed - Jet Perforation
2003-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-07-08 Perforation Treatment Performed - Cement Squeeze
2003-07-08 Plug Back Performed
2003-07-09 Perforation Treatment Performed - Cement Squeeze
2003-07-09 Perforation Treatment Performed - Jet Perforation
2003-07-09 Plug Back Performed
2003-07-11 Perforation Treatment Performed - Jet Perforation
2003-07-14 Perforation Treatment Performed - Cement Squeeze
2003-07-14 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-03-25 Perforation 455.00 457.00 17
2003-07-06 Perforation 345.70 347.00 17
2003-07-08 Acid Treatment 345.70 347.00 0
2003-07-08 Cement Squeeze 345.70 347.00 0
2003-07-09 Perforation 292.00 295.00 17
2003-07-09 Cement Squeeze 292.00 295.00 0
2003-07-11 Perforation 232.00 233.00 17
2003-07-14 Cement Squeeze 232.00 233.00 0
2003-05-31 Perforation 466.00 468.00 13
2003-06-02 Perforation 443.00 444.00 13
2003-06-02 Perforation 405.30 406.10 13
2003-06-15 Fracture 466.00 468.00 0
2003-06-15 Fracture 455.00 457.00 0
2003-06-15 Fracture 443.00 444.00 0
2003-06-15 Fracture 405.30 406.10 0
2003-07-05 Packing Device Capped w/Cement 445.00 453.00 0

For data sources see[4]



References