If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0585031704002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.010396,"lon":-114.418723,"icon":""}]} |
| Location: 00/04-17-058-03W5/2 | |
| Location Alias: 00/04-17-58-03 W5M | |
| Location Alias 2: 00/04-17-058-03 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 058 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 17 | |
| County/Municipality: County of Barrhead No. 11 | |
| Well Name: ALO NEWTON 4-17-58-3 | |
| Operator Name: Alston Energy Inc. | |
| License Number: 0205662 | |
| License Date: 1997-09-03 | |
| License Status: Abandoned | |
| Spud Date: 1997-09-17 | |
| Final Drill Date: 1997-09-21 | |
| Well Total Depth: 1209.00 m | |
| Surface Hole Latitude: 54.010396 | |
| Surface Hole Longitude: -114.418723 |
| Date | Event |
|---|---|
| 1997-09-03 | Obtained License |
| 1997-09-21 | Finished Drilling |
| 1997-09-21 | Well Log Performed |
| 1997-09-21 | Well Mode changed to Drilled and Cased |
| 1997-09-22 | Drill Stem Test Performed |
| 1997-09-22 | Well Log Performed |
| 1997-09-23 | Drill Stem Test Performed |
| 1997-09-24 | Production Casing Operation Performed |
| 1997-09-24 | Rig Released |
| 1997-10-16 | Perforation Treatment Performed - Jet Perforation |
| 1997-10-16 | Well Log Performed |
| 1997-10-29 | Well Log Performed |
| 1997-11-18 | Perforation Treatment Performed - Fractured |
| 1998-01-29 | Well Began Production |
| 1998-01-29 | Well Fluid changed to Gas |
| 1998-01-29 | Well Mode changed to Flowing |
| 1998-03-04 | Well Fluid changed to Gas |
| 1998-03-04 | Well Mode changed to Suspended |
| 1998-03-22 | Well Log Performed |
| 1998-03-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-03-23 | Perforation Treatment Performed - Jet Perforation |
| 1998-03-23 | Plug Back Performed |
| 1998-03-24 | Perforation Treatment Performed - Cement Squeeze |
| 1998-03-26 | Well Log Performed |
| 1998-03-27 | Perforation Treatment Performed - Jet Perforation |
| 1998-04-08 | Perforation Treatment Performed - Fractured |
| 1998-08-10 | Well Log Performed |
| 1998-08-11 | Perforation Treatment Performed - Jet Perforation |
| 1998-08-20 | Perforation Treatment Performed - Fractured |
| 1998-08-24 | Well Fluid changed to Gas |
| 1998-08-24 | Well Mode changed to Suspended |
| 2017-09-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-09-05 | Plug Back Performed |
| 2017-09-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-09-06 | Plug Back Performed |
| 2017-09-06 | Well Fluid changed to Gas |
| 2017-09-06 | Well Mode changed to Abandoned Zone |
| 2017-10-10 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1997-10-16 | Perforation | 1157.50 | 1159.50 | 14 |
| 1998-08-11 | Perforation | 1044.00 | 1048.00 | 13 |
| 1998-08-20 | Fracture | 1044.00 | 1048.00 | 0 |
| 2017-09-05 | Packing Device Capped w/Cement | 1031.00 | 1039.00 | 0 |
| 2017-09-06 | Packing Device Capped w/Cement | 960.00 | 968.00 | 0 |
| 2017-09-06 | Packing Device Capped w/Cement | 922.00 | 930.00 | 0 |
| 1997-10-16 | Perforation | 1164.50 | 1166.50 | 14 |
| 1997-10-16 | Perforation | 1168.00 | 1170.00 | 14 |
| 1997-11-18 | Fracture | 1157.50 | 1170.00 | 0 |
| 1998-03-23 | Packing Device Capped w/Cement | 1112.00 | 1120.00 | 0 |
| 1998-03-23 | Perforation | 940.50 | 941.50 | 13 |
| 1998-03-24 | Cement Squeeze | 940.50 | 941.50 | 0 |
| 1998-03-27 | Perforation | 970.00 | 971.50 | 13 |
| 1998-04-08 | Fracture | 970.00 | 971.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1998 | 808 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-09-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]