X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585042908000

Well Details

Well ID: 0585042908000
Loading map...
Location: 00/08-29-058-04W5/0
Location Alias: 00/08-29-58-04 W5M
Location Alias 2: 00/08-29-058-04 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 04
Section: 29
County/Municipality: County of Barrhead No. 11
Well Name: AXIOM NEWTON 8-29-58-4
Operator Name: Axiom Oil and Gas Inc.
License Number: 0221026
License Date: 1999-01-27
License Status: Abandoned
Spud Date: 1999-02-08
Final Drill Date: 1999-02-12
Well Total Depth: 1219.00 m
Surface Hole Latitude: 54.042004
Surface Hole Longitude: -114.552688

For data sources see[1][2]

Well History

Date Event
1999-01-27 Obtained License
1999-02-09 Surface Casing Operation Performed
1999-02-12 Finished Drilling
1999-02-12 Production Casing Operation Performed
1999-02-12 Well Log Performed
1999-02-13 Drill Stem Test Performed
1999-02-13 Well Log Performed
1999-02-14 Drill Stem Test Performed
1999-02-15 Rig Released
1999-02-15 Well Mode changed to Drilled and Cased
1999-07-20 Perforation Treatment Performed - Jet Perforation
1999-07-22 Perforation Treatment Performed - Fractured
2002-05-22 Perforation Treatment Performed - Jet Perforation
2002-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-05-23 Well Log Performed
2002-05-24 Perforation Treatment Performed - Remedial Casing
2011-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-16 Plug Back Performed
2011-02-16 Well Mode changed to Abandoned Zone
2011-03-06 Perforation Treatment Performed - Jet Perforation
2011-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-07 Perforation Treatment Performed - Jet Perforation
2011-03-07 Plug Back Performed
2011-03-08 Perforation Treatment Performed - Cement Plug
2011-03-08 Perforation Treatment Performed - Cement Squeeze
2011-03-08 Plug Back Performed
2011-03-09 Perforation Treatment Performed - Jet Perforation
2011-03-13 Perforation Treatment Performed - Cement Squeeze
2011-03-13 Plug Back Performed
2011-03-14 Perforation Treatment Performed - Jet Perforation
2011-03-15 Perforation Treatment Performed - Cement Squeeze
2011-03-15 Plug Back Performed
2011-03-18 Perforation Treatment Performed - Jet Perforation
2011-03-22 Perforation Treatment Performed - Cement Squeeze
2011-03-22 Plug Back Performed
2011-03-23 Perforation Treatment Performed - Jet Perforation
2011-03-28 Perforation Treatment Performed - Cement Squeeze
2011-03-28 Plug Back Performed
2011-03-29 Perforation Treatment Performed - Jet Perforation
2011-03-30 Perforation Treatment Performed - Cement Squeeze
2011-03-30 Plug Back Performed
2011-04-01 Perforation Treatment Performed - Cement Plug
2011-04-01 Plug Back Performed
2011-05-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-05-07 Perforation Treatment Performed - Jet Perforation
2011-05-07 Plug Back Performed
2011-05-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-05-09 Plug Back Performed
2011-05-12 Well Abandoned
2011-05-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-07-20 Perforation 1142.50 1146.50 17
2011-03-07 Perforation 660.00 662.00 17
2011-03-07 Perforation 660.00 662.00 20
2011-03-08 Cement Squeeze 660.00 662.00 0
2011-03-08 Cement Plug 648.00 656.00 0
2011-03-09 Perforation 595.00 597.00 17
2011-03-09 Perforation 595.00 597.00 20
2011-03-13 Cement Squeeze 595.00 597.00 0
2011-03-14 Perforation 523.00 525.00 17
2011-03-14 Perforation 523.00 525.00 20
2011-03-14 Perforation 518.00 520.00 17
1999-07-22 Fracture 1142.50 1146.50 0
2011-03-15 Cement Squeeze 523.00 525.00 0
2011-03-15 Cement Squeeze 518.00 520.00 0
2011-03-18 Perforation 486.00 488.00 20
2011-03-18 Perforation 486.00 488.00 17
2011-03-18 Perforation 472.00 474.00 20
2011-03-18 Perforation 472.00 474.00 17
2011-03-22 Cement Squeeze 486.00 488.00 0
2011-03-22 Cement Squeeze 472.00 474.00 0
2011-03-23 Perforation 419.00 420.00 20
2011-03-23 Perforation 419.00 420.00 17
2002-05-22 Perforation 400.00 401.00 14
2011-03-23 Perforation 446.00 448.00 20
2011-03-28 Cement Squeeze 446.00 448.00 0
2011-03-28 Cement Squeeze 419.00 420.00 0
2011-03-29 Perforation 374.00 376.00 17
2011-03-29 Perforation 374.00 376.00 20
2011-03-30 Cement Squeeze 374.00 376.00 0
2011-04-01 Cement Plug 366.00 374.00 0
2011-05-07 Perforation 346.00 348.00 20
2011-05-07 Perforation 346.00 348.00 17
2011-05-07 Packing Device Capped w/Cement 335.00 343.00 0
2002-05-23 Acid Treatment 400.00 401.00 0
2011-05-07 Perforation 305.00 307.00 20
2011-05-07 Perforation 305.00 307.00 17
2011-05-09 Packing Device Capped w/Cement 284.00 298.00 0
2002-05-24 Remedial Casing Cementing 400.00 401.00 0
2011-02-16 Packing Device Capped w/Cement 1127.00 1135.00 0
2011-03-06 Perforation 1008.00 1010.00 17
2011-03-06 Perforation 1008.00 1010.00 20
2011-03-07 Packing Device Capped w/Cement 996.00 1004.00 0

For data sources see[4]



References