If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0585042908000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.042004,"lon":-114.552688,"icon":""}]} |
Location: 00/08-29-058-04W5/0 | |
Location Alias: 00/08-29-58-04 W5M | |
Location Alias 2: 00/08-29-058-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 5 | |
Range: 04 | |
Section: 29 | |
County/Municipality: County of Barrhead No. 11 | |
Well Name: AXIOM NEWTON 8-29-58-4 | |
Operator Name: Axiom Oil and Gas Inc. | |
License Number: 0221026 | |
License Date: 1999-01-27 | |
License Status: Abandoned | |
Spud Date: 1999-02-08 | |
Final Drill Date: 1999-02-12 | |
Well Total Depth: 1219.00 m | |
Surface Hole Latitude: 54.042004 | |
Surface Hole Longitude: -114.552688 |
Date | Event |
---|---|
1999-01-27 | Obtained License |
1999-02-09 | Surface Casing Operation Performed |
1999-02-12 | Finished Drilling |
1999-02-12 | Production Casing Operation Performed |
1999-02-12 | Well Log Performed |
1999-02-13 | Drill Stem Test Performed |
1999-02-13 | Well Log Performed |
1999-02-14 | Drill Stem Test Performed |
1999-02-15 | Rig Released |
1999-02-15 | Well Mode changed to Drilled and Cased |
1999-07-20 | Perforation Treatment Performed - Jet Perforation |
1999-07-22 | Perforation Treatment Performed - Fractured |
2002-05-22 | Perforation Treatment Performed - Jet Perforation |
2002-05-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-05-23 | Well Log Performed |
2002-05-24 | Perforation Treatment Performed - Remedial Casing |
2011-02-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-02-16 | Plug Back Performed |
2011-02-16 | Well Mode changed to Abandoned Zone |
2011-03-06 | Perforation Treatment Performed - Jet Perforation |
2011-03-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-07 | Perforation Treatment Performed - Jet Perforation |
2011-03-07 | Plug Back Performed |
2011-03-08 | Perforation Treatment Performed - Cement Plug |
2011-03-08 | Perforation Treatment Performed - Cement Squeeze |
2011-03-08 | Plug Back Performed |
2011-03-09 | Perforation Treatment Performed - Jet Perforation |
2011-03-13 | Perforation Treatment Performed - Cement Squeeze |
2011-03-13 | Plug Back Performed |
2011-03-14 | Perforation Treatment Performed - Jet Perforation |
2011-03-15 | Perforation Treatment Performed - Cement Squeeze |
2011-03-15 | Plug Back Performed |
2011-03-18 | Perforation Treatment Performed - Jet Perforation |
2011-03-22 | Perforation Treatment Performed - Cement Squeeze |
2011-03-22 | Plug Back Performed |
2011-03-23 | Perforation Treatment Performed - Jet Perforation |
2011-03-28 | Perforation Treatment Performed - Cement Squeeze |
2011-03-28 | Plug Back Performed |
2011-03-29 | Perforation Treatment Performed - Jet Perforation |
2011-03-30 | Perforation Treatment Performed - Cement Squeeze |
2011-03-30 | Plug Back Performed |
2011-04-01 | Perforation Treatment Performed - Cement Plug |
2011-04-01 | Plug Back Performed |
2011-05-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-05-07 | Perforation Treatment Performed - Jet Perforation |
2011-05-07 | Plug Back Performed |
2011-05-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-05-09 | Plug Back Performed |
2011-05-12 | Well Abandoned |
2011-05-12 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-07-20 | Perforation | 1142.50 | 1146.50 | 17 |
2011-03-07 | Perforation | 660.00 | 662.00 | 17 |
2011-03-07 | Perforation | 660.00 | 662.00 | 20 |
2011-03-08 | Cement Squeeze | 660.00 | 662.00 | 0 |
2011-03-08 | Cement Plug | 648.00 | 656.00 | 0 |
2011-03-09 | Perforation | 595.00 | 597.00 | 17 |
2011-03-09 | Perforation | 595.00 | 597.00 | 20 |
2011-03-13 | Cement Squeeze | 595.00 | 597.00 | 0 |
2011-03-14 | Perforation | 523.00 | 525.00 | 17 |
2011-03-14 | Perforation | 523.00 | 525.00 | 20 |
2011-03-14 | Perforation | 518.00 | 520.00 | 17 |
1999-07-22 | Fracture | 1142.50 | 1146.50 | 0 |
2011-03-15 | Cement Squeeze | 523.00 | 525.00 | 0 |
2011-03-15 | Cement Squeeze | 518.00 | 520.00 | 0 |
2011-03-18 | Perforation | 486.00 | 488.00 | 20 |
2011-03-18 | Perforation | 486.00 | 488.00 | 17 |
2011-03-18 | Perforation | 472.00 | 474.00 | 20 |
2011-03-18 | Perforation | 472.00 | 474.00 | 17 |
2011-03-22 | Cement Squeeze | 486.00 | 488.00 | 0 |
2011-03-22 | Cement Squeeze | 472.00 | 474.00 | 0 |
2011-03-23 | Perforation | 419.00 | 420.00 | 20 |
2011-03-23 | Perforation | 419.00 | 420.00 | 17 |
2002-05-22 | Perforation | 400.00 | 401.00 | 14 |
2011-03-23 | Perforation | 446.00 | 448.00 | 20 |
2011-03-28 | Cement Squeeze | 446.00 | 448.00 | 0 |
2011-03-28 | Cement Squeeze | 419.00 | 420.00 | 0 |
2011-03-29 | Perforation | 374.00 | 376.00 | 17 |
2011-03-29 | Perforation | 374.00 | 376.00 | 20 |
2011-03-30 | Cement Squeeze | 374.00 | 376.00 | 0 |
2011-04-01 | Cement Plug | 366.00 | 374.00 | 0 |
2011-05-07 | Perforation | 346.00 | 348.00 | 20 |
2011-05-07 | Perforation | 346.00 | 348.00 | 17 |
2011-05-07 | Packing Device Capped w/Cement | 335.00 | 343.00 | 0 |
2002-05-23 | Acid Treatment | 400.00 | 401.00 | 0 |
2011-05-07 | Perforation | 305.00 | 307.00 | 20 |
2011-05-07 | Perforation | 305.00 | 307.00 | 17 |
2011-05-09 | Packing Device Capped w/Cement | 284.00 | 298.00 | 0 |
2002-05-24 | Remedial Casing Cementing | 400.00 | 401.00 | 0 |
2011-02-16 | Packing Device Capped w/Cement | 1127.00 | 1135.00 | 0 |
2011-03-06 | Perforation | 1008.00 | 1010.00 | 17 |
2011-03-06 | Perforation | 1008.00 | 1010.00 | 20 |
2011-03-07 | Packing Device Capped w/Cement | 996.00 | 1004.00 | 0 |
For data sources see[4]