If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0585052516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.046908,"lon":-114.602215,"icon":""}]} |
Location: 00/16-25-058-05W5/0 | |
Location Alias: 00/16-25-58-05 W5M | |
Location Alias 2: 00/16-25-058-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 5 | |
Range: 05 | |
Section: 25 | |
County/Municipality: County of Barrhead No. 11 | |
Well Name: DESMARAIS BARRH 16-25-58-5 | |
Operator Name: Desmarais Energy Corporation | |
License Number: 0330834 | |
License Date: 2005-05-11 | |
License Status: Issued | |
Spud Date: 2005-06-17 | |
Final Drill Date: 2005-06-22 | |
Well Total Depth: 1228.00 m | |
Surface Hole Latitude: 54.046908 | |
Surface Hole Longitude: -114.602215 |
Date | Event |
---|---|
2005-05-11 | Obtained License |
2005-06-18 | Surface Casing Operation Performed |
2005-06-22 | Finished Drilling |
2005-06-22 | Well Mode changed to Drilled and Cased |
2005-06-23 | Well Log Performed |
2005-06-24 | Drill Stem Test Performed |
2005-06-25 | Drill Stem Test Performed |
2005-06-27 | Drill Stem Test Performed |
2005-06-29 | Production Casing Operation Performed |
2005-06-29 | Rig Released |
2005-08-01 | Well Began Production |
2005-08-01 | Well Fluid changed to Gas |
2005-08-01 | Well Mode changed to Flowing |
2005-08-24 | Perforation Treatment Performed - Jet Perforation |
2005-08-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-12-19 | Perforation Treatment Performed - Jet Perforation |
2006-12-21 | Perforation Treatment Performed - Fractured |
2014-06-30 | Well Fluid changed to Gas |
2014-06-30 | Well Mode changed to Suspended |
2017-11-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-11-13 | Plug Back Performed |
2017-11-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-11-14 | Plug Back Performed |
2017-11-14 | Well Fluid changed to Gas |
2017-11-14 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-08-24 | Perforation | 1180.50 | 1182.00 | 13 |
2005-08-25 | Acid Treatment | 1180.50 | 1182.00 | 0 |
2006-12-19 | Perforation | 1171.50 | 1172.50 | 17 |
2006-12-21 | Fracture | 1171.50 | 1172.50 | 0 |
2017-11-13 | Packing Device Capped w/Cement | 1171.00 | 1179.00 | 0 |
2017-11-14 | Packing Device Capped w/Cement | 1156.00 | 1164.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 2102 | 0.0 | 0.0 | 0.0 |
2006 | 3206 | 0.0 | 0.0 | 0.0 |
2007 | 1654 | 0.0 | 0.0 | 0.0 |
2010 | 170 | 0.0 | 0.0 | 0.0 |
2011 | 56 | 0.0 | 0.0 | 0.0 |
2012 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-11-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]